Section 01 22 20 MEASUREMENT AND PAYMENT <br /> C. The following construction activities and costs shall be considered incidental to <br /> the Bid Items of the contract and no separate measurement and payment will be <br /> made: <br /> 1. Loading, hauling, and properly disposing offsite of demolition, excavation, <br /> grading, and other discarded materials unless otherwise noted, <br /> 2. Offsite disposal fees and disposal records, unless otherwise noted, <br /> 3. Dewatering trenches and excavations (including, but not limited to, <br /> ' pumping equipment, generators, tanks, filters, discharge permits, and if <br /> required, water quality treatment and removal of sediment), <br /> ' 4. Saw cutting asphalt pavements, pipes, concrete, and structures, <br /> 5. Locating existing buried utilities to determine precise location and depth, <br /> including potholing, <br /> 6. Protecting existing utilities and power poles from damage or disturbance, <br /> including holding power poles and/or paying utility purveyor to hold power <br /> poles, <br /> 7. Repair or replacement of utilities damaged by construction activities <br /> and/or financial reimbursement to affected utility purveyor, <br /> 8. Furnishing, installing, maintaining, moving, and removing temporary steel <br /> trench plating, <br /> 9. Furnishing, placing, maintaining, and removing cold mix asphalt, <br /> 10. Dust control, <br /> 11. Stockpiling and covering suitable native material for uses described in the <br /> specifications and/or plans. <br /> 12. Soil compaction testing and furnishing test reports, <br /> 13. Moisture conditioning native soils for reuse on site, at optimum moisture <br /> content for compaction, <br /> 14. Watering soils, plants, vegetation, hydroseed, <br /> 15. Trimming and cleanup, <br /> 16. Costs for compliance with permit conditions set forth in approved permits, <br /> 17. Furnishing submittals and manufacturer's certificates of compliance, <br /> 18. Coordination and notifications with City staff and its agents, Engineer, <br /> governing agencies, property owners, and all other persons and entities <br /> participating in, or affected by, construction activities, <br /> 19. Maintaining continual vehicular access to driveways, <br /> 20. Furnishing, installing, inspecting, repairing, moving & removing temporary <br /> fencing and barricades for security and public safety, <br /> 21. Any additional labor, materials, equipment and incidentals not specifically <br /> covered under a separate bid item. <br /> I <br /> City of Everett 01 22 20-5 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br />