Laserfiche WebLink
• I <br /> To: Meg Haley, Plans Examiner, City of Everett <br /> From: Douglas E. Engelson, Architect rE �� a 1) <br /> D <br /> Date: February 4, 2017 8 2 �� <br /> RE: Remodel of Elevator for the Hodges Building CITY OF EVERETT <br /> Permit Cervices <br /> Li <br /> B1606-32 <br /> Following is an item by item response to your letter dated 8-1-16: <br /> General: <br /> 1. 'Will do, but this does not apply to Phase One of the Project, which is what <br /> B1606-32 is for. <br /> 2. DNA to Phase One <br /> 3. DNA to Phase One <br /> 4. See Note 4 added to General Notes on Sheet 1. <br /> 5. See General Notes on Sheet 1. <br /> 6. DNA to Phase One <br /> 7. DNA to Phase One <br /> 8. DNA to Phase One <br /> 9. DNA to Phase One <br /> 10. DNA to Phase One <br /> Structural: See response from N L Olson & Associates. <br /> Occupancy: <br /> 1. DNA to Phase One. <br /> 2. DNA to Phase One. Stairs, corridors, and doors are existing. The exception <br /> is the new stair, which replaces the existing stair, from the 1st floor to the <br /> 2nd floor, where the stair width is existing, and the door and landing at the <br /> top of said stair is new. See letter from fire-protection engineering <br /> consultant, Brian Thompson, from AEGIS Engineering, dated 1-12-17, which <br />