My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1415 75TH ST SW HELION ENERGY 2022-04-29
>
Address Records
>
75TH ST SW
>
1415
>
HELION ENERGY
>
1415 75TH ST SW HELION ENERGY 2022-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 1:56:43 PM
Creation date
4/29/2022 1:56:06 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1415
Tenant Name
HELION ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/22/2022 City of Everett Page 2 I <br /> 9:18:52AM <br /> INSPECTION ACTIVITY REPORT <br /> 12/29/2021 12/29/2021 BLDG KMK OTHER discussed exit 12/28/2021 2:17 PM Kenneth Vogel <br /> 0l-CONSULTATIO signage Request consultation to review build egress <br /> signage locations. <br /> On site supervisor:Jim Baker <br /> (425)320-7626 <br /> On Site Construction Manager:Matt Leon <br /> (253)480-6593 <br /> Contact Name:Kenneth Vogel <br /> Site Address:1415 75TH ST SW <br /> Phone:8502385408 <br /> e-Mail:kvogel@msn.com <br /> (12/29/2021 12:09 PM KMK) <br /> Please consult further with the fire marshal <br /> regarding placement of signage and egress <br /> lighting. <br /> 1/4/2022 1/4/2022 FIRE 02-BLDG SAG OTHER see notes 12/31/2021 11:57 AM Kenneth Vogel <br /> PRE-FINAL FOR Request Consultation for Review of Egress <br /> Signage Locations. <br /> Site Super:Jim Baker (425)320-7626 <br /> Site Construction Manager:Matt Leon <br /> (253)480-6593 <br /> Contact Name:Jim Baker <br /> Site Address: 1415 75TH ST SW <br /> Phone:4253207626 <br /> e-Mail:kvogel@msn.com <br /> (1/4/2022 1:18 PM SAG) <br /> meeting to talk about exit signage.The <br /> corridor signs can be moved to the posts. <br /> But the directional corner signs at the end <br /> of the office portables need to stay on the <br /> corners so as not to lead someone into an <br /> office if there was no visibility due to <br /> smoke or"cold smoke"after a sprinkler <br /> discharge <br /> 1/7/2022 1/7/2022 BLDG KMK PARTIAL APPR eTRAKiT Inspection 1/6/2022 10:41 AM Kenneth Vogel <br /> 08-FRAMING Request requesting a framing inspection on the S.E. <br /> Exterior wall where the bay doors have <br /> been removed and the framing is complete <br /> Contact Name:Matt Leon <br /> Site Address: 13930 Wye Lake Blvd <br /> Phone:9253048065 <br /> e-Mail:mleon@helionenergy.com <br /> (1/7/2022 11:29 AM KMK) <br /> 1.South wall has been insulated and is OK <br /> to cover. <br /> 2.South east wall OK to insulate <br /> 1/11/2022 1/11/2022 BLDG KMK APPROVAL eTRAKiT Inspection 1/10/2022 5:59 PM Kenneth Vogel <br /> 12-INSULATION Request SE corner of building <br /> Contact Name:Matt Leon <br /> Site Address:1415 75TH ST SW <br /> Phone:253480659 <br /> e-Mail:kvogel@msn.com <br /> (1/11/2022 1:41 PM KMK) <br /> Re SE exterior wall. <br /> INSP12 <br /> CRIlfS`a` TE1'ajtS <br />
The URL can be used to link to this page
Your browser does not support the video tag.