Laserfiche WebLink
• • <br /> gives his conclusions, of which applicable portions are included into the <br /> Phase One Drawings. See changes on Sheets 1 through 8. <br /> 3. DNA to Phase One. <br /> Egress: <br /> 1. See door called out in plan on Sheet 6. The door and stair to the existing <br /> control room are existing and are not proposed to be changed. The control <br /> room has been revised to have no addition in plan, but a new roof for the <br /> existing penthouse is proposed, -see changes to plan on Sheet 7 and <br /> changes to sections on Sheets 9 and 10. <br /> 2. DNA to Phase One. <br /> 3. See attached page supplied by ThyssenKrupp Elevator showing the <br /> dimensions and compliance for the elevator with the 42 inch side slide <br /> door, which they are going to install in this Project. <br /> 4. This will be part of Phase Two. <br /> 5. This will be part of Phase Two. <br /> 6. DNA to Phase One. <br /> 7. DNA to Phase One. <br /> 8. This will be part of Phase Two. <br /> 9. DNA to Phase One. <br /> 10. DNA to Phase One. <br /> 11. This will be part of Phase Two. <br /> Construction: <br /> 1. This will be part of Phase Two. <br /> 2. See Stair & Elev Notes added on Sheet 1 and revisions to sections and <br /> details on Sheets 9 and 10. There are no new walls common in Phase One <br /> with dwelling units. See the GA No. Files included in these. <br /> 3. All doorways included in Phase One work are existing with existing door <br /> heights of 6'-8", except new door in basement which is size to fit opening in <br /> the existing concrete wall. All said doors have widths and fire ratings <br /> called out in each floor plan and in the Stair/Elev Notes added to Sheet 1. <br /> See note 5 added to General Notes on Sheet 1 for door hardware. <br /> 0 <br />