Laserfiche WebLink
MR#7 FLOW CONTROL: A Stormtech system SC-740 of capacity 5,504 CF will be <br /> located underneath the parking area near the northeast portion of the site is proposed to <br /> meet the flow control requirements conforming to the City of Everett requirements. The <br /> Stormtech system was sized using Western Washington Hydrology Model V 4.2.14 <br /> (WWHM). The roof and the yard drains will be connected to the onsite detention system. <br /> The outflow from the detention pipe will be discharged to the east. Runoff treatment would <br /> be obtained by an underground Biopod Biofilter manufactured by Oldcastle Infrastructure <br /> located downstream of detention <br /> MR#8 WETLANDS PROTECTION: Flow control and water quality are proposed and <br /> the runoff will be directed away from the steep slopes of the critical areas. <br /> MR#9 OPERATIONS AND MAINTENANCE: An Operation and Maintenance <br /> Manual is provided under Section VIII. <br /> Insight Engineering Co. -Stormwater Site Plan 11/27/18 <br /> -6- <br />