Laserfiche WebLink
to Fifteenth Street; thence Fifteenth Street to the first <br /> alley east of Rucker Avenue and be connected there to a <br /> trunk sewer installed as a part of this project. <br /> (9) Pumping station No. 9 shall be constructed in <br /> Hayes Street two hundred (200) feet more or less east of <br /> East Grand Avenue and discharge through a four (4) inch <br /> diameter force main to be installed in and along Hayes <br /> Street to East Grand Avenue and be connected there to a <br /> trunk sewer installed as a part of this project. <br /> (10) Pumping station No. 10 shall be constructed in <br /> California Avenue at the first alley west of Harrison Street <br /> and shall discharge through a ten (10) inch force main to <br /> be installed in and along California Avenue to Summit <br /> Avenue; thence in and along Summit Avenue to Everett <br /> Avenue and connect there to a trunk sewer installed as a <br /> part of this project. <br /> (11) Pumping station No. 11 shall be constructed in <br /> Pacific Avenue at its easterly terminus and discharge <br /> through a ten (10) inch diameter force main to be installed <br /> in and along Pacific Avenue to Maple Street and be connected <br /> there to a trunk sewer installed as a part of this project. <br /> (12) Pumping station No. 12 shall be constructed in <br /> Pine Street at a point five hundred (500) feet more or less <br /> south of Thirty-third Street and discharge through a four <br /> (4) inch force main to be installed in and along Pine Street <br /> to Thirty-third Street and connect there to a trunk sewer <br /> installed as a part of this project. <br /> The aforedescribed additions, improvements and extensions <br /> to the system of sewerage of the city shall be connected one <br /> to the other and to the existing system so as to make a <br /> complete utility and such additions, improvements and extensions <br /> -9- <br />