Laserfiche WebLink
Project: POE Combined Sewer Main Improvements <br /> Change Order No. <br /> Change Order Effective Date: 4/11/2022 <br /> Exhibit A—Description of Changed Work <br /> This Change Order No. 1 adds three (3) new items to the Contract, as described <br /> below. <br /> ADDED ITEMS <br /> New Item # 100 — Provide and Install 12-Inch PVC Sewer Main Pipe <br /> Restraints. Add new item # 100 entitled, "Provide and Install 12-Inch PVC Sewer <br /> Main Pipe Restraints" at the agreed to unit price of$320.00/Each, by adding 26 <br /> linear Pipe Restraints to the Contract, resulting in a $8,320.00 increase to the <br /> Contract price. <br /> New Item # 101 — Provide and Install Tensar TX7 Geogrid at Gravel Pad. <br /> Add new item # 101 entitled, "Provide and Install Tensar TX7 Geogrid at Gravel <br /> Pad" at the agreed to unit price of$4.50/Square Yard, by adding 1,350 Square <br /> Yards to the Contract, resulting in a $6,075.00 increase to the Contract price. <br /> New Item # 102 — Contaminated Water Treatment. Add new item # 102 <br /> entitled, "Contaminated Water Treatment" at the agreed to Lump Sum price of <br /> $32,050.00. Adding this new item results in a $32,050.00 increase to the Contract <br /> price. <br /> JUSTIFICATION <br /> New Item # 100 — Provide and Install 12-Inch PVC Sewer Main Pipe <br /> Restraints. The Design Engineer required pipe restraints be installed on the 12- <br /> Inch PVC Sewer Main Pipe but there is no measurement and payment section for <br /> pipe restraints, so this new item is being added to pay for the costs to acquire and <br /> install pipe restraints. <br />