My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Drawing El 1 is REPLACED in its entirety with the attached revised drawing. <br /> Drawing revisions have been clouded. I <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Item 4 - SPECIFICATION 00 11 13, ADVERTISEMENT FOR BIDS, Page 1, 1 <br /> Paragraph 1, first sentence. <br /> The first sentence is REPLACED with the following: 1 <br /> Notice is hereby given that sealed bids for the Evergreen Pump Station <br /> Modifications project will be received at the Purchasing Counter, 3200 Cedar <br /> Street, Door#5, Everett, WA 98201, until 2:00 p.m. on Tuesday February <br /> 15, 2022. 1 <br /> Item 5 - SPECIFICATION 00 25 13, PRE-BID MEETING. <br /> Specification 00 25 13 is DELETED in its entirety. 1 <br /> Item 6 - SPECIFICATION 00 41 13, BID FORM. <br /> 00 41 13 BID FORM is REPLACED in its entirety with the attached. <br /> The bid form was updated to reflect an error in the estimated quantity for Bid <br /> Item 17, PVC Pipe, SDR 35, Solid Wall, 6-Inch Diam. <br /> Item 7 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 8, 1 <br /> Section 1.11.D <br /> Bid Item 9 in Section 01 22 20 1.11.D is REPLACED with the following: I <br /> Bid Item 9. Demolition <br /> The lump sum (LS) Contract Price for "Demolition" shall be full <br /> compensation for costs of all Work, labor, tools, materials, equipment, and <br /> incidentals necessary to remove the items or materials identified on the <br /> Plans and as necessary for construction. <br /> Payment for furnishing, placing, and compacting the imported gravel I <br /> borrow material in the vacant trenches left after the removal of the 36-inch <br /> RCP overflow and drain pipe and leak detection pipe under the new <br /> electrical building will be made under the bid item "Gravel Borrow." I <br /> Item 8 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 9, <br /> Section 1.11.D. I <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 2/17 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax (425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.