Laserfiche WebLink
I <br /> Geotechnical Engineering Report Addendum 1 <br /> Micropile Foundations—Evergreen Way Pump Station® Everett,Washington lierracon <br /> August 2, 2021 Terracon Project No. 81195189 <br /> The installation of each micropile should be continuously observed by a Terracon representative. Load <br /> testing should be continuously monitored by a Terracon representative as well. <br /> We appreciate the opportunity to be of service to you on this project. If you have any questions concerning <br /> the recommendations contained in this letter, or if we may be of further service, please contact us. <br /> Sincerely, <br /> Terracon Consultants, Inc. <br /> Es <br /> 41 oc%vas4 , <br /> 0 iv <br /> Fri <br /> r,3. •y <br /> Frrs{rF�� %„ss, �' /e..„9,/ft <br /> E:c:2C21 <br /> Tori Hesedahl, P.E. Dennis R. Stettler, P.E. <br /> Senior Engineer Senior Engineering Consultant <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> Responsive• Resourceful • Reliable 4 <br /> I <br />