My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7805 40TH AVE W 2022-05-12
>
Address Records
>
40TH AVE W
>
7805
>
7805 40TH AVE W 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:23:37 PM
Creation date
5/9/2022 8:08:50 AM
Metadata
Fields
Template:
Address Document
Street Name
40TH AVE W
Street Number
7805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�-� ISOLATOR ROW <br /> INSPECTION/MAINTENANCE <br /> INSPECTION <br /> l The frequency of inspection and maintenance varies by location.A <br /> routine inspection schedule needs to be established for each individual <br /> location based upon site specific variables.The type of land use(i.e. <br /> = , industrial,commercial, residential),anticipated pollutant load,percent <br /> imperviousness, climate,etc.all play a critical role in determining the <br /> actual frequency of inspection and maintenance practices. <br /> At a minimum,StormTech recommends annual inspections. Initially, <br /> the Isolator Row should be inspected every 6 months for the first year <br /> of operation. For subsequent years,the inspection should be adjusted <br /> based upon previous observation of sediment deposition. <br /> The Isolator Row incorporates a combination of standard manhole(s)and strategically located inspection ports <br /> (as needed).The inspection ports allow for easy access to the system from the surface,eliminating the need to <br /> perform a confined space entry for inspection purposes. <br /> If upon visual inspection it is found that sediment has accumulated,a stadia rod should be inserted to <br /> determine the depth of sediment.When the average depth of sediment exceeds 3 inches throughout the length <br /> of the Isolator Row,clean-out should be performed. <br /> MAINTENANCE <br /> The Isolator Row was designed to reduce the cost of periodic maintenance. By"isolating"sediments to just <br /> one row,costs are dramatically reduced by eliminating the need to clean out each row of the entire storage <br /> bed. If inspection indicates the potential need for maintenance,access is provided via a manhole(s)located on <br /> the end(s)of the row for cleanout. If entry into the manhole is required, please follow local and OSHA rules for a <br /> confined space entries. <br /> Maintenance is accomplished with the JetVac process.The JetVac process utilizes a high pressure water <br /> nozzle to propel itself down the Isolator Row while scouring and suspending sediments.As the nozzle is <br /> retrieved,the captured pollutants are flushed back into the manhole for vacuuming.Most sewer and pipe <br /> maintenance companies have vacuum/JetVac combination vehicles.Selection of an appropriate JetVac nozzle <br /> will improve maintenance efficiency. Fixed nozzles designed for culverts or large diameter pipe cleaning are <br /> preferable. Rear facing jets with an effective spread of at least 45"are best. Most JetVac reels have 400 feet <br /> of hose allowing maintenance of an Isolator Row up to 50 chambers long.The JetVac process shall only <br /> be performed on StormTech Isolator Rows that have AASHTO class 1 woven geotextile(as specified by <br /> StormTech)over their angular base stone. <br /> StormTech Isolator Row(not to scale) <br /> Note:Non-woven fabric is only required over the inlet pipe connection into the end cap for SC-160LP,DC-780,MC-3500 and MC-4500 chamber <br /> models and is not required over the entire Isolator Row. <br /> OPTIONAL INSPECTION PORT <br /> SC-TAO,SC-310:COVER ENTIRE ISOLATOR ROW WITH ADS uiiiiiii iuiiiii iii ////ZIZIA .i�11� .nef <br /> GEOSYNTHETICS BOIT NON-WOVEN GEOTEXT0.E �/:1:'.•-.::.u^,.::.: TIC: ""/,�,Y / /Illll� lll�r,,:•,/•••. 7••y <br /> SC-T3R d(2.A m)MIN WIDEi5^•�} lT,� .y(�f_`< <br /> SC310:5(1S m)MIN WIDE Jf f C i f. >' f� k <br /> MGd500,MC-35PT,OC-TIO.SG1BOlP:COVER PPE 1 f" {• 1 f. f\+ f�f I. i,,,�f�'S A •-, T� STORMTECH CHAMBER <br /> CO NECTIONTOENOCAPWRHAOS f _ lI <br /> GEOSYNTHETNS 601T NONWOVEN GEOTEDTLE -I <br /> �^ • - r STORMTECH ENO CAP <br /> ZTO ,i <br /> CATCH BASIN I L ., -I' I l 1 /1 I_ 1, <br /> I 1�I llrll' <br /> GR � (� I 1 1 <br /> '1- \ Y 1I]`11 I] IJ`11 `r1 1I, , 1 ]iI ]]I ]1 I7 <br /> J MANHO E IIiliI Il�li ' ; 4 ; 7!\I\�iI■�iti�il�� IILI��I ,1 <br /> SUMP DEPHTBD BY k �.sv-1i.3 f � C <br /> SITE DESIGN ENGINEER <br /> (21'(800 Al,,]NN RECOMMENDED) TWO LAYERS OF ADS GEC/SYNTHETICS 315WT WOVEN GEOTEXTBE BETWEEN <br /> FOUNDATION STONE AND CHAMBERS,CONTINUOUS FABRIC WITHOUT SEAMS <br /> 24.(600 mm)HDPE ACCESS PIPE REQUNED:MO-500.MC-3500.SC-TRO.DD-TB0 la 3'(11 m)AIN WIDE.MC-I500 <br /> 12'(300 mm)HOPE ACCESS PPE REQUIRED:SC310 8.25(25 m)MN WIDE Mc-moo <br /> B'(200 mm)HOPE ACCESS PIPE REQUIRED:SC.160LP 5(1.5 m)MIN WIDE DC-TBO.SC-M0 <br /> 4'(1.2 m)NIN WIDE SC-310,SC-160LP ... _... <br /> ". +lFla.4c <br /> ..1 �� to <br />
The URL can be used to link to this page
Your browser does not support the video tag.