Laserfiche WebLink
o Evaluate and upgrade curb ramps at the NE, and SE corner as needed. <br />o Install APS pushbutton and posts as needed to meet ADA requirements. <br />o Traffic signal controller cabinet and foundation will remain. <br />• At W Marine View Dr/ California St, ADA curb ramp improvements at completing <br />a resurface of South 12th Street. <br />o Replace two concrete mast arm poles with type 3 mast arm poles. <br />o Traffic signal controller cabinet and foundation will remain. <br />The 60% design includes the following plan sheets: <br />Cover 1 <br />Legend and Notes 1 <br />Survey and alignment 2 <br />Legend and notes 1 <br />Demolition & Site preparation 2 <br />Intersection layout 2 <br />Curb ramp details 3 <br />Traffic Signal Layout 2 <br />Signal Detection Plan 2 <br />Signal Phasing and Wire Schedule 2 <br />Signal Details 1 <br />Pole Schedules 2 <br />Total Number of Sheets 21 <br />The CONSULTANT will prepare 60% specifications for Divisions 2 through9. The City <br />will be responsible for the preparation of Division 1 of the project specifications. <br />The CONSULTANT will perform quantity takeoffs and prepare a 60% estimate of <br />probable construction costs. <br />Deliverables: <br />• 10% design layout exhibits. <br />• 60% PS&E design package (PDF and Excel formats and CAD files). <br />• Street lighting analysis memo. <br />6. 90% DESIGN SUBMITTAL <br />City of Everett 6 DKS <br />