My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/04/20 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/04/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 3:15:24 PM
Creation date
4/21/2022 11:28:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CONSULTANT will submit a quality plan for the project, which covers the QA/QC <br />procedures and documents that will be submitted for the project by the Consultant team <br />including all Subconsultants. <br />Deliverables: <br />• Meeting agenda and minutes (up to 12). <br />• Monthly invoices and progress reports (8). <br />• Quality Plan <br />2. DATA COLLECTION AND REVIEW <br />The CONSULTANT will conduct field reviews throughout the project area to identify and <br />assess all components that affect signal and curb ramp design, which includes curb ramp <br />slopes and dimensions, traffic signal controller and cabinet type, make, brand, software, <br />and versions, junction boxes, existing conduit pathing, and wiring. <br />Data will be collected before field reviews and reviewed in the office (including as -built <br />plans and aerial photos), and with input from the City of Everett, to ensure efficient field <br />visits are executed. <br />3. TOPOGRAPHIC SURVEY <br />Survey Limits: <br />The limits of the survey are at 41 st St/ Colby Ave and W Marine View Dr/ California St <br />intersections. The survey should include all approaches 50' beyond the intersection curb <br />returns. The survey should cover 10' behind ROW limit or face of building throughout the <br />project limits. <br />1. Survey Control: Existing monuments will be located, and control points set which will <br />be used for mapping and horizontal and vertical control during construction. The <br />survey will be oriented to horizontal and vertical datums of NAD83/2011 and <br />NAVD88 respectively. <br />2. Topographic Mapping: The following items shall be mapped during field survey: <br />a. Curbs, edge of pavement and flowline <br />b. Face of walk and back of walk <br />c. Curb ramps <br />d. Channelization <br />e. Driveways, stairs, bus shelters, utility poles, and other visible features <br />f. Grade brakes <br />g. Utility castings and street monuments <br />h. Signal poles and cross arms, push button pedestals and <br />i. Trees (greater than 8" DBH) within the limits of work <br />j. Utility locates shall be mapped — per private utility locate consultant <br />City of Everett 4 DKS <br />
The URL can be used to link to this page
Your browser does not support the video tag.