Laserfiche WebLink
NORTHWEST CONSTRUCTION INC. <br /> EXTRA WORK ORDER <br /> CUSTOMER: City of Everett WORK ORDER: <br /> ADDRESS: 3200 Cedar Street OUR JOB NO. 823 <br /> Everett,WA 98201 JOB NAME: POE Combined Sewer Main Improvements <br /> WORK ORDERED BY: DATE: DAY Saturday <br /> DESCRIPTION OF WORK: <br /> Rental of Carbon Filter to treat potentailly contaminated water. Operator&Loader to unload and load equipment.- P`''`'„-.� on*0 1 t,..-p1 et�.eu/ ,4,r,. <br /> 6'F aster <br /> $ 45,897.04 <br /> LABOR SUMMARY EQUIPMENT SUMMARY <br /> HOURS DESCRIPTION HOURS RATE AMOUNT <br /> Name&Class ST OT ST RATE OT RATE AMOUNT Komatsu 320 Loader 4.0 $ 81.28 $ 325.12 <br /> Operator 4.0 $ 83.32 $ 112.07 $ 333.28 <br /> TOTAL NWC EQUIPMENT $ 325.12 <br /> SUBCONTRACTOR <br /> DESCRIPTION QUANTITY UNIT PRICE AMOUNT <br /> $ <br /> $ <br /> $ - <br /> TOTAL LABOR $ 333.28 $ - <br /> RENTALS/MATERIALS $ - <br /> DESCRIPTION QUANTITY UNIT PRICE AMOUNT $ - <br /> Carbon Filtration 2.00 $ 7,743.00 $ 15,486.00 $ - <br /> Materials for Plumbing Carbon Filter 2.00 $ 500.00 $ 1,000.00 TOTAL RENTAL EQUIPMENT $ - <br /> Installations&Decommission 1.00 $ 6,565.00 $ 6,565.00 NWC OFFICE USE ONLY:COST SUMMARY <br /> Mobilization of Materials&Equipment 1.00 $ 3,200.00 $ 3,200.00 <br /> Carbon Media-Sanitary Sewer 10,000.00 $ 1.10 $ 11,000.00 LABOR $ 333.28 <br /> OUTSIDE MATERIALS&OTHER $ 37,251.00 <br /> NWC EQUIPMENT USED $ 325.12 <br /> RENTAL/SUBCONTRACTOR $ - <br /> SUB-TOTAL $ 37,909.40 <br /> OH&P-LABOR 29.00% $ 96.65 <br /> OH&P-NWC EQUIPMENT 21.00% $ 68.28 <br /> OH&P-OUTSIDE RENTALS/MATERIALS 21.00% $ 7,822.71 <br /> OH&P-SUBCONTRACTOR 12.00% $ - <br /> SALES TAX 0.00% $ - <br /> TOTAL MATERIALS $ 37,251.00 TOTAL AMOUNT I $ 45,897.04 <br />