Laserfiche WebLink
Project: POE Combined Sewer Main Improvements <br /> Change Order No. <br /> Change Order Effective Date: 4/11/2022 <br /> New Item # 101 — Provide and Install Tensar TX7 Geogrid at Gravel Pad. <br /> Nonwoven geotextile was incorrectly required at the Gravel Pad. The correct <br /> material is Tensar TX7, which provides more stability and strength. This item is <br /> being added to account for additional costs to install Tensar TX7 for the Gravel <br /> Pad. <br /> New Item # 102 — Contaminated Water Treatment. Treating contaminated <br /> water from the dewatering system is a Department of Ecology requirement, but the <br /> specifications did not include a payment mechanism. This new item is being <br /> added to account for costs to treat contaminated water. <br /> Change Order No. 1 Costs <br /> New Item 100: $ 8,320.00 <br /> New Item 101: 6,075.00 <br /> New Item 102: 32,050.00 <br /> Subtotal: $46,445.00 <br /> 9.9% Sales Tax: 4,598.06 <br /> Total Cost: $51,043.06 <br /> Contract Time <br /> There are no days added to the Contract. <br />