Laserfiche WebLink
resubmittal to address the comments below (handwritten remarks under each comment on this letter are <br /> perfectly acceptable).The below listed sheets have redlines. <br /> i. Sheet C4.01 <br /> Response: Existing detention pipe label has been added onto the plan as noted. <br /> ii. Sheet C4.02 <br /> Response: Labels have been revised,please see Final Plans. <br /> iii. Sheet C4.04 <br /> Response:The WWHM model report in the drainage report has been revised to match <br /> the drawing details. <br /> iv. Sheet C5.01 <br /> Response: Included DCDA on the active fire lines (8" and 6") per COE standard detail <br /> 515.The 4" domestic line have DCVA proposed inside the building mechanical rooms, <br /> see building renovation plumbing plan P2.01a and P2.01b for details. <br /> v. Sheet C6.01 <br /> Response:The parking lot layout was designed based on the City of Everett Standards. <br /> Note has been revised as noted. <br /> vi. Sheet L2.01 <br /> Response:The City's reviewer has clarified this measurement wasn't intended to be left <br /> on the plan as a comment. <br /> vii. Sheet L2.02 <br /> Response:See comment response below to planning review comment 3.a and 3.b. <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you have any questions <br /> regarding these comments, please contact Cindy Cullen with the City of Everett Surface Water <br /> Department(425-257-8894 or CCullen@everettwa.gov). <br /> a. Drainage Report Text Comments <br /> i. Page 9-Minimum Requirement#3:Source Control of Pollution—Please list and <br /> describe the specific Source Control BMPs that will be used for post-development. <br /> Response:Added section to Drainage Report. <br /> ii. Page 15—The project should also meet the requirements in EMC 14.56. <br /> Response:Confirmed that the project meets EMC 14.56 and added reference in <br /> Drainage Report. Included and called out in Stormwater Conveyance section on page <br /> 16. <br /> iii. Include the O&M manual as a separate document. Include the Biopod O&M <br /> information. <br /> Response:An O&M manual is provided. <br /> iv. The report should include a figure showing the collection area for the WO facility and <br /> the detention vault since they are different than the areas being mitigated.This could <br /> be on Figure 4 if it can be shown cleanly or on a separate figure. <br /> a 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of <br />