Laserfiche WebLink
Construction Stormwater General Permit <br /> Stormwater Pollution Prevention Plan (SWPPP) <br /> for <br /> Georgiu Commercial <br /> Prepared for: <br /> The Washington State Department of Ecology <br /> Northwest Regional Office <br /> 3190—160th Avenue SE <br /> Bellevue,WA 98008 <br /> Permittee/Owner Developer Operator/Contractor <br /> George &Eugenia Georgiu To be determined <br /> 5810 86th P1 SW <br /> Mukiteo,WA 98275 <br /> Project Site Location <br /> 7805 40th Ave W, <br /> Mukilteo,WA 98275 <br /> Certified Erosion and Sediment Control Lead(CESCL) <br /> Name Organization Contact Phone Number <br /> Brian R. Kalab,P. E. Insight Engineering 425-303-9363 <br /> SWPPP Prepared By <br /> Name Organization Contact Phone Number <br /> Jacob D. Mealey,P. E. Insight Engineering 425-303-9363 <br /> SWPPP Preparation Date <br /> July 9,2018 <br /> Project Construction Dates <br /> Activity/Phase Start Date End Date <br /> Construction Duration March 1, 2019 March 1, 2020 <br /> Page 11 <br />