My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7805 40TH AVE W 2022-05-12
>
Address Records
>
40TH AVE W
>
7805
>
7805 40TH AVE W 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:23:37 PM
Creation date
5/9/2022 8:08:50 AM
Metadata
Fields
Template:
Address Document
Street Name
40TH AVE W
Street Number
7805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR#7 FLOW CONTROL: A Stormtech system SC-740 of capacity 5,504 CF will be <br /> located underneath the parking area near the northeast portion of the site is proposed to <br /> meet the flow control requirements conforming to the City of Everett requirements. The <br /> Stormtech system was sized using Western Washington Hydrology Model V 4.2.14 <br /> (WWHM). The roof and the yard drains will be connected to the onsite detention system. <br /> The outflow from the detention pipe will be discharged to the east. Runoff treatment would <br /> be obtained by an underground Biopod Biofilter manufactured by Oldcastle Infrastructure <br /> located downstream of detention <br /> MR#8 WETLANDS PROTECTION: Flow control and water quality are proposed and <br /> the runoff will be directed away from the steep slopes of the critical areas. <br /> MR#9 OPERATIONS AND MAINTENANCE: An Operation and Maintenance <br /> Manual is provided under Section VIII. <br /> Insight Engineering Co. -Stormwater Site Plan 11/27/18 <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.