McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> I <br /> NORTH WALL APPARENT THICKNESS AND REINFORCING IS <br /> PROVIDED AS AN ATTACHMENT TO ADDENDUM 3. <br /> Q14. Sheet Si Section F states that the ultimate bond stress for the micropiles is to <br /> be 27psi. In our experience, the stated value is extremely conservative and will <br /> result in micropile lengths that are extremely long with very high deflections. Is <br /> it acceptable for the micropile designer to select an ultimate bond stress for the <br /> micropile design? <br /> RESPONSE: THE PILE SYSTEM IS A PERFORMANCE BASED DESIGN. <br /> THE BONDING CRITERIA IS PROVIDED FOR THE DESIGNER TO <br /> DETERMINE THE REQUIRED BONDING LENGTH. THE CONTRACTOR IS <br /> ' ULTIMATELY RESPONSIBLE TO PROVIDE A PILE SYSTEM THAT MEETS <br /> THE LOAD AND CREEP REQUIREMENTS OF THE SPECIFICATION. IF <br /> THE CONTRACTOR CHOOSES TO USE A HIGHER SKIN FRICTION AND, <br /> WHEN TESTED, IT DOES NOT MEET THE ACCEPTANCE CRITERIA, <br /> THEN A NEW DESIGN AND VERIFICATION TEST WILL NEED TO BE <br /> PERFORMED AT THE EXPENSE OF THE CONTRACTOR. <br /> Q15. What is the deflection criteria for the micropiles? <br /> RESPONSE: SEE SPECIFICATION 31 61 00.3.03 F AND L FOR <br /> ACCEPTANCE CRITERIA. <br /> Q16. The geotechnical report that was provided doesn't provide micropile design <br /> information, however it seems like they must be involved because the <br /> structural drawings provide some specific geotechnical design criteria for the <br /> micropiles. Has Terracon has issued supplementary info regarding the pile <br /> design criteria, including verifying the pile design requirements such as skin <br /> friction, minimum cased length if required, minimum embedment depth, <br /> downdrag if required, testing requirements if varied from what in the spec, and <br /> any other relevant information? The spec seems to state there is <br /> supplemental pile information available. <br /> RESPONSE:A SUPPLEMENTAL GEOTECHNICAL REPORT PERTAINING <br /> TO THE MICROPILE DESIGN HAS BEEN PROVIDED AS PART OF <br /> ADDENDUM 3. <br /> Q17. The drawings list the required pile capacity in ultimate values (276 kips) that I <br /> assume already has an unknown factor of safety applied, but we need to know <br /> the required allowable capacity so we can apply the appropriate factor of <br /> safety. Pile designs should be provided in allowable values so a 2.0 factor of <br /> safety can be applied to the geotechnical design criteria per the spec. <br /> RESPONSE: LOADING AND SKIN FRICTION ARE BOTH PRESENTED AS <br /> ULTIMATE NUMBERS SO AN ADDITIONAL FACTOR OF SAFETY HAS <br /> ALREADY BEEN INCORPORATED. <br /> 1 <br /> Addendum 3 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 15/17 <br /> rCITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.