Laserfiche WebLink
ENVIRONMENT <br />OPERATOR CONSOLE. - <br />Ambient static magnetic fields less than 10 Gauss. <br />Use static dissipative vinyl. <br />Noise level pro 10 <br />Any deviation from these drawings must be communicated in writing to and reviewed by your local GE <br />Healthcare Installation project manager prior to making changes. <br />Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver <br />the equipment to the installation site. If desired, your local GE Healthcare Installation project manager can <br />supply a reference list of rigging contractors. <br />Provide for refuse removal and disposal (e. <br />It is the customer's responsibility to contract a vibration consultant/engineer to implement site design <br />modifications to meet the GE vibration specification. Refer to the system preins tallation manual for the <br />vibration specification. <br />Providence Medical Center- Everett <br />---- ­­ ........... - ... ............ ­­­ ... ­­­ ... ............ ­­­­ ............ ................. ­­­­ ... -- <br />I ery DiscovCT750 HD <br />- ................... ...... - .... ­­ ... ...... ..................... ­­­ .......................... ­­ .... - ............. ­­­ ............. I ......... ......... ­­­­ ...... ............ C.T.-.M..2.0.4..I�3,0.-..F.I..N.-.0.1..-�A.,.-D.W.G. <br />RevAlDate 13/Nov/2019 I Deliver v - Disclaimer <br />