Laserfiche WebLink
A 13/Nov/2019 <br />REV DATE <br />Final drawing based on DC-203651- Room Move <br />01- C1- Cover Sheet <br />02 - C2 - Disclaimer - Site Readiness Checklist <br />03 - A1- General Dotes <br />04 - A2 Equipment La out <br />Y <br />05 - A3 - Radiation Protection <br />06 - A4 Equipment Dimensions <br />07 - A5 - Delivery <br />08 <br />- S1- <br />Structural <br />Notes <br />09 <br />- S2 <br />- Structural <br />Layout <br />MODIFICATIONS <br />10 <br />- <br />S3 -Structural <br />Details <br />(1) <br />11-M1-HVAC <br />12 - <br />E1 <br />-Electrical <br />Notes <br />13 - <br />E2 -Electrical <br />Layout <br />14 - E3 - Electrical Elevations <br />15 - E4 - Power Requirements <br />16 - E5 - Electrical Details - Interconnect <br />A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in <br />incomplete documentation required for site design and preparation. <br />Pre Installation documents for GE Healthcare products can be accessed on the web at: www.ehealthcare.comsiteplanning <br />GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete <br />set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All <br />dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work <br />due to scaling from these drawings. <br />Providence Medical Center- Everett <br />Everett., Washington <br />t3 IE Healthcare <br />A3 1491=11-091 <br />USA <br />Michael Daniels <br />12063004533 <br />Michael.daniels@ge.com <br />Discovery CT750 HD <br />FINAL STUDY <br />Verified by I Concession <br />S.O. (GON) <br />PIM Manual Rev <br />5220253-1EN I 19 <br />Date I Sheet <br />13/Nov/2019 1 01/16 <br />