Laserfiche WebLink
3/22/2022 City of Everett Page 3 <br /> 9:18:52AM <br /> INSPECTION ACTIVITY REPORT <br /> 1/25/2022 1/25/2022 BLDG KMK PARTIAL APPR per special insp see 1/24/2022 5:04 PM Kenneth Vogel <br /> 08-FRAMING notes Structural steel work above main door south <br /> side of building. Special inspector has <br /> verified proper installation <br /> Contact Name:Matt Leon <br /> Site Address: 1415 75TH ST SW <br /> Phone:2534806593 <br /> e-Mail:mleon@helionenergy.com <br /> (1/25/2022 7:57 AM KMK) <br /> Send special inspection reports and final <br /> letter to kkeck@everettwa.gov <br /> Please include permit#and address on <br /> email. <br /> 1/26/2022 1/26/2022 BLDG RFK APPROVAL See notes (1/26/2022 3:08 PM RFK) <br /> 08-FRAMING See attachment for special inspection letter <br /> for structural steel work above main door <br /> on south side of building. <br /> 2/14/2022 2/14/2022 09:31 FIRE 03-BLDG SAG APPROVAL (2/15/2022 11:05 AM SAG) <br /> FINAL FOR FIRE Final ok <br /> 2/15/2022 2/16/2022 TEMP KMK APPROVAL TCO 30 days 2/10/2022 5:51 PM Kenneth Vogel <br /> CERTIFICATE OF <br /> Contact Name:Matt Leon <br /> Site Address: 1415 75TH ST SW <br /> Phone:2534806593 <br /> e-Mail:mleon@helionenergy.com <br /> (2/11/2022 2:19 PM KMK) <br /> Site visit:met with contractor and walked <br /> site. <br /> Resheduled for Monday to coincide with <br /> fire final. <br /> (2/16/2022 8:38 AM KMK) <br /> TCO(Temporary Certificate of Occupancy) <br /> for 30 days. <br /> Obtain finals for electrical permits(Interior <br /> signs) <br /> E2201-179 and E2112-152 <br /> Reshedule a building final when ready <br /> 3/21/2022 3/21/2022 BLDG 16-FINAL KMK APPRVD-PERIv Matthew Leon 425-381-7890 <br /> 3/22/2022 3/22/2022 CERTIFICATE OF KLC APPROVAL Attached 3/16/2022 7:02 PM Kenneth Vogel <br /> OCCUPANCY <br /> Contact Name:Matt Leon <br /> Site Address:1415 75TH ST SW <br /> Phone:2534806593 <br /> e-Mail:mleon@helionenergy.com <br /> Re-scheduled to 3/22 to allow permit finals. <br /> INSP12 anorsYSTEMS <br />