Laserfiche WebLink
12 <br />I <br />ADDI I ]ON <br />IF THIS PLAN IS NOT ON 22x34 PAPER, IT HAS BEEN SCALED ACCORDINGLY <br />cb <br />12 <br />5 <br />7-0" (ADDITION -BEYOND) <br />35'-10" (EXISTING) <br />PARTIAL REAR (WEST) ELEVATION SCALE: 1/4"=T-0" 2 PARTIAL LEFT (SOUTH) ELEVATION SCALE: 1/4"=T-011 <br />12 <br />----,15 <br />ADDITION <br />3 1 PARTIAL RIGHT (NORTH) ELEVATION <br />SCALE: 1/4`=1'-0" <br />I <br />ROOF ASSEMBLY: <br />COMPOSITE ROOFING (COLOR & STYLE BY OWNER) ATOP <br />ROLLED UNDERLAYMENT (TYVEK PROTECS OR SIMILAR) ATOP <br />12 112" SHEATHING ATTACHED TO PRE-MFD TRUSSES @ 24"o.c. <br />5 ATTACH (1) LAYER 5/8" GWB TO CEILING. <br />INSULATE ATTIC AREA WITH MIN. R-49 BATT OR BLOWN INSULATION. <br />COR-A-VENT INVENT 5'UP RAKE <br />NO VENTING AT SOFFIT <br />WALL ASSEMBLY: <br />LAP SIDING TO MATCH EXISTING ATOP <br />ROLLED VAPOR BARRIER (TYPARO OR SIMILAR) <br />ATOP 112" SHEATHING ATTACHED TO 2x6 @ 16"o.c. <br />ATTACH (2) LAYER 1/2" TYPE 'X'GWB TO INSIDE FACE <br />AROUND HEADER, TRIMMERS, ETC. WITH CLOSED <br />CELL SPRAY FOAM INSULATION. <br />I L FLOORING TO MATCH EXISTING ATOP <br />1/4" T&G GLUED AND NAILED TO I -JOIST w/ RING OR SCREW <br />SHANK NAILS. tv <br />0-- ATTACH (1) LAYER CEMENTUOUS'SOFFIT TO COMPLETE P.T. 6x6 PER PLAN <br />UNDERSIDE OF FLOOR AREA. <br />FULLY INSULATE EACH JOIST BAY WITH CLOSED CELL <br />SPRAY FOAM INSULATION. <br />4 1 CROSS SECTION A -A <br />36" <br />sn <br />SCALE: 3/8"=T-0" <br />U <br />1 <br />Z <br />tqo <br />C6 <br />o <br />-.0 <br />Lin <br />z <br />E <br />co <br />Q <br />C:) 0 <br />= <br />8 <br />L.L <br />z <br />0 <br />(\j <br />Qa <br />ILD <br />cli <br />M <br />113n, <br />g' <br />h <br />2 g <br />'E <br />110 <br />U <br />c <br />0 <br />c <br />cy-0 <br />C—D <br />(\I <br />LLJ <br />> <br />< 0-) <br />ca <br />CU <br />U <br />:3 M <br />3: <br />=) <br />tA <br />= <br />0 <br />ry) 2)W <br />W <br />CL <br />> <br />LLJ <br />c <br />0 <br />Pion Title <br />Elevations <br />Drawn <br />Douglas Almond <br />Date <br />07/11/2021 <br />Project No. <br />21-043-01 <br />Plan Revisions ­41) <br /><3> 08/11/2021 <br />09/14/2021 <br />O <br />Sheet: <br />03 <br />Of. - <br />