My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> EVERETT <br /> PUBLIC WORKS <br /> I <br /> ADDENDUM NO. 3 TO <br /> EVERGREEN PUMP STATION MODIFICATIONS <br /> W.O. #UP3747-3 <br /> JANUARY 28, 2022 <br /> NOTICE TO PLANHOLDERS <br /> Addendum No. 3 contains the following revisions, additions, deletions, and clarifications <br /> and is hereby made a part of the contract documents for the above-named Project and <br /> 1 shall be considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 3 in the space provided on page <br /> 00 41 13-4 in the Bid Form. Failure to comply with this requirement may render the Bid <br /> non-responsive and may cause its rejection. <br /> 1 This Addendum No. 3 consists of 58 pages, including all revisions, attachments, an d <br /> details. <br /> The Bid date for receipt of Bids has been changed by this Addendum. <br /> DRAWINGS <br /> i <br /> Item 1 - DRAWING C5, CIVIL DETAILS, SHEET 11 OF 59. <br /> Drawing C5 is REPLACED in its entirety with the attached revised drawing. <br /> Drawing revisions have been clouded. <br /> Item 2 - DRAWING E3, ELECTRICAL ONE-LINE DIAGRAM, SHEET 42 OF 59. <br /> Drawing E3 is REPLACED in its entirety with the attached revised drawing. <br /> Drawing revisions have been clouded. <br /> Item 3 - DRAWING El 1, CONDUIT, TRANSFORMER AND MOTOR SCHEDULES, <br /> SHEET 50 OF 59. <br /> I <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 1/17 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.