Laserfiche WebLink
(4) Pumping station No. 4 shall be constructed in the <br /> intersection of Everett Avenue with Grand Avenue and shall <br /> discharge through a sixteen (16) inch diameter force main <br /> to be installed in and along Everett Avenue and connected <br /> to a trunk sewer in Hoyt Avenue constructed as a part of this <br /> project. <br /> (5) Pumping station No. 5 shall be constructed at the <br /> intersection of Norton Avenue with Twenty-fifth Street and <br /> shall discharge through a four (4) inch diameter force main <br /> to be installed in and along Twenty-fifth Street to Hoyt <br /> Avenue and connected there to a trunk sewer constructed as <br /> a part of this project. <br /> (6) Pumping station No. 6 shall be constructed at a <br /> point in Norton Avenue two hundred (200) feet north of the <br /> center line of Nineteenth Street and discharge at the same <br /> point to trunk sewer installed there as a part of this <br /> project. <br /> (7) Pumping station No. 7 shall be constructed at the <br /> intersection of Fourteenth Street and Norton Avenue and <br /> shall discharge through a ten (10) inch diameter force main <br /> to be installed in and along Fourteenth Street to Grand <br /> Avenue; thence in and along Grand Avenue to Fifteenth Street; <br /> thence in and along Fifteenth Street to the first alley <br /> east of Rucker Avenue and connect there to a trunk sewer <br /> installed as a part of this project. <br /> (8) Pumping station No. 8 shall be constructed in <br /> Fourteenth Street at a point one hundred (100) feet west of <br /> Grand Avenue and shall discharge through a six* (6) inch <br /> diameter force main to be installed in and along Fourteenth <br /> Street to Grand Avenue; thence in and along Grand Avenue <br /> -8- <br />