My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix Inc. 3/24/2022
>
Contracts
>
6 Years Then Destroy
>
2025
>
Parametrix Inc. 3/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 3:05:26 PM
Creation date
4/22/2022 3:02:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix Inc.
Approval Date
3/24/2022
Council Approval Date
3/23/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
I-5 & US-2 Interchange Justification Report
Tracking Number
0003312
Total Compensation
$2,047,633.10
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK(continued) <br /> The Consultant will provide a draft set of prioritized phases that includes description of phase, benefits, issues, <br /> planning level cost range,effect on other projects,and possible funding sources. One review/comment/revision <br /> period will be completed with the Client prior to sharing the implementation plan with the Support Team. <br /> The Consultant will collect Support Team comments and suggestions and will provide draft responses for Client <br /> approval. Upon approval or edit of the comment responses,the Consultant will finalize the Implementation Plan. <br /> Assumptions <br /> • Up to ten phased projects will be developed for the preferred alternative. <br /> • Support Team comments will be discussed with the Client at a one-hour meeting that will include up to <br /> three Consultant members. <br /> • The Implementation Plan will include a set of one to two pages that describe each individual phase. This <br /> will not be a standalone report or technical memorandum. <br /> • The Implementation Plan will be included in the overall report appendix, <br /> Deliverables <br /> • Draft Implementation Plan <br /> • Final Implementation Plan <br /> TASK 7— DOCUMENTATION <br /> Approach <br /> The Consultant will prepare a final report that summarizes the findings of the study in a format that will be <br /> forward-compatible with ARR and PEL documentation to be completed by WSDOT.The technical memoranda and <br /> other deliverables identified in previous tasks in this scope of work will be included as appendices to support the <br /> final report.Components of the report will be based on FHWA's PEL Questionnaire and the WSDOT Highway <br /> Design Manual Access Revision Report requirements(Chapter 550.06(2)),and will include: <br /> • Study Background <br /> • Study Methodology <br /> • Agency Coordination <br /> • Public Coordination <br /> • Project Purpose and Need <br /> • Planning Assumptions and Analytical Methods <br /> • Range of Alternatives and Alternatives Evaluation <br /> • Environmental Resources Reviewed <br /> • Mitigation Strategies <br /> • Other Issues <br /> Assumptions <br /> • Each section of the report will consist of a summary of analyses done under other tasks. No new analysis <br /> will be required to complete the report. <br /> • Graphics for the report will be adapted from those completed under other tasks; no new graphics or <br /> mapping will be developed. <br /> 5541844828 <br /> City of Everett July 2021 <br /> US 2/I-5 Interchange Planning Study 30 <br />