Laserfiche WebLink
RECEOVED <br /> FEB 0 2021 <br /> Response: Roof over this deck will be demolished. CITY OF EVERETT <br /> 8. Plan 1/Sheet 3 shows a new exterior entry door. The following comPmen sl shouuid erv1 <br /> ces <br /> be addressed: <br /> a. The proposed framing for the door appears incomplete and does not <br /> appear structurally adequate to support the Second Floor floor and walls, <br /> and roof, above. Structural calculations should be provided, or the <br /> construction should be shown to comply with the prescriptive requirements <br /> of the IRC. Increase the header size as needed. Provided jamb and king <br /> studs. <br /> Response: (2)2x12 header will be installed for the door framing. Door <br /> jamb and king studs are now shown on the door framing detail. <br /> b. Modification to the concrete foundation wall is expected, or steps may be <br /> required. If steps are required, the head clearly may be an issue. <br /> Response: A single step will be added and the head is not an issue. <br /> c. The header height is specified as 6'-8". This does not provide additional <br /> clearance for the top door jamb. <br /> Response: Top door jamb is indicated on the updated section view. <br /> d. An exterior landing is required. <br /> Response: 36"x48" landing at the door has been added. <br /> 9. Material requirements (e.g., wood grades, etc.) are missing. <br /> Response: Material requirements added on notes shown on sheet 4 of 4. <br /> 10. Fastener requirements (e.g., framing nailing, etc.) are missing. Note that <br /> references to code tables are not sufficient. <br /> Response: Fastener requirements added on notes shown on sheet 4 of 4. <br /> 1. Bedroom windows should state minimum emergency egress requirements. <br /> Response: New bedroom windows have a call out for 5.7minimum opening for <br /> egress. Refer to sheet 3 of 4. <br /> 12. The laundry room requires an exhaust fan. <br /> Response: Laundry room exhaust fan has been included. <br />