My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7805 40TH AVE W 2022-05-12
>
Address Records
>
40TH AVE W
>
7805
>
7805 40TH AVE W 2022-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:23:37 PM
Creation date
5/9/2022 8:08:50 AM
Metadata
Fields
Template:
Address Document
Street Name
40TH AVE W
Street Number
7805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Begin pouring concrete BMP C151 01/01/2020 Dry <br /> curbs & sidewalks and Concrete Handling(BMP C151) <br /> implement Sawcutting and Surfacing <br /> Pollution Prevention(BMP <br /> C 152) <br /> Pave asphalt roads 01/05/2020 Dry <br /> Final landscaping and 02/01/2020 Dry <br /> planting begins <br /> Permanent erosion Permanent Seeding(BMP C120) 03/01/2020 Dry <br /> control measures (hydro- <br /> seeding) <br /> 2.1.13 Element 13: Protect Low Impact Development(LID) BMPs <br /> On-site stormwater management BMPs used for runoff from roofs and other hard surfaces <br /> include: full dispersion, roof downspout full infiltration or dispersion systems, perforated <br /> stubout connections, rain gardens, bioretention systems, permeable pavement, sheetflow <br /> dispersion, and concentrated flow dispersion. The areas on the site to be used for these <br /> BMPs shall be protected from siltation and compaction during construction by sequencing <br /> the construction in a fashion to install these BMPs at the latter part of the construction <br /> grading operations,by excluding equipment from the BMPS and the associated areas, and <br /> by using the erosion and sedimentation control BMPs listed below. Additional <br /> requirements for protecting these BMPs during the construction process, testing <br /> functionality, and restoring functionality are needed at the final stage of the construction <br /> process. <br /> Relevant BMPs <br /> BMP C 102: Buffer Zone BMP <br /> C 103: High Visibility Fence BMP <br /> C200: Interceptor Dike and Swale BMP <br /> C201: Grass-lined Channels BMP <br /> C207: Check Dams BMP <br /> C208: Triangular Silt Dike BMP <br /> C231: Brush Barrier BMP <br /> C233: Silt Fence BMP <br /> C234: Vegetated Strip <br /> Page 126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.