My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> EVERETT PUBLIC WORKS <br /> UP3747 — EVERGREEN PUMP STATION MODIFICATIONS <br /> Pre-bid Walkthrough <br /> Agenda <br /> 1 :00 p.m. 01/20/2022 <br /> 1. Greetings <br /> a. Contractor Sign In <br /> b. Introductions <br /> 2. City Team Members <br /> a. Project Manager— Randy Loveless (rloveless(a�everettwa.gov) <br /> b. Senior Project Manager— John Nottingham <br /> c. COE Operations Staff— Water: Mark Doucette, Shan Anderson, Jeff <br /> Jesmer. Electrical: Ken Christiansen <br /> d. Design Consultant Project Manager— John Gillespie, BHC <br /> Electrical Engineer— Jeff Gibson, BHC <br /> Structural Engineer— Ken Dahl, BHC <br /> Mechanical Engineer— Ellisa Lim, FSI <br /> I 3. Project Overview <br /> a. Scope <br /> i. Construction of new electrical building <br /> ii. Installation of new electrical and control equipment for Evergreen <br /> Pump Station operation. <br /> iii. Rerouting of existing 36-inch dia Reservoir drain pipe around <br /> building site (including new manholes). <br /> iv. Construction of smaller-diameter drain piping shown on plans <br /> v. Rerouting of existing leak detection pipe (exact location unknown) <br /> vi. Installation of new permanent power service. <br /> vii. Installation of temporary power service to existing pump station <br /> building. <br /> viii. Construction of seismic improvements at existing pump station <br /> building (shear walls, foundations, micropiles). <br /> ix. Construction of some HVAC and electrical modifications at existing <br /> pump station building. <br /> x. Site grading, block retaining walls, HMA paving <br /> xi. Installation of a flow meter, with associated new manhole and <br /> controls. <br /> xii. Selected Demolition associated with modifications to the existing <br /> pump station building. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.