My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Corporation Inc 4/20/2022 Change Order 1
>
Contracts
>
Capital Contract
>
Northwest Corporation Inc 4/20/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 1:40:30 PM
Creation date
4/29/2022 1:39:53 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corporation Inc
Approval Date
4/20/2022
Department
Public Works
Department Project Manager
Souheil Nasr/Keith Alewine
Subject / Project Title
Combined Sewer Main Improvements
Public Works WO Number
UP3768
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003148
Total Compensation
$50,996.61
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 1/18/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: POE Combined Sewer Main Improvements <br /> Change Order No. <br /> Change Order Effective Date: 4/11/2022 <br /> Exhibit A—Description of Changed Work <br /> This Change Order No. 1 adds three (3) new items to the Contract, as described <br /> below. <br /> ADDED ITEMS <br /> New Item # 100 — Provide and Install 12-Inch PVC Sewer Main Pipe <br /> Restraints. Add new item # 100 entitled, "Provide and Install 12-Inch PVC Sewer <br /> Main Pipe Restraints" at the agreed to unit price of$320.00/Each, by adding 26 <br /> linear Pipe Restraints to the Contract, resulting in a $8,320.00 increase to the <br /> Contract price. <br /> New Item # 101 — Provide and Install Tensar TX7 Geogrid at Gravel Pad. <br /> Add new item # 101 entitled, "Provide and Install Tensar TX7 Geogrid at Gravel <br /> Pad" at the agreed to unit price of$4.50/Square Yard, by adding 1,350 Square <br /> Yards to the Contract, resulting in a $6,075.00 increase to the Contract price. <br /> New Item # 102 — Contaminated Water Treatment. Add new item # 102 <br /> entitled, "Contaminated Water Treatment" at the agreed to Lump Sum price of <br /> $32,050.00. Adding this new item results in a $32,050.00 increase to the Contract <br /> price. <br /> JUSTIFICATION <br /> New Item # 100 — Provide and Install 12-Inch PVC Sewer Main Pipe <br /> Restraints. The Design Engineer required pipe restraints be installed on the 12- <br /> Inch PVC Sewer Main Pipe but there is no measurement and payment section for <br /> pipe restraints, so this new item is being added to pay for the costs to acquire and <br /> install pipe restraints. <br />
The URL can be used to link to this page
Your browser does not support the video tag.