My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Corporation Inc 4/20/2022 Change Order 1
>
Contracts
>
Capital Contract
>
Northwest Corporation Inc 4/20/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 1:40:30 PM
Creation date
4/29/2022 1:39:53 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corporation Inc
Approval Date
4/20/2022
Department
Public Works
Department Project Manager
Souheil Nasr/Keith Alewine
Subject / Project Title
Combined Sewer Main Improvements
Public Works WO Number
UP3768
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003148
Total Compensation
$50,996.61
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 1/18/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: POE Combined Sewer Main Improvements <br /> Change Order No. <br /> Change Order Effective Date: 4/11/2022 <br /> New Item # 101 — Provide and Install Tensar TX7 Geogrid at Gravel Pad. <br /> Nonwoven geotextile was incorrectly required at the Gravel Pad. The correct <br /> material is Tensar TX7, which provides more stability and strength. This item is <br /> being added to account for additional costs to install Tensar TX7 for the Gravel <br /> Pad. <br /> New Item # 102 — Contaminated Water Treatment. Treating contaminated <br /> water from the dewatering system is a Department of Ecology requirement, but the <br /> specifications did not include a payment mechanism. This new item is being <br /> added to account for costs to treat contaminated water. <br /> Change Order No. 1 Costs <br /> New Item 100: $ 8,320.00 <br /> New Item 101: 6,075.00 <br /> New Item 102: 32,050.00 <br /> Subtotal: $46,445.00 <br /> 9.9% Sales Tax: 4,598.06 <br /> Total Cost: $51,043.06 <br /> Contract Time <br /> There are no days added to the Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.