I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> IThe lump sum bid item for Existing Building HVAV shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary and <br /> I incidental to furnish and install HVAC work at the facility. Work shall include, <br /> but not be limited to HVAC permits and inspection fees, backdraft dampers, <br /> louvers, required commissioning, all requirements as shown on the Plans and <br /> I <br /> as described in Division 23, HVAC. <br /> Bid Item 33. New Building HVAC <br /> Measurement and Payment: Lump Sum <br /> IThe lump sum bid item for New Electrical Building HVAV shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary and <br /> incidental to furnish and install HVAC work at the facility. Work shall include, <br /> I but not be limited to HVAC permits and inspection fees, split heat pump, <br /> ductwork, grilles, balancing dampers, supports, isolators, refrigerant piping, <br /> drain piping, test and balance, required commissioning, all requirements as <br /> Ishown on the Plans and as described in Division 23, HVAC. <br /> Bid Item 34. Electrical <br /> IMeasurement and Payment: Lump Sum <br /> The lump sum bid item for Electrical shall constitute full compensation for all <br /> labor, materials, tools and equipment necessary and incidental to furnish and <br /> Iinstall all Electrical work at the facility shall include, but not be limited to <br /> electrical permits and inspection fees, raceways, supports, ductbanks, <br /> conductors, grounding, trenching and backfill for electrical raceways, circuit <br /> I breakers, disconnect switches, transformers, panelboards, medium-voltage <br /> switchgear, medium-voltage variable frequency controllers, receptacles, <br /> lighting, lighting controls, cameras and security equipment, electrical <br /> I connections for mechanical equipment, instrumentation and controls as <br /> shown on the Plans and as described in Division 26 Electrical, Division 28 <br /> Security, and Division 40 Instrumentation and Controls. <br /> IBid Item 35. Electronic Surge Control Panel <br /> Measurement and Payment: Each <br /> I The bid item per each for Electronic Surge Control Panel shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary and <br /> incidental to furnish and install electronic surge control panels at the existing <br /> I Evergreen Pump Station. Work shall include but not limited to, install control <br /> panel per manufacturer's recommendations and furnishing, installing all <br /> piping, fittings, equipment, and materials needed to connect the new surge <br /> I <br /> control panels to the existing surge pilot system as shown on the Plans and <br /> as described in Division 33, Section 33 12 23.13, and checking and/or <br /> servicing the existing pilot system to verify all valves, switches, and solenoids <br /> are in proper working order. If any pilot system parts need to be replaced, this <br /> IWork will be paid under the Bid Item "Minor Changes." <br /> Also included in this Bid Item is the training provided by the Cla-Val and <br /> I Cimco-GC Systems representatives. <br /> Costs to provide the Cla-Val and Cimco-GC Systems representatives for <br /> startup and testing shall be included under Bid Item "Startup and Testing." <br /> IBid Item 36. Site Restoration <br /> City of Everett 01 22 20-19 January 2022 <br /> Evergreen Pump Station Modifications <br /> IUP3747-3 <br />