Laserfiche WebLink
Start End Total 165 Logged By SH Drilling <br /> . <br /> Drilled 1/14/2009 1/14/2009 Depth(ft) Checked By DCO Driller Geologic Drill,Inc. Method Hollow-stem Auger/SPT <br /> Surface Elevation(ft) 570.0 Hammer Automatic Drilling Deep Rock XL <br /> Vertical Datum Data 140(Ibs)/30(in)Drop Equipment <br /> Easting(X) System Groundwater <br /> Northing(Y) Datum Depth to <br /> Date Measured Water(ft) Elevation(ftl <br /> Notes: Not Encountered Undetermined <br /> FIELD DATA <br /> ip <br /> a a <br /> -� v £ E MATERIAL <br /> • w o da) w <br /> al <br /> REMARKS <br /> 7, co ' DESCRIPTIONa)w <br /> L o m acy 4 o. gN �g� ❑ <br /> a? S V o - mo y <br /> w 0 c rz m U rn1- C9 CDo 2U ❑- <br /> 0 • AC 7 inches asphalt concrete <br /> - - SM - Gray silty fine to coarse sand with occasional - <br /> % gravel(medium dense,moist)(fill) <br /> SM Gray silty fine to medium sand with occasional <br /> _I 50/6" 1 _ gravel(very dense,moist)(glacial till) _ 11 <br /> h6- 5 5 - - <br /> 10 50/4" 2 - - 9 <br /> 0- � <br /> -h 10 11 50/5" 3 -- <br /> Becomes bluish gray <br /> 5- c <br /> -`O 15- - - <br /> 15 92/11" 4 . <br /> • <br /> 0 <br /> a <br /> a <br /> z <br /> z <br /> g <br /> N <br /> 2 <br /> is)W <br /> F <br /> O <br /> W <br /> O <br /> 0 <br /> W <br /> W <br /> Z <br /> V' <br /> z <br /> woo <br /> U' <br /> iii <br /> 1- <br /> g <br /> ' <br /> 1� <br /> Om <br /> a <br /> try? <br /> fj <br /> 5 <br /> iii Note:See Figure A-1 for explanation of symbols. <br /> h <br /> h <br /> Log of Boring B-2 <br /> a <br /> Project: Community Transit/Kasch Park Base <br /> I G EO E N G I N E E RS Project Location: Everett,Washington <br /> Figure A-3 <br /> 1 Project Number: 2095-019-03 Sheet 1 of 1 <br />