Laserfiche WebLink
d,. Suitable radiological <br />,lr g protection must be <br />determined qualified radiological <br />physicist conformation <br />a <br />local regulations. <br />,..__.,_ does not take responsibility for theprovision _ ,., - ram, <br />specification <br />i <br />Room <br />- including ceiling height, <br />h Exam, Equipment/Technical <br />$' & Control meets <br />e _ <br />correctCeiling support structure, if on the GF drawing, is at <br />location and height according to the drawing specifications. Levelness and <br />Rooms that will contain equipment, including staging areas if applicable, are construction debris free® Precautions must be taken to prevent <br />debris from entering rooms containing equipment. <br />Swelivery route from truck to <br />installation space <br />I. e reviewed, communications occurred, arrangements <br />j-.3' made <br />E _`d o , ,mod, # <br />handlingi. <br />Floors along delivery A support the if - equipment, <br />� j p reinforcements <br />.r3 �::� � � arranged <br />a e �. needed. <br />System power & grounding ( J P) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out <br />Tag Out is available. <br />System power and grounded audit has been scheduled to be completed urin installation of equipment. (If Required) GEHC PM to <br />confirmed if needed® <br />Adequate room illumination installed and working. <br />Cableways (floor, wall, ceiling, etc.) ready for GE cables and are of correct length and diameter. Cableways routed per GE Final drawings and <br />access openings installed as determined by GEHC PIVI. Surface floor duct installed at time of system installation. <br />HVAC systems Installed, and the site meets minimum environmental operational system requirements. <br />Network outlets installed and computer network available and working. <br />Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required) <br />Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications® Floor Strength and <br />thickness have been discussed with customer/contractor and they have confirmed GE requirements are met. <br />Customer supplied countertops where GE equipment will be installed are in places <br />Doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & raioprotection <br />regulatory approval for installation obtained. <br />Providence Medical gem I <br />....................... <br />-M2-1 N-->r I I A I Date <br />-------------------------- --------------------------------------------------------------------------------------------------------------------------- ---- -----.......................... ------.--................................................... <br />I <br />- Disclaimer <br />.......... ............ .._...... ------ -------.---------------------- <br />