My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> I <br /> I <br /> Item 10 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 11, <br /> Section 1.11.D. I <br /> Bid Item 17 in Section 01 22 20 1.11.D is REVISED as follows: <br /> Remove the first sentence from Item 1, which states, "Removal of 1 <br /> structures or obstructions not specifically covered under other Bid Items." <br /> Item 11 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 12, 1 <br /> Section 1.11.D. <br /> Bid Item 18 in Section 01 22 20 1.11.D is REVISED as follows: I <br /> Remove the first sentence from Item 1, which states, "Removal of <br /> structures or obstructions not specifically covered under other Bid Items." <br /> Item 12 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 13, <br /> Section 1.11.D. I <br /> Bid Item 19 in Section 01 22 20 1.11.D is REVISED as follows: <br /> Remove the first sentence from Item 1, which states, "Removal of <br /> structures or obstructions not specifically covered under other Bid Items." <br /> Item 13 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 15, <br /> Section 1.11.D. <br /> Bid Item 20 in Section 01 22 20 1.11.D is REVISED as follows: <br /> Remove the first sentence from Item 1, which states, "Removal of <br /> structures or obstructions not specifically covered under other Bid Items." <br /> Item 14 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 16, <br /> 111 <br /> Section 1.11.D. <br /> Bid Item 22 in Section 01 22 20 1.11.D is REPLACED with the following: I <br /> Bid Item 22. Insertion Flow Meter Manhole, Type 3, 72-Inch <br /> The unit Contract Price bid per each (EA) for "Insertion Flow Meter I <br /> Manhole, Type 3, 72-Inch" shall constitute full compensation for all Work, <br /> labor, materials, tools, and equipment necessary to furnish and install the <br /> manhole as shown on the Plans or as required by the Specifications, and <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 4/17 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax (425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.