My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> Item 24 - SPECIFICATION 31 61 00, DRILLED MICROPILES, Page 6, Section 3.03. <br /> Section 3.03 is REVISED as follows: <br /> 3.03 VERIFICATION AND PROOF TESTS <br /> A. Perform TENSION verification and proof testing of piles as described below and <br /> shown on the Drawings. Perform comprnscion load tooting accordanc ith <br /> �.y � uvvv��awwt.w�[rr <br /> ASTM D1113 and tension load testing in accord with�ASTM D3689, except as <br /> modified herein. <br /> B. Perform pre-production verification pile load test to verify the design of the pile <br /> system and the construction methods proposed prior to installing any production <br /> piles. The verification pile shall be located in the area of close proximity to the <br /> PUMP BUILDING,digester as and at a location approved by the Engineer. The <br /> sacrificial verification test pile shall be constructed in conformance with the <br /> approved Contractor Design Drawings. <br /> C. Verification load test(s) shall be performed to verify that the Contractor installed <br /> micropiles will meet the compression and/or tensile load capacities and load test <br /> acceptance criteria and to verify the length of the micropile load transfer bond <br /> zone is adequate. The micropile verification load test results must verify the <br /> Contractor's design and installation methods. The drilling methods and pile <br /> assembly shall be the same as the production piles. <br /> ' D. Testing equipment shall include dial gauges, dial gauge independent reference <br /> frame, jack and pressure gauge, electronic load cell (with readout device), and a <br /> reaction frame. The load cell is required only for the creep test portion of the <br /> verification test. The contractor shall provide a description of test setup and jack, <br /> pressure gauge and load cell calibration curves in accordance with Section <br /> 01300 - Project Data Submittals. <br /> E. The test load shall be applied in increments of 25 percent of the DL load. Each <br /> load increment shall be held for a minimum of 1 minute. Pile top movement shall <br /> be measured at each load increment. The load-hold period shall start as soon as <br /> each test load increment is applied. The verification test pile shall be monitored <br /> for creep at the 1.33 Design Load (DL). Pile movement during the creep test <br /> shall be measured and recorded at 1, 2, 3, 4, 5, 6, 10, 20, 30, 50, and 60 <br /> minutes. The alignment load shall not exceed 5 percent of the DL load. Dial <br /> gauges shall be reset to zero after the initial AL is applied. <br /> F. The acceptance criteria for micropile verification load test are: <br /> 1. The Engineer shall determine the criteria for tolerable movement during <br /> the load test at the top of the micropile. <br /> 2. At the end of the 1.33 DL creep test load increment, test piles shall have <br /> a creep rate not exceeding 0.05 0.04 inch/log cycle time (1 to 10 minutes) <br /> or 0.1 inch/log cycle time (6 to 60 minutes or the last log cycle if held <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 9/17 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br />
The URL can be used to link to this page