My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure & Sons Inc. 4/18/2022
>
Contracts
>
Capital Contract
>
McClure & Sons Inc. 4/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:17:31 AM
Creation date
4/22/2022 10:59:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons Inc.
Approval Date
4/18/2022
Council Approval Date
3/30/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Evergreen Pump Station Modifications
Public Works WO Number
UP3747
Tracking Number
0003303
Total Compensation
$4,863,152.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure & Sons Inc. 7/5/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure & Sons Inc. 7/5/2022 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons, Inc. 11/21/2024 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 22 20 MEASUREMENT AND PAYMENT <br /> 5. Providing field office trailer(s)for the Contractor and the Engineer, ' <br /> complete with all specified furnishings and utility services including <br /> telephones, telephone appurtenances, and copying machine. <br /> 6. Providing all on-site communication facilities, including telephones, and <br /> radio pagers. <br /> 7. Providing on-site sanitary facilities and potable water facilities. I <br /> 8. Arranging for and erection of Contractor's work and storage yard. <br /> 9. Constructing and implementing security features and requirements. I <br /> 10. Obtaining all required permits not obtained by the Owner. <br /> 11. Having all OSHA and WISHA required notices and establishment of <br /> safety programs. <br /> 12. Having the Contractor's superintendent at the job site full time. <br /> 13. Submitting submittals and material cut sheets and obtaining approvals. , <br /> 14. Providing Preconstruction Photographs <br /> 15. Project Closeout Items: The Contractor, prior to requesting final payment, 111 <br /> shall obtain and submit the following items to the Engineer for transmittal <br /> to the Owner: <br /> a. Written guarantees, where required. I <br /> b. Technical Manuals and instructions, including O&M Manuals. <br /> c. Maintenance stock items; spare parts; special tools. , <br /> d. Completed record drawings. <br /> e. Certificates of inspection and acceptance by local governing <br /> agencies having jurisdiction. <br /> f. Releases from all parties who are entitled to claims against the <br /> subject project, property, or improvement pursuant to the , <br /> provisions of law. <br /> 1.11 BID ITEM MEASUREMENT AND PAYMENT DESCRIPTIONS I <br /> A. It is the intent of these Contract Documents that the performance of all work <br /> under the Bid Items will result in the complete construction of the Contract. <br /> Payment will be made only for items listed in the Bid Form in the Proposal. All <br /> other material, labor or equipment required for the work shall be considered as <br /> incidental to the construction. <br /> B. The Contractor shall submit a breakdown of costs and a schedule of values for <br /> each lump sum Bid Item. The breakdown shall list the items included in the lump <br /> sum, together with a unit price for each item. The summation of the detailed unit <br /> prices for each item shall add up to the lump sum bid. The unit price values may <br /> be used as a guideline for determining partial payments or deductions for <br /> additional requested work changes. ' <br /> Cityof Everett 01 22 20-4 January2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.