My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISection 00 41 13 BID FORM <br /> I ITEM ESTIMATED UNIT CONTRACT <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> Insertion Flow Meter <br /> I 22. Manhole, Type 3, 72- EA 1 $ • $ <br /> Inch <br /> 23 Manhole, Type 3, 72- EA 2 $I $ <br /> Inch <br /> 24 Manhole, Type 3, 84- EA 1 $ $ <br /> Inch <br /> I25. Manhole Sump Pump LS 1 $ . $ . <br /> 26. Bollards EA 4 $ $ . <br /> IRelocate Leak <br /> 27. Detection Pipe and LF 205 $ • $ <br /> Meter <br /> 28. Erosion/Water Pollution LS 1 $ $ <br /> Control <br /> I29. Soil Quality and Depth SY 184 $ $ <br /> 30. Concrete Block LF 130 $ $ . <br /> Retaining Wall <br /> Electrical Building <br /> 31. Structure LS 1 $ • $ <br /> Existing Pump Station <br /> I 32. Building Seismic LS 1 $ $ <br /> Upgrade <br /> 33. Existing Building HVAC LS 1 $ $ <br /> I34. New Building HVAC LS 1 $ . $ . <br /> I35 Electrical LS 1 $ $ <br /> 36. Electronic Surge EA 3 $ • $ <br /> I Control Panel <br /> 37. SnoPUD Charges LS 1 $ $ <br /> I38. Site Restoration LS 1 $ . $ . <br /> 39. Startup and Testing LS 1 $ . $ <br /> P40. Record Drawings LS 1 $ . $ . <br /> I41. Minor Changes FA 100,000 $1.00 $100,000.00 <br /> SUBTOTAL $ <br /> IWashington State Sales Tax @ 9.8% $ . <br /> TOTAL BID $ . <br /> ICity of Everett 00 41 13-3 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.