My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> Drawing E6 is REPLACED in its entirety with the attached revised drawing. <br /> Drawing revisions have been clouded. I <br /> Item 4 - DRAWING Ell, CONDUIT, TRANSFORMER AND MOTOR SCHEDULES, <br /> SHEET 50 OF 59. <br /> Drawing El 1 is REPLACED in its entirety with the attached revised drawing. <br /> Drawing revisions have been clouded. <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Item 5 - SPECIFICATION 00 41 13, BID FORM. I <br /> 00 41 13 BID FORM is REPLACED in its entirety with the attached. <br /> The bid form was updated to reflect the deletion of Bid Item 19, PVC Pipe, SDR <br /> 26, Solid Wall, 36-Inch Diam. and Bid Item 37, SnoPUD Charges. The City will <br /> pay SnoPUD charges directly. I <br /> Also, Bid Item 20, DI Pipe, Class 52, 36-Inch Diam., quantity was revised from 55 <br /> LF to 85 LF. <br /> Item 6 - SPECIFICATION 01 22 20, MEASUREMENT AND PAYMENT, Page 8, <br /> Section 1.11.D <br /> Bid Item 19 in Section 01 22 20 1.11.D is DELETED in its entirety. <br /> Bid Item 37 in Section 01 22 20 1.11.D is DELETED in its entirety. I <br /> 01 22 20, MEASUREMENT AND PAYMENT, is REPLACED in its entirety <br /> with the attached. 1 <br /> Item 7 - SPECIFICATION 26 13 00, MEDIUM-VOLTAGE SWITCHGEAR, Page 4, <br /> Section 2.02 1 <br /> Section 26 13 00 2.02 is REVISED to include the following: <br /> 2.02.E 8. Shunt Trip Operators: Provide stored-energy shunt trip operators <br /> for switches feeding adjustable speed drives in Switchgear A and Switchgear <br /> B as shown on drawings. Shunt trip operation shall open the switches within <br /> 100ms upon activation by external control signal. <br /> Item 8 - SPECIFICATION 33 05 01, PIPE AND FITTINGS, Page 1, Section 2.01 1 <br /> Section 33 05 01 2.01 A 3 is DELETED in its entirety. <br /> r <br /> Addendum 4 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 2/4 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.