Laserfiche WebLink
SCOPE OF WORK(continued) <br /> • Initial review will be by the City,with subsequent reviews by the Support Team and Executive Team. <br /> • The report and appendices will be provided to the City in electronic format(Word and PDF)only. <br /> Deliverables <br /> • City review draft of US 2/1-5 Interchange Planning Study Final Report <br /> • Support Team review draft of US 2/1-5 Interchange Planning Study Final Report <br /> • Executive Team review draft of US 2/1-5 Interchange Planning Study Final Report <br /> • Final US 2/I-S Interchange Planning Study Final Report <br /> 5541844828 <br /> City of Everett July 2021 <br /> US 2/1-5 Interchange Planning Study 31 <br />