My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7805 40TH AVE W 2022-05-12
>
Address Records
>
40TH AVE W
>
7805
>
7805 40TH AVE W 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:23:37 PM
Creation date
5/9/2022 8:08:50 AM
Metadata
Fields
Template:
Address Document
Street Name
40TH AVE W
Street Number
7805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.12 Element 12: Manage the Project <br /> The project will be managed based on the following principles: <br /> • Projects will be phased to the maximum extent practicable and seasonal work limitations <br /> will be taken into account. <br /> • Inspection and monitoring: <br /> o Inspection,maintenance and repair of all BMPs will occur as needed to ensure <br /> performance of their intended function. <br /> o Site inspections and monitoring will be conducted in accordance with Special <br /> Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map. <br /> Sampling station(s)are located in accordance with applicable requirements of the <br /> CSWGP. <br /> • Maintain an updated SWPPP. <br /> o The SWPPP will be updated,maintained, and implemented in accordance with <br /> Special Conditions S3, S4, and S9 of the CSWGP. <br /> As site work progresses the SWPPP will be modified routinely to reflect changing site <br /> conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br /> Table 5—Management <br /> SIC Design the project to fit the existing topography, soils,,and drainage patterns <br /> ® Emphasize erosion control rather than sediment control <br /> ® Minimize the extent and duration of the area exposed <br /> • Keep runoff velocities low <br /> ® Retain sediment on-site <br /> E] Thoroughly monitor site and maintain all ESC measures <br /> ® Schedule major earthwork during the dry season <br /> ® Other(please describe) <br /> List and describe BMPs <br /> • Materials on Hand(BMP C 150) <br /> • Certified Erosion and Sediment Control Lead(BMP C 160) <br /> • Scheduling(BMP C l62) <br /> Page I24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.