Laserfiche WebLink
Section 00 41 13 BID FORM I <br /> ITEM ESTIMATED UNIT CONTRACT <br /> I <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> 1. Mobilization LS 1 $ $ <br /> I <br /> 2. Construction Surveying LS 1 $ . $ <br /> Maintenance and <br /> 3. Protection of Traffic LS 1 $ $ <br /> Control <br /> 4. SPCC Plan LS 1 $ $ I <br /> Construction <br /> 5. Stormwater General LS 1 $ $ . <br /> Permit and SWPPP I <br /> 6 Type B Progress LS 1 $ $ <br /> Schedule <br /> Trench Excavation <br /> 7. Safety Systems LS 1 $ $ <br /> 8 Resolution of Utility FA 5,000 $1.00 $5,000.00 <br /> Conflicts <br /> 1 <br /> 9. Demolition LS 1 $ . $ . <br /> 10. Removal of Unsuitable CY 50 $ $ I <br /> Material <br /> 11. Site Grading SY 1,000 $ $ . <br /> 12. Controlled Density Fill CY 5 $ $ • 1 <br /> (CDF) <br /> Crushed Surfacing Top <br /> 13. and Base Course TON 75 $ $ I <br /> 14. Gravel Borrow TON 306 $ $ . <br /> 15. Foundation Material, TON 61 $ $ I <br /> Class A or B <br /> 16. HMA Class 1/2" PG 64- TON 40 $ • $ <br /> 22I <br /> PVC Pipe, SDR 35, <br /> 17. Solid Wall, 6-Inch LF 10 $ . $ <br /> Diam. I <br /> PVC Pipe, SDR 35, <br /> 18. Perforated, 6-Inch LF 144 $ $ <br /> Diam. <br /> I <br /> PVC Pipe, SDR 26, <br /> 19. Solid Wall, 36-Inch LF 30 $ . $ . <br /> Diam. <br /> I <br /> DI Pipe, Class 52, 36- <br /> 20. Inch Diam. LF 55 $ $ . <br /> Full Profile Insertion <br /> 21. Mag Flow Meter LS 1 $ $ I <br /> City of Everett 00 41 13-2 January 2022 I <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />