Laserfiche WebLink
• <br /> • <br /> 4 <br /> ft • .r f • <br /> WHEREAS, the City- has heretofore called for bids for the <br /> acquisition of part of the pipe necessary to carry out said plan <br /> al d also has accepted the best bicl submitted to furnish said pipe <br /> and awarded a contract therefor to such bidder; <br /> NOW, T ?REFORE, THE CITY DP EVERET T DOES ORDJ.i : <br /> Section 1: The following plan of additions a": d im_prove- <br /> meni.s to and extensions of the water supply and distribution system <br /> of the City is hereby specified and adopted, to wit: <br /> The City shall acquire, construct and install a 52" <br /> and L 8" in diameter transmission pipeline from the exist- <br /> ing reservoir of the City at Lake Ohaplain to connect with <br /> one or more of the four existing reservoirs of the City' s <br /> water system within the City. Such transmission pipeline <br /> shall have a capacity of 50,000,000 gallons per day , and shall <br /> be installed pars) lel to the existing No. 2 and No. 3 trans- <br /> mission lines running from said reservoir to the City. <br /> The City shall acquire all materials and equipment, <br /> real and personal nropertyi, easements, fraAnc~iises, rights- <br /> of-ways and water rights necessary to carry out the above <br /> described plan, which is all as more specifically described <br /> and set forth in maps and plans prepared by John W. Cunning- <br /> ham & Associates, consulting engineers , Portland, Oregon. <br /> Section 2: The estimated cost of acquiring, constructing <br /> and instal .li.r.dr such additions and improvements to and extensions <br /> of the water supply and distribution system of the City is hereby <br /> declared to be, as near as may be, the sum of 3,850,000, which <br /> cost shall be provided from the sale of water reventr, bord:2 of <br /> City�.:yty In a like pri i"iG i.pct.l amount . <br />