Table 6—BMP Implementation Schedule <br /> Phase of Construction Wet/Dry <br /> Project Stormwater BMPs Date Season <br /> Mark Clearing Limits High Visibility Plastic or Metal 03/01/2019 Dry <br /> Fence(BMP C103) <br /> Mobilize equipment on Construction Road/Parking area 03/01/2019 Dry <br /> site stabilization(BMP C 107) <br /> Mobilize and store all Silt Fence(BMP C233) 03/01/2019 Dry <br /> ESC and soil Storm Drain Inlet Protection <br /> stabilization products (BMP C220) <br /> Plastic Covering(BMP C123) <br /> Surface roughening(BMP C 130) <br /> Install ESC measures Silt Fence(BMP C233) 03/01/2019 Dry <br /> Storm Drain Inlet Protection <br /> (BMP C220) <br /> Install stabilized Stabilized Construction Entrance 03/01/2019 Dry <br /> construction entrance (BMP C105) <br /> Begin clearing and Dust Control(BMP C140) 03/15/2019 Dry <br /> grubbing <br /> Site grading begins Dust Control(BMP C140) 04/01/2019 Dry <br /> Install Temporary Temporary Sediment Pond(BMP 04/01/2019 Dry <br /> Sediment Pond C241) <br /> Grade road and stabilize Dust Control (BMP C140) 04/01/2019 Dry <br /> with gravel base <br /> Implement Element#12 Scheduling(BMP C162) 5/01/2019 Wet <br /> BMPs and manage site CESC Lead(BMP C160) <br /> to minimize soil <br /> disturbance during the <br /> wet season <br /> Temporary erosion Temporary Seeding(BMP C120) 5/01/2019 Wet <br /> control measures (hydro- <br /> seeding) <br /> Soil stabilization on Mulching(BMP C 121) 6/05/2019 Wet <br /> excavated side slopes(in Dust Control (BMP C 140) <br /> idle, no work areas) Plastic Covering(BMP C123) <br /> Nets and Blankets (BMP C122) <br /> Site grading ends 8/15/2019 Wet <br /> Page 125 <br />