Laserfiche WebLink
Start End Total Logged By SH Drilling <br /> Drilled 1/14/2009 1/14/2009 Depth(ft) 16 Checked By DCO Driller Geologic Drill,Inc. Method Hollow-stem Auger/SPT <br /> Surface Elevation(ft) 571.0 Hammer Automatic Drilling Deep Rock XL <br /> Vertical Datum Data 140(Ibs)/30(in)Drop Equipment <br /> Easting(X) System Groundwater <br /> Northing(Y) Datum Depth to <br /> Date Measured Water(ft) Elevation(ft) <br /> Notes: Not Encountered Undetermined <br /> FIELD DATA <br /> w --, E E o o MATERIAL <br /> o a d 0 �, o 2 DESCRIPTION o .y REMARKS <br /> �p L @ > N ft p.C L Q'n ,_a) <br /> C N <br /> N N a, pi,N O f.. 1co 22 2_a :O O Z' <br /> 0 a AC 7 inches asphalt concrete <br /> �Ao SM - Dark gray silty fine to medium sand with - <br /> '• occasional gravel(very dense,moist)(glacial <br /> - - — <br /> '.`'<— SM- <br /> -1 till) J <br /> - _I 10 50/4" 1 _ Bluish gray silty fine to medium sand with - 10 <br /> occasional gravel(very dense,moist)(glacial <br /> - •• • - till) - <br /> - 5 A 11 50/5" 2 • • 9 <br /> • <br /> - 10 7 11 50/2" 3 — <br /> - 15 ' 12 50/6" 4 — — <br /> -yh <br /> 0 <br /> z <br /> z <br /> a <br /> r <br /> x <br /> U0 <br /> W <br /> w <br /> O <br /> w <br /> O <br /> 0 <br /> CD <br /> K <br /> zw <br /> w <br /> z <br /> z <br /> O <br /> O <br /> E <br /> H <br /> t <br /> F <br /> a <br /> (9 <br /> 0. <br /> Note:See Figure A-1 for explanation of symbols. <br /> 0 <br /> 116 <br /> a <br /> Log of Boring B-3 <br /> Project: Community Transit/Kasch Park Base <br /> G EO E N G I N E E R S Project Location: Everett,Washington <br /> Figure A-4 <br /> w Project Number: 2095-019-03 Sheet 1 of 1 <br />