Laserfiche WebLink
Table of Contents <br /> 1 Project Information 5 <br /> 1.1 Existing Conditions 5 <br /> 1.2 Proposed Construction Activities 5 <br /> 2 Construction Stormwater Best Management Practices(BMPs) 7 <br /> 2.1 The 13 Elements 7 <br /> 2.1.1 Element 1: Preserve Vegetation/Mark Clearing Limits 7 <br /> 2.1.2 Element 2: Establish Construction Access 8 <br /> 2.1.3 Element 3: Control Flow Rates 9 <br /> 2.1.4 Element 4: Install Sediment Controls 10 <br /> 2.1.5 Element 5: Stabilize Soils 11 <br /> 2.1.6 Element 6: Protect Slopes 14 <br /> 2.1.7 Element 7: Protect Drain Inlets 15 <br /> 2.1.8 Element 8: Stabilize Channels and Outlets 16 <br /> 2.1.9 Element 9: Control Pollutants 18 <br /> 2.1.10 Element 10: Control Dewatering 22 <br /> 2.1.11 Element 11: Maintain BMPs 23 <br /> 2.1.12 Element 12: Manage the Project 24 <br /> 2.1.13 Element 13: Protect Low Impact Development(LID)BMPs 26 <br /> 3 Pollution Prevention Team 27 <br /> 4 Monitoring and Sampling Requirements 28 <br /> 4.1 Site Inspection` 28 <br /> 4.2 Stormwater Quality Sampling 28 <br /> 4.2.1 Turbidity Sampling 28 <br /> 4.2.2 pH Sampling 30 <br /> 5 Discharges to 303(d) or Total Maximum Daily Load(TMDL) Waterbodies 31 <br /> 5.1 303(d) Listed Waterbodies 31 <br /> 5.2 TMDL Waterbodies 31 <br /> 6 Reporting and Record Keeping 31 <br /> 6.1 Record Keeping 31 <br /> 6.1.1 Site Log Book 31 <br /> 6.1.2 Records Retention 31 <br /> 6.1.3 Updating the SWPPP 32 <br /> 6.2 Reporting 32 <br /> 6.2.1 Discharge Monitoring Reports 32 <br /> 6.2.2 Notification of Noncompliance 32 <br /> Page 12 <br />