My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> longer). The creep rate shall be linear or decreasing throughout the I <br /> creep load hold period. <br /> 3. Failure does not occur at any load increment up to and including the 2.0 1 <br /> D.L. max test load. Failure is defined as load at which attempts to further <br /> increase the test load simply result in continued pile movement. <br /> G. Test verification piles to a maximum test load of 2.0 times the maximum I <br /> allowable Gemffessive load, hereafter termed, "Design Load", the loads as <br /> shown on the Plans. The verification pile load tests shall be made by <br /> incrementally loading the micropile in accordance with the following cyclic load III <br /> schedule for tension loading (test the compression prior to <br /> tension): <br /> I <br /> Verification Test Loading Schedule <br /> AL = Alignment Load DL = Design Load <br /> LOAD HOLD TIME <br /> 1 AL (.05 DL) 1 minute <br /> 2 0.25 DL 1 minute <br /> 3 0.50 DL 1 minute <br /> 4 AL 1 minute <br /> 5 0.25 DL 1 minute 1 <br /> 6 0.50 DL 1 minute <br /> 7 0.75 DL 1 minute 1 <br /> 8 AL 1 minute <br /> 9 0.25 DL 1 minute <br /> 10 0.50 DL 1 minute <br /> 11 0.75 DL 1 minute <br /> 12 1.00 DL 1 minute <br /> 13 AL 1 minute <br /> 111 <br /> 14 0.25 DL 1 minute <br /> 15 0.50 DL 1 minute <br /> 16 0.75 DL 1 minute <br /> 17 1.00 DL 1 minute <br /> 18 1.33 DL 60 minutes <br /> 19 1.75 DL 1 minute I <br /> 20 2.00 DL 10 minutes <br /> (Maximum Test Load) <br /> 23 AL 1 minute I <br /> H. Upon completion of the test, the Contractor shall submit a report of the test <br /> results for review and acceptance by the Engineer prior to beginning installation <br /> of production micropiles. This report shall include written confirmation of the <br /> verification micropile's capacity. If a verification tested micropile fails to meet the <br /> acceptance criteria, the Contractor shall modify the design, the construction <br /> procedure, or both. Any modifications of design or construction procedures or <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 10/17 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax (425)257-8882 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.