My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> THE EARL Y2000"S TO HELP WITH SEISMIC RESTRAINT. BIDDERS ARE <br /> RESPONSIBLE FOR ASSESSING THE CAPACITY OF THE WALLS FOR <br /> HYDRAULIC LOADING SUPPORT. A RECORD DRAWING SHOWING THE <br /> APPARENT CMU WALL CONSTRUCTION AND REINFORCING IS <br /> PROVIDED AS AN ATTACHMENT TO ADDENDUM 4. RECORD DRAWINGS <br /> FOR THE STRONGBACKS ARE NOT AVAILABLE ALSO, ANCHORS <br /> CANNOT BE ATTACHED TO THE EXISTING CMU WALLS. <br /> Q6. What are the surface preparation requirements of the existing concrete columns <br /> and beams for accepting the new shear wall concrete, i.e. paint removal, <br /> scarification, etc.? If the existing paint is to be removed, please confirm that it <br /> does not contain lead. Also, the new shear walls are shown to go full height to 1 <br /> the concrete beams/roofline, are the existing windows to be removed and filled <br /> in with concrete where present? <br /> RESPONSE: EXISTING SURFACES COATINGS WILL NOT NEED TO BE111 <br /> REMOVED. SURFACES WILL NOT NEED TO BE ROUGHED PRIOR TO <br /> CONCRETE PLACEMENT. ALSO, THE WINDOWS WILL REMAIN IN PLACE. <br /> WE RECOMMEND THAT A LOST FORM BE USED TO PROTECT THE I <br /> WINDOWS. <br /> Q7. Yaskawa called with concerns about the Square D fused switchgear upstream I <br /> from their drives. They want the ability to trip the Square D switch remotely from <br /> the drive under certain conditions. Motor operated switches are included to do <br /> that, but don't show the control wiring between the drives and the <br /> switchgear. They were also concerned that the switch won't open fast <br /> enough. Yaskawa said " 2-3 cycles would be ideal." Square D responded that <br /> the switches open within 100ms maximum (that is 6 cycles at 60 Hz). Yaskawa <br /> responded that they would make that work. <br /> RESPONSE: CONTROL WIRING BETWEEN THE DRIVES AND <br /> SWITCHGEAR HAVE BEEN ADDED. SEE ATTACHED DRAWINGS E3, E6, <br /> AND Ell. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Addendum 4 to Evergreen Pump Station Modifications(WO#UP3747-3) Page 4/4 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax (425) 257-8882 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.