Serial Letter Response No. 1 <br /> 12 <br /> E V E R E T T March 22, 2022 <br /> WASHINGTON <br /> Mr. Nick Agostino <br /> Northwest Construction, Inc. <br /> 2353 130th Ave NE, Suite 100 <br /> Bellevue, WA 98005 <br /> RE: Port of Everett Combined Sewer Main Improvements <br /> Work Order#UP-3768 <br /> RE: Serial Letter No. 05: 12"PVC Pipe Restraints, Serial <br /> Letter No. 06: Geogrid in Gravel Pad Area, Serial Letter <br /> No. o7: Potentially Contaminated Water. <br /> Dear Mr. Agostino, <br /> We have received the three (3) cost proposal Serial Letters listed above <br /> and we have the following response. The City of Everett accepts the cost <br /> proposals for the 12"Pipe Restraints and for the Geogrid in Gravel Pad <br /> area, but we do not accept the cost proposal as written in Serial Letter <br /> No. 07 to pay for all costs associated with potentially contaminated water. <br /> We agree that the bid item#25 for Trench Dewatering does not include <br /> treatment for contaminated water, but the bid item does include costs for <br /> implementation of the plan and as such are only agreeing to pay for a <br /> portion of your cost proposal in Serial Letter No. 07, totaling $32,050.00 <br /> (attached). We also agree to the T&M (FA) costs as stated in your quote. <br /> Please let us know if these costs are agreeable to you and a change order <br /> will be written to pay for these costs. <br /> Sincerely, <br /> ieed <br /> Public Works <br /> Keith Alewine <br /> Q3200 Cedar Street COE Construction Manager <br /> Everett,WA 98201 <br /> O425-257-8800 <br /> 425-257-8882 Fax <br /> ;„ everettpw@everettwa.gov <br /> • <br /> °� everettwa.gov/pw <br /> Cc: Souheil Nasr, PE-COE Project Manager, Mike Nguyen-COE Project <br /> Inspector <br />