Laserfiche WebLink
Start End Total 25.25 Logged By SH Driller Geologic Drill,Inc. Drilling <br /> Drilled 1/14/2009 1/14/2009 Depth(ft) Checked By DCO Method Hollow stem Auger/SPT <br /> Surface Elevation(ft) 569.0 Hammer Automatic Drilling Deep Rock XL <br /> Vertical Datum Data 140(Ibs)/30(in)Drop Equipment <br /> Easting(X) System Groundwater <br /> Northing(Y) Datum Depth to <br /> _______ Date Measured Water(ftl Elevation(ftl <br /> Notes: Not Encountered Undetermined <br /> FIELD DATA <br /> w -� E a o MATERIAL <br /> u) REMARKS <br /> i <br /> o, _ DESCRIPTION4,2 O gi g m E.N 2 2 co w "2 <br /> W 0 K m ti cF 5 0 CCU gci a°....- <br /> 0 ii AC 7 inches asphalt concrete <br /> - SM - Gray silty fine to medium sand with occasional - <br /> gravel(medium dense,moist)(fill) <br /> SM - Gray silty fine to medium sand with occasional <br /> - <br /> 12 52 1 _ gravel(very dense,moist)(glacial till) SA <br /> h6h - <br /> 10 <br /> 5� 17 94/11" 2 <br /> 11 <br /> - 9 <br /> - 10 I ••. — — <br /> 17 85/11" 3 <br /> Becomes bluish gray <br /> °'- � - <br /> - <br /> 15— 6 50/6" 4 — — <br /> yo <br /> h - _ <br /> i 20 10 50/4" 5 • <br /> — — 8 <br /> 0 <br /> w 5 <br /> w- 25 1 \50/3",, 6 <br /> z <br /> w <br /> 0 <br /> w <br /> w <br /> E <br /> r <br /> E <br /> r <br /> 0m <br /> 'a <br /> o <br /> Fii <br /> c9 <br /> Note:See Figure A-1 for explanation of symbols. <br /> g <br /> Log of Boring B-1 <br /> Project: Community Transit/Kasch Park Base <br /> Project Location: Everett,Washington <br /> GiEOENGINEERS Figure A-2 <br /> w Project Number: 2095-019-03 Sheet 1 of 1 <br />