Laserfiche WebLink
I <br /> I <br /> EVERETT PUBLIC WORKS <br /> UP3747 — EVERGREEN PUMP STATION MODIFICATIONS <br /> Pre-bid Walkthrough <br /> Agenda <br /> 1 :00 p.m. 01/20/2022 <br /> 1. Greetings <br /> a. Contractor Sign In <br /> b. Introductions <br /> 2. City Team Members <br /> a. Project Manager— Randy Loveless (rloveless(a�everettwa.gov) <br /> b. Senior Project Manager— John Nottingham <br /> c. COE Operations Staff— Water: Mark Doucette, Shan Anderson, Jeff <br /> Jesmer. Electrical: Ken Christiansen <br /> d. Design Consultant Project Manager— John Gillespie, BHC <br /> Electrical Engineer— Jeff Gibson, BHC <br /> Structural Engineer— Ken Dahl, BHC <br /> Mechanical Engineer— Ellisa Lim, FSI <br /> I 3. Project Overview <br /> a. Scope <br /> i. Construction of new electrical building <br /> ii. Installation of new electrical and control equipment for Evergreen <br /> Pump Station operation. <br /> iii. Rerouting of existing 36-inch dia Reservoir drain pipe around <br /> building site (including new manholes). <br /> iv. Construction of smaller-diameter drain piping shown on plans <br /> v. Rerouting of existing leak detection pipe (exact location unknown) <br /> vi. Installation of new permanent power service. <br /> vii. Installation of temporary power service to existing pump station <br /> building. <br /> viii. Construction of seismic improvements at existing pump station <br /> building (shear walls, foundations, micropiles). <br /> ix. Construction of some HVAC and electrical modifications at existing <br /> pump station building. <br /> x. Site grading, block retaining walls, HMA paving <br /> xi. Installation of a flow meter, with associated new manhole and <br /> controls. <br /> xii. Selected Demolition associated with modifications to the existing <br /> pump station building. <br /> I <br /> I <br />