Laserfiche WebLink
Exhibit E <br /> Subconsultant Cost Computations <br /> Perteet <br /> Project: US 2/I-5 Interchange Planning Study <br /> Direct Salary Cost(DSC): <br /> Classification Man Hours = Rate = Cost <br /> Vice President/Principal 244 X $97.19 $23,714.36 <br /> Vice President 90 $93.00 $8,370.00 <br /> Lead Designer/Project Manager 305 X $49.50 $15,097.50 <br /> Engineer III 352 X $38.00 $13,376.00 <br /> Utility Design 116 X $43.00 $4,988.00 <br /> Accountant 22 X $35.50 $781.00 <br /> X $0.00 <br /> X $0.00 <br /> X $0.00 <br /> X $0.00 <br /> X $0.00 <br /> X $0.00 <br /> X $0.00 <br /> X $0.00 <br /> X $0.00 <br /> Total Hours 1129 Total DSC = $66,326.86 <br /> Overhead (OH Cost--including Salary Additives): <br /> OH Rate x DSC of 1.96 %x$ $66,326.86 $130,319.01 <br /> Fixed Fee(FF): <br /> FF Rate x DSC of 28 %x$ $66,326.86 $18,571.52 <br /> Reimbursables: <br /> Subconsultants: <br /> Grand Total $215,217.40 <br /> Date: 2/16/2022 <br /> Agreement Number: <br /> Page 1 of 1 <br />