Laserfiche WebLink
SECTION 210000 - FIRE SUPPRESSION PIPING SYSTEMS <br />1.1 SCOPE OF WORK/DESIGN CRITERIA <br />A. THE MEANING AND INTENTION OF THESE SPECIFICATIONS, IN CONJUNCTION WITH THE <br />DRAWING(S), IS TO COVER A COMPLETELY INSTALLED, FULLY OPERATING FIRE <br />SPRINKLER PROTECTION SYSTEM FOR THE ENTIRE BUILDING. TO ACCOMPLISH THIS <br />PURPOSE, THE CONTRACTOR SHALL PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT <br />AND LABOR NECESSARY AND REQUIRED AND WILL BEAR ALL EXPENSES INCIDENTAL <br />TO THE SATISFACTORY COMPLETION OF THE WORK. <br />B. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DESIGN AND INSTALL THE <br />SYSTEM SO THAT NO INTERFERENCES EXIST BETWEEN THE FIRE PROTECTION PIPING, <br />AND EQUIPMENT AND SYSTEMS INSTALLED BY OTHER DISCIPLINES. <br />C. COMPLY WITH APPLICABLE LOCAL CODES, STATE AND LOCAL FIRE MARSHAL'S <br />STANDARDS, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND NFPA 13 <br />FOR INSTALLATION AND DESIGN OF SYSTEMS. <br />D. THE DESIGN SHALL BE GOVERNED FIRST AND FOREMOST BY CODE COMPLIANCE AND <br />SECONDLY BY THE SPECIFICATIONS/CONTRACT DOCUMENTS. IF A DISCREPANCY <br />EXISTS BETWEEN CODE AND CONTRACT DOCUMENTS, THE STRICTER SHALL BE <br />COMPLIED WITH. IF SUCH DISCREPANCY EXISTS, NOTIFICATION IS EXPECTED AND AN <br />ADDENDUM WILL BE ISSUED. <br />E. CONTRACTOR IS RESPONSIBLE FOR FEES AND PERMIT COSTS RELATED TO INSTALLING <br />SYSTEM EXCEPT AS NOTED. <br />SECTION 220000 - GENERAL PLUMBING REQUIREMENTS <br />PART 1 GENERAL <br />1.1 SCOPE OF WORK <br />INCLUDE COMPLETE AND FUNCTIONAL PLUMBING SYSTEMS - INCLUDING ALL <br />REQUIRED MATERIALS, LABOR, EQUIPMENT AND SERVICES NECESSARY TO ACHIEVE <br />THE DESIRED FINAL PRODUCT. <br />1.2 APPLICABLE CODES <br />A. WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES AND <br />STANDARDS AS ADOPTED BY THE AUTHORITIES HAVING JURISDICTION INCLUDING <br />AMENDMENTS. FOLLOWING IS A LISTING OF MAJOR CODES AND STANDARDS, THE <br />REQUIREMENTS OF WHICH SHALL BE CONSIDERED PART OF THE SCOPE OF THIS <br />PROJECT. THIS LIST SHOULD NOT BE CONSIDERED COMPREHENSIVE AND CODES OR <br />STANDARDS NOT INCLUDED IN THIS LIST SHOULD NOT BE CONSIDERED TO BE <br />EXCLUDED FROM THE SCOPE OF THE PROJECT. <br />1. AMERICANS WITH DISABILITIES ACT (ADA). <br />2. APPLICABLE STATE AND LOCAL CODES AND ORDINANCES. <br />3. NATIONAL ELECTRICAL CODE. <br />4. INTERNATIONAL BUILDING CODE. <br />5. INTERNATIONAL FIRE CODE. <br />6. INTERNATIONAL MECHANICAL CODE. <br />7. UNIFORM PLUMBING CODE. <br />8. WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE. <br />9. WASHINGTON STATE INDOOR AIR QUALITY CODE. <br />10. WASHINGTON STATE BOILER AND UNFIRED PRESSURE VESSEL CODE. <br />1.3 PERMITS AND FEES <br />A. ALL PERMITS AND INSPECTIONS REQUIRED TO COMPLETE THE SCOPE OF WORK <br />SHALL BE INCLUDED IN THE BID PRICE. <br />B. ALL FEES REQUIRED BY UTILITY PROVIDERS SHALL BE INCLUDED IN THE DIVISION 22 <br />BID PRICE. <br />1.4 SCOPE AND APPROPRIATE USE OF BID DOCUMENTS <br />A. THESE SPECIFICATIONS AND ACCOMPANYING DRAWINGS ARE INTENDED TO <br />COMMUNICATE THE DESIGN CONCEPT FOR THIS PROJECT AND OUTLINE THE SCOPE <br />OF WORK. WORK NOT SPECIFICALLY NOTED IN THESE SPECIFICATIONS OR THE <br />ACCOMPANYING DRAWINGS, BUT WHICH IS REQUIRED TO COMPLETE THE PROJECT, <br />SHALL BE INCLUDED AS PART OF CONTRACTOR'S SCOPE. <br />B. THESE SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS ARE INTENDED TO <br />SUPPLEMENT EACH OTHER. INFORMATION INCLUDED IN EITHER ONE SHALL BE <br />INCORPORATED INTO THE PROJECT AS IF INCLUDED IN BOTH. IN THE EVENT OF <br />ANY CONFLICTS, THE MOST STRINGENT REQUIREMENTS SHALL BE CONSIDERED THE <br />GOVERNING SCOPE OF WORK UNTIL AND UNLESS CLARIFICATION CAN BE OBTAINED <br />BY THE CONTRACTOR. <br />C. DRAWINGS ARE INTENDED TO INDICATE THE GENERAL ARRANGEMENT OF PIPING, <br />DUCTWORK, EQUIPMENT AND OTHER COMPONENTS OF SYSTEMS. THEY SHALL BE <br />FOLLOWED AS CLOSELY AS POSSIBLE, BUT SHALL BE CONSIDERED DIAGRAMMATIC IN <br />NATURE. THEY ARE NOT INTENDED TO SHOW EVERY COMPONENT, FITTING, OFFSET, <br />ETC. COMPONENTS, FITTINGS, OFFSETS, ETC. AS REQUIRED TO MEET THE INTENT OF <br />THE DOCUMENTS AND TO ACHIEVE COORDINATION WITH OTHER TRADES SHALL BE <br />INCLUDED IN THE DIVISION 22 SCOPE OF WORK. <br />1.5 ROUTING AND LOCATIONS <br />A. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE EQUIPMENT LOCATIONS <br />AND SYSTEM ROUTING WITH AVAILABLE SPACE AND WITH ALL OTHER TRADES. <br />1.6 SCHEDULING <br />A. IT IS UNDERSTOOD THAT WHILE DRAWINGS ARE TO BE FOLLOWED AS CLOSELY AS <br />CIRCUMSTANCES PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />INSTALLATION OF SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF <br />CONTRACT DOCUMENTS. ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED <br />BY MAKING APPLICATION TO OWNER'S REPRESENTATIVE. THE CONTRACTOR SHALL <br />FAMILIARIZE HIMSELF WITH HIS SCOPE OF WORK AS WELL AS THE REQUIRED <br />COORDINATION WITH OTHER TRADES AND THE SCHEDULING OF OTHER TRADES <br />SUFFICIENTLY TO ADDRESS COORDINATION ISSUES IN A TIMELY MANNER SUCH THAT <br />THEY DO NOT RESULT IN REMEDIAL WORK FOR OTHER TRADES. <br />B. THE CONTRACTOR SHALL COORDINATE WITH THE WORK OF VARIOUS TRADES WHEN <br />INSTALLING INTERRELATED WORK. BEFORE INSTALLATION OF PLUMBING ITEMS, <br />PROPER PROVISIONS SHALL BE MADE TO AVOID INTERFERENCES. CHANGES <br />REQUIRED IN WORK SPECIFIED IN DIVISION 22 CAUSED BY NEGLECT TO DO SO <br />SHALL BE MADE AT NO COST TO OWNER. <br />1.7 CUTTING AND PATCHING <br />A. THE DIVISION 22 CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND <br />PATCHING REQUIRED TO COMPLETE THE DIVISION 22 SCOPE OF WORK. <br />1.8 GUARANTEE <br />A. ALL DIVISION 22 SYSTEMS AND EQUIPMENT SHALL BE GUARANTEED FOR A MINIMUM <br />PERIOD OF ONE YEAR. <br />B. THE GUARANTEE SHALL BEGIN AT THE DATE OF ACCEPTANCE, UNLESS WRITTEN <br />DOCUMENTATION IS PROVIDED NOTING OTHERWISE. <br />1.9 QUALITY ASSURANCE <br />A, MATERIAL AND EQUIPMENT QUALIFICATIONS <br />1. PROVIDE MATERIALS AND EQUIPMENT THAT ARE STANDARD PRODUCTS OF <br />MANUFACTURERS REGULARLY ENGAGED IN THE MANUFACTURE OF SUCH <br />PRODUCTS, WHICH ARE OF A SIMILAR MATERIAL, DESIGN AND WORKMANSHIP. <br />STANDARD PRODUCTS SHALL HAVE BEEN IN SATISFACTORY COMMERCIAL OR <br />INDUSTRIAL USE FOR 2 YEARS PRIOR TO BID OPENING. THE 2-YEAR USE <br />SHALL INCLUDE APPLICATIONS OF EQUIPMENT AND MATERIALS UNDER SIMILAR <br />CIRCUMSTANCES AND OF SIMILAR SIZE. THE PRODUCT SHALL HAVE BEEN FOR <br />SALE ON THE COMMERCIAL MARKET THROUGH ADVERTISEMENTS, <br />MANUFACTURERS' CATALOGS OR BROCHURES DURING THE 2 YEAR PERIOD. <br />A. SERVICE SUPPORT: THE EQUIPMENT ITEMS SHALL BE SUPPORTED BY SERVICE <br />ORGANIZATIONS. WHEN REQUESTED TO GAIN APPROVAL, SUBMIT A CERTIFIED LIST <br />OF QUALIFIED PERMANENT SERVICE ORGANIZATIONS FOR SUPPORT OF THE <br />EQUIPMENT WHICH INCLUDES THEIR ADDRESSES AND QUALIFICATIONS. <br />B. UL LISTINGS: ALL EQUIPMENT SHALL BE PROVIDED WITH A UL OR APPROVED <br />EQUIVALENT LABEL WHEN LABELING IS AVAILABLE FOR THAT TYPE OF EQUIPMENT. <br />C. ALL CONTROL PANELS SHALL BE UL LISTED (OR EQUIVALENT APPROVED LABEL). <br />D. PRESSURE VESSELS SHALL BE PROVIDED IN ACCORDANCE WITH APPLICABLE <br />PRESSURE VESSEL ORDINANCES. <br />E ALL MECHANICAL EQUIPMENT SHALL HAVE AN AIC RATING OF 100,000 OR <br />OTHERWISE SPECIFIED ON ELECTRICAL ONE -LINE DIAGRAMS FAULT CURRENT FOR <br />EACH PIECE OF EQUIPMENT. <br />1,10 SUBMITTALS <br />A. SUBMITTAL INFORMATION SHALL BE PROVIDED AND APPROVED ON ALL MATERIALS <br />AND EQUIPMENT PRIOR TO ORDERING. <br />B. PROVIDE INDICATION OF WHICH OPTIONS AND ACCESSORIES ARE TO BE INCLUDED. <br />C. INCLUDE ALL SCHEDULED INFORMATION FOR EQUIPMENT LISTED IN SCHEDULES ON <br />THE DRAWINGS. <br />D. REVIEW WILL BE FOR GENERAL CONFORMANCE ONLY AND SHALL NOT RELIEVE THE <br />CONTRACTOR FOR ANY DEVIATIONS FROM THE REQUIREMENTS OF THE DOCUMENTS <br />UNLESS CLEAR WRITTEN REFERENCE IS MADE BY THE CONTRACTOR IN THE <br />SUBMITTAL TO PROPOSED DEVIATIONS. <br />1.11 DELIVERY, STORAGE, AND HANDLING <br />A. FOLLOW MANUFACTURER'S DIRECTIONS IN DELIVERY, STORAGE, PROTECTION AND <br />INSTALLATION OF EQUIPMENT AND MATERIALS. <br />B. HANDLE, STORE, AND PROTECT EQUIPMENT AND MATERIALS TO PREVENT DAMAGE <br />BEFORE AND DURING INSTALLATION IN ACCORDANCE WITH THE MANUFACTURER'S <br />RECOMMENDATIONS AND AS APPROVED BY THE CONTRACTING OFFICER. REPLACE <br />DAMAGED OR DEFECTIVE ITEMS. <br />1.12 OPERATION AND MAINTENANCE MANUALS <br />A. PROVIDE A CONSOLIDATED OPERATION AND MAINTENANCE MANUAL FOR DIVISIONS <br />21, 22 AND 23, REFER TO SECTION 230000 FOR REQUIREMENTS. <br />SECTION 220500 - EAT PLUMBING MATERIALS AND METHODS <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. PRODUCT DATA FOR SPECIFIED MATERIALS. <br />B. WELDING CERTIFICATES. <br />1.2 DELIVERY, STORAGE, AND HANDLING <br />A. DELIVER PIPES AND TUBES WITH FACTORY -APPLIED END CAPS. MAINTAIN END <br />CAPS THROUGH SHIPPING, STORAGE AND HANDLING TO PREVENT PIPE END DAMAGE <br />AND TO PREVENT ENTRANCE OF DIRT, DEBRIS, AND MOISTURE. <br />PART 2 PRODUCTS <br />2.1 ACCESS DOORS <br />A. ACCESS DOORS SHALL BE PROVIDED BY DIVISION 22 WHEN SERVING DIVISION 22 <br />SYSTEMS AND EQUIPMENT IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION <br />08. <br />2.2 DIELECTRIC FITTINGS <br />A. DESCRIPTION: COMBINATION FITTING OF COPPER ALLOY AND FERROUS MATERIALS <br />WITH THREADED, SOLDER -JOINT, PLAIN OR WELD -NECK END CONNECTIONS THAT <br />MATCH PIPING SYSTEM MATERIALS. <br />2.3 ESCUTCHEONS <br />A. DESCRIPTION: CHROME PLATED STEEL MANUFACTURED WALL AND CEILING <br />ESCUTCHEONS AND FLOOR PLATES, WITH AN ID TO CLOSELY FIT AROUND PIPE, <br />TUBE AND INSULATION OF INSULATED PIPING AND AN OD THAT COMPLETELY <br />COVERS OPENING. <br />2.4 JOINING MATERIALS <br />A. REFER TO INDIVIDUAL DIVISION 22 PIPING SECTIONS FOR SPECIAL JOINING <br />MATERIALS NOT LISTED BELOW. JOINING MATERIAL REQUIREMENTS LISTED IN <br />INDIVIDUAL SECTIONS SHALL SUPERSEDE THE REQUIREMENTS IN THIS SECTION. <br />B. SOLDER FILLER METALS: ASTM B 32, LEAD-FREE ALLOYS. INCLUDE <br />WATER-FLUSHABLE FLUX ACCORDING TO ASTM B 813. <br />C. BRAZING FILLER METALS: AWS A5.8, BCUP SERIES, COPPER -PHOSPHORUS ALLOYS <br />FOR GENERAL -DUTY BRAZING, UNLESS OTHERWISE INDICATED; AWS A5.8, BAG1, <br />SILVER ALLOY FOR REFRIGERANT PIPING, UNLESS OTHERWISE INDICATED. <br />PART 3 EXECUTION <br />3.1 GENERAL <br />A. MECHANICAL DEMOLITION <br />1. REFER TO DIVISION 1 AND MECHANICAL SECTIONS FOR GENERAL DEMOLITION <br />REQUIREMENTS AND PROCEDURES. <br />2. DISCONNECT, DEMOLISH AND REMOVE MECHANICAL SYSTEMS, EQUIPMENT AND <br />COMPONENTS INDICATED TO BE REMOVED. <br />3. IF PIPE, INSULATION OR EQUIPMENT TO REMAIN IS DAMAGED IN APPEARANCE <br />OR IS UNSERVICEABLE, REMOVE DAMAGED OR UNSERVICEABLE PORTIONS AND <br />REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY. <br />B. PIPING SYSTEMS - COMMON REQUIREMENTS <br />1. INSTALL PIPING ACCORDING TO THE FOLLOWING REQUIREMENTS AND DIVISION 23 <br />SECTIONS SPECIFYING PIPING SYSTEMS. <br />2. INSTALL PIPING IN CONCEALED LOCATIONS, UNLESS OTHERWISE INDICATED AND <br />EXCEPT IN EQUIPMENT ROOMS AND SERVICE AREAS. <br />3. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS <br />AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. <br />DIAGONAL RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED OTHERWISE. <br />4. INSTALL PIPING TO PERMIT VALVE SERVICING. <br />5. SELECT SYSTEM COMPONENTS WITH PRESSURE RATING EQUAL TO OR GREATER <br />THAN SYSTEM OPERATING PRESSURE. <br />6. FIRE -BARRIER PENETRATIONS: MAINTAIN INDICATED FIRE RATING OF WALLS, <br />PARTITIONS, CEILING, AND FLOORS AT PIPE PENETRATIONS. SEAL PIPE <br />PENETRATIONS WITH FIRESTOP MATERIALS. REFER TO DIVISION 7 SECTION <br />"THROUGH -PENETRATION FIRESTOP SYSTEMS" FOR MATERIALS. <br />3.2 ACCESS DOORS <br />A. PROVIDE ACCESS DOORS WHERE SPECIALTIES ARE NOT EXPOSED UNLESS <br />INDICATED TO BE PROVIDED UNDER OTHER DIVISIONS. <br />3.3 DIELECTRIC FITTINGS <br />A. PROVIDE DIELECTRIC FITTINGS WHENEVER CONNECTING PIPING OF DISSIMILAR <br />M ETALS. <br />3.4 ESCUTCHEONS <br />A. INSTALL ESCUTCHEONS FOR PENETRATIONS OF WALLS, CEILINGS AND FLOORS IN <br />FINISHED SPACES. <br />3.5 PAINTING <br />A. DAMAGE AND TOUCHUP: REPAIR MARRED AND DAMAGED FACTORY -PAINTED FINISHES <br />WITH MATERIALS AND PROCEDURES TO MATCH ORIGINAL FACTORY FINISH. <br />3.6 SLEEVES <br />A. PROVIDE SLEEVES FOR ABOVE GRADE PIPING PENETRATIONS OF WALLS, ROOFS AND <br />FLOORS. <br />SECTION 220523 - PLUMBING GENERAL DUTY VALVES <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. PRODUCT DATA: FOR EACH TYPE OF VALVE INDICATED. INCLUDE BODY, SEATING, <br />AND TRIM MATERIALS, VALVE DESIGN, PRESSURE AND TEMPERATURE <br />CLASSIFICATIONS, END CONNECTIONS, ARRANGEMENT, DIMENSIONS AND REQUIRED <br />CLEARANCES. <br />PART 2 PRODUCTS <br />2.1 GENERAL <br />A. VALVE STANDARDIZATION: VALVES FROM ONE OR MORE MANUFACTURERS MAY BE <br />USED, HOWEVER VALVES SUPPLIED FOR EACH SPECIFIC VALVE TYPE SHALL BE THE <br />PRODUCT OF ONE MANUFACTURER. <br />2.2 GENERAL MATERIALS <br />A. BODY <br />1. BRONZE: NO YELLOW BRASS ALLOYS CONTAINING MORE THAT 15 PERCENT <br />ZINC. FOR USE UP TO 150 PSIG WSP, ASTM B 62 AND OVER 150 PSIG TO <br />300 PSIG 2124 KPA) WSP, ,ASTM B 61. <br />B. STEM <br />1. CAST MANGANESE BRONZE: ASTM B 584. <br />2. CAST SILICON BRASS: ASTM B 584. <br />3. STAINLESS STEEL: AS SPECIFIED FOR PARTICULAR TYPE OF VALVE. <br />C. TRIM <br />1. AS SPECIFIED FOR PARTICULAR TYPE OF VALVE. <br />D. VALVE GROOVED ENDS: AWWAC606. <br />E. THREADED: WITH THREADS ACCORDING TO ASME 81.20.1. <br />2.3 GENERAL VALVES <br />A. MANUFACTURERS: ANVIL/GRUVLOK, CRANE, GRINNELL, MILWAUKEE, NIBCO, STOCKHAM, <br />WALWORTH, WATTS. <br />B. BALL VALVES: 3 PIECE CAST BRONZE BODY AND TAIL PIECE; SOLID BLOW-OUT <br />PROOF STEM; TEFLON SEATS; FULL PORT STAINLESS STEEL BALL; TEFLON SEALS; <br />CORROSION RESISTANT STEEL LEVER HANDLES WITH VINYL GRIPS; BALANCING STOP; <br />THREADED OR SOLDER CONNECTIONS FOR VALVES 2 INCHES (51 MM) AND <br />SMALLER. <br />1. PRESSURE RATINGS: <br />a. NPS 2 AND SMALLER: 150 PSIG WSP, 600 PSIG CWP. <br />2. BASIS OF DESIGN: NIBCO T585-70 (THREADED); NIBCO S585-70 (SOLDER); <br />NIBCO T585-70-NS (INSULATED APPLICATIONS). <br />C. BUTTERFLY VALVES: 200 PSIG WOG BI-DIRECTIONAL DIFFERENTIAL PRESSURE AT 275 <br />DEG F; VALVE SHALL BE CAPABLE FOR USE AS ISOLATION VALVE AND <br />RECOMMENDED BY THE MANUFACTURER FOR DEAD END SERVICE AT FULL RATED <br />PRESSURE WITHOUT THE NEED FOR DOWNSTREAM FLANGES; DUCTILE IRON BODY, <br />LUGGED TYPE, (LUG FOR EACH BOLT HOLE, DRILLED AND TAPPED FOR CAP <br />SCREWS), WITH REPLACEABLE REINFORCED RESILIENT EPT (EPDM) SEATS, <br />ALUMINUM -BRONZE OR NICKEL PLATED DUCTILE IRON DISCS; STAINLESS STEEL <br />STEMS AND SHALL NOT HAVE EXPOSED STEM -TO -DISC FASTENERS; RAISED NECKS <br />ABLE TO ACCOMMODATE 2 INCHES (51 MM) OF INSULATION. <br />PART 3 EXECUTION <br />3.1 VALVE APPLICATIONS <br />A. REFER TO PIPING SECTIONS FOR SPECIFIC VALVE APPLICATIONS. IF VALVE <br />APPLICATIONS ARE NOT INDICATED, USE THE FOLLOWING: <br />1. SHUTOFF SERVICE: BALL OR BUTTERFLY VALVES. <br />2. THROTTLING SERVICE: BALL OR BUTTERFLY VALVES. <br />SECTION 220529 - PLUMBING MANGERS AND SUPPORTS <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. PRODUCT DATA FOR SPECIFIED MATERIALS. <br />1.2 PERFORMANCE REQUIREMENTS <br />A. DESIGN SEISMIC -RESTRAINT HANGERS AND SUPPORTS FOR PIPING AND EQUIPMENT <br />AND OBTAIN APPROVAL FROM AUTHORITIES HAVING JURISDICTION. <br />PART 2 PRODUCTS <br />2.1 STEEL PIPE HANGERS AND SUPPORTS <br />A. MANUFACTURERS: CRANE, ERICO/MICHIGAN HANGER CO., FEE AND MASON, GRINNELL <br />CORP., TOLCO INC. <br />B. DESCRIPTION: MSS SP-58, TYPES 1 THROUGH 58, FACTORY -FABRICATED <br />COMPONENTS. <br />C. GALVANIZED, METALLIC COATINGS: PRE -GALVANIZED OR HOT DIPPED. <br />PART 3 EXECUTION <br />3.1 HANGER AND SUPPORT APPLICATIONS <br />A. GENERAL <br />1. COMPLY WITH MSSSP-69 FOR PIPE HANGER SELECTIONS AND APPLICATIONS. <br />3.2 HANGER AND SUPPORT INSTALLATION <br />A. STEEL PIPE HANGER INSTALLATION: COMPLY WITH MSSSP-69 AND MSSSP-89. <br />INSTALL HANGERS, SUPPORTS, CLAMPS AND ATTACHMENTS AS REQUIRED TO <br />PROPERLY SUPPORT PIPING FROM BUILDING STRUCTURE. <br />B. THERMAL -HANGER SHIELD INSTALLATION: INSTALL IN PIPE HANGER OR SHIELD FOR <br />INSULATED PIPING. <br />3.3 ADJUSTING <br />A. HANGER ADJUSTMENTS: ADJUST HANGERS TO DISTRIBUTE LOADS EQUALLY ON <br />ATTACHMENTS AND TO ACHIEVE INDICATED SLOPE OF PIPE. <br />SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. GENERAL <br />1. PRODUCT DATA FOR SPECIFIED MATERIALS. <br />1.2 QUALITY ASSURANCE <br />A. ASME COMPLIANCE: COMPLY WITH ASMEA13.1, "SCHEME FOR THE IDENTIFICATION OF <br />PIPING SYSTEMS," FOR LETTER SIZE, LENGTH OF COLOR FIELD, COLORS AND <br />VIEWING ANGLES OF IDENTIFICATION DEVICES FOR PIPING. <br />PART 2 PRODUCTS <br />2.1 PIPE MARKERS <br />A. GENERAL: PREPRINTED, COLOR -CODED, WITH LETTERING INDICATING SERVICE AND <br />SHOWING DIRECTION OF FLOW. <br />1. COLORS: COMPLY WITH ASME A13.1, UNLESS OTHERWISE INDICATED. <br />2. PIPES WITH OD, INCLUDING INSULATION, LESS THAN 6 INCHES: FULL -BAND PIPE <br />MARKERS EXTENDING 360 DEGREES AROUND PIPE AT EACH LOCATION. <br />3. ARROWS: INTEGRAL WITH PIPING SYSTEM SERVICE LETTERING TO ACCOMMODATE <br />BOTH DIRECTIONS OR AS SEPARATE UNIT ON EACH PIPE MARKER TO INDICATE <br />DIRECTION OF FLOW. <br />2.2 TAGS <br />A. STAMPED OR ENGRAVED WITH 1/4-INCH LETTERS FOR PIPING SYSTEM ABBREVIATION <br />AND 1/2 INCH NUMBERS. <br />PART 3 EXECUTION <br />3.1 GENERAL <br />A. PREPARATION <br />1. DEGREASE AND CLEAN SURFACES TO RECEIVE ADHESIVE FOR IDENTIFICATION <br />MATERIALS. <br />2. PROVIDE IDENTIFYING DEVICES AFTER COMPLETION OF COVERINGS AND PAINTING. <br />3.2 PIPE MARKERS <br />A. GENERAL: PREPRINTED, COLOR -CODED, WITH LETTERING INDICATING SERVICE, AND <br />SHOWING DIRECTION OF FLOW. <br />PART 1 GENERAL <br />1.1 QUALITY ASSURANCE <br />A. GENERAL <br />1. CONFORM TO MAXIMUM FLAME SPREAD/SMOKE DEVELOPED RATING OF 25/50 IN <br />ACCORDANCE WITH ASTM E84, NFPA 255, AND UL 723. <br />1.2 DELIVERY, STORAGE AND HANDLING <br />A. PACKAGING: INSULATION MATERIAL CONTAINERS SHALL BE MARKED BY <br />MANUFACTURER WITH APPROPRIATE ASTM STANDARD DESIGNATION, TYPE AND <br />GRADE AND MAXIMUM USE TEMPERATURE. <br />PART 2 PRODUCTS <br />2.1 GENERAL <br />A. PRODUCTS SHALL NOT CONTAIN ASBESTOS, LEAD, MERCURY, OR MERCURY <br />COMPOUNDS. <br />B. FOR INDOOR APPLICATIONS, USE ADHESIVES THAT HAVE A VOC CONTENT OF 50 <br />G/L OR LESS WHEN CALCULATED ACCORDING TO 40 DFR 59, SUBPART D (EPA <br />METHOD 24). <br />2.2 PIPE INSULATION <br />A. GLASS FIBER <br />1. MANUFACTURER <br />a. KNAUF, b. OWENS CORNING, c. SCHULLER, MICRO-LOK, AP-T PLUS. <br />2. INSULATION: ASTM C547; RIGID MOLDED; NONCOMBUSTIBLE; 'K' ('KSI') VALUE: <br />ASTM C177, 0.24 AT 75 DEG F; 850 DEG F MAXIMUM SERVICE TEMPERATURE; <br />0.2 PERCENT MAXIMUM MOISTURE ABSORPTION BY VOLUME. <br />3. VAPOR BARRIER JACKET: WHITE KRAFT PAPER WITH GLASS FIBER YARN; BONDED <br />TO ALUMINIZED FILM WITH PRESSURE SENSITIVE TAPE LAP SEALING SYSTEM; <br />MOISTURE VAPOR TRANSMISSION: ASTM E96; 0.02 PERM -INCHES. <br />4. ADHESIVES: COMPLY WITH MIL-A-3316C, CLASS 2, GRADE A. <br />2.3 JACKETS AND FITTING COVERS <br />A. PVC PLASTIC JACKET AND FITTING COVERS (INTERIOR APPLICATIONS): <br />1. MANUFACTURERS <br />a. ZESTON 2000 <br />2. JACKETS AND FITTING COVERS: ASTM D1784; ONE PIECE MOLDED TYPE FITTING <br />COVERS AND SHEET MATERIAL; OFF-WHITE COLOR; MINIMUM SERVICE <br />TEMPERATURE: 0 'F -18 'C; MAXIMUM SERVICE TEMPERATURE: 450 7 230' C; <br />THICKNESS: 20 MIL 0.50 MM. <br />3. JACKETS AND FITTING COVERS (VAPOR BARRIER JACKETS): ASTM D1784; ONE <br />PIECE MOLDED TYPE FITTING COVERS AND SHEET MATERIAL; OFF-WHITE COLOR; <br />MINIMUM SERVICE TEMPERATURE: 0 °F -18 'C; MAXIMUM SERVICE TEMPERATURE: <br />450 °F 230 'C; MOISTURE VAPOR TRANSMISSION - ASTM E96 - 0.002 <br />PERM -INCHES 0.0029NG/(SXMXPA); THICKNESS: 20 MIL 0.50 MM. <br />PART 3 EXECUTION <br />3.1 GENERAL <br />A. PREPARATION <br />1. SURFACE PREPARATION: CLEAN AND DRY SURFACES TO RECEIVE INSULATION. <br />REMOVE MATERIALS THAT WILL ADVERSELY AFFECT INSULATION APPLICATION. <br />B. INSTALLATION <br />1. INSTALL INSULATION MATERIALS, ACCESSORIES, AND FINISHES WITH SMOOTH, <br />STRAIGHT AND EVEN SURFACES; FREE OF VOIDS THROUGHOUT THE LENGTH OF <br />EQUIPMENT, DUCTS AND FITTINGS AND PIPING INCLUDING FITTINGS, VALVES AND <br />SPECIALTIES. <br />2. INSTALL INSULATION MATERIALS, FORMS, VAPOR BARRIERS OR RETARDERS, <br />JACKETS AND THICKNESS REQUIRED FOR EACH ITEM OF EQUIPMENT, DUCT <br />SYSTEM AND PIPE SYSTEM AS SPECIFIED. <br />3.2 PIPING INSULATION <br />A. GENERAL <br />1. INSULATION INSTALLATION ON STRAIGHT PIPES AND TUBES: <br />a. SECURE EACH LAYER OF INSULATION TO PIPE WITH WIRE OR BANDS AND <br />TIGHTEN BANDS WITHOUT DEFORMING INSULATION MATERIALS. <br />2. INSULATION INSTALLATION ON PIPE FITTINGS AND ELBOWS: <br />a. INSTALL PREFORMED SECTIONS OF SAME MATERIAL AS STRAIGHT SEGMENTS OF <br />PIPE INSULATION WHEN AVAILABLE. SECURE ACCORDING TO MANUFACTURER'S <br />WRITTEN INSTRUCTIONS. <br />3.3 JACKETS AND FITTING COVERS <br />A. PROVIDE PVC JACKETS FOR INTERIOR APPLICATIONS, AND ALUMINUM JACKETS FOR <br />EXTERIOR APPLICATIONS. <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. GENERAL <br />1. EQUIPMENT PRODUCT DATA: PROVIDE COMPONENT SIZES, ROUGH -IN <br />REQUIREMENTS, SERVICE SIZES AND FINISHES. <br />B. PIPE PRODUCT DATA <br />1. PROVIDE DATA ON PIPE MATERIALS, PIPE FITTINGS, VALVES AND ACCESSORIES. <br />1.2 OPERATION AND MAINTENANCE MATERIALS <br />A. GENERAL <br />1. INCLUDE CERTIFICATES FOR ALL REQUIRED PIPING SYSTEM TESTS AND <br />INSPECTIONS. <br />1.3 DELIVERY, STORAGE AND HANDLING <br />A. ACCEPT VALVES ON SITE IN SHIPPING CONTAINERS WITH LABELING IN PLACE. <br />INSPECT FOR DAMAGE. <br />PART 2 PRODUCTS <br />2.1 PIPING <br />A. WATER PIPING, ABOVE GRADE <br />1. COPPER TUBING: ASTM B88, TYPE L, HARD DRAWN; ASME B16.22 <br />WROUGHT COPPER AND BRONZE FITTINGS; ASTM B32 FITTINGS, SOLDER, <br />GRADE 95TA. <br />2.2 FLANGES, UNIONS, AND COUPLINGS <br />A. PIPE SIZE 2 INCHES AND UNDER <br />1. COPPER TUBE AND PIPE: CLASS 150 BRONZE UNIONS WITH SOLDERED <br />JOINTS. <br />2.3 RO AND DI WATER SYSTEMS <br />A. FOR RO AND DI WATER SYSTEMS, US POLYPROPYLENE (PP) TUBING WITH S <br />SOCKET WELDS. <br />B. BALL VALVES MADE FROM ASTM D4101 RESIN. <br />1. BALL VALVES, NPS2 "AND SMALLER; MSS SP-122, UNION TYPE WITH <br />SOCKET ENDS AND PRESSURE RATING OF NOT LESS THAN 150 PSIG AT <br />73 DEGREES F. <br />PART 3 EXECUTION <br />3.1 GENERAL <br />A. INSTALL DOMESTIC WATER PIPING LEVEL AND PLUMB. <br />3.2 PIPING <br />A. WATER SERVICE <br />1. CONNECT DOMESTIC WATER PIPING TO EXTERIOR WATER -SERVICE PIPING. <br />USE DIELECTRIC FITTING TO JOIN DISSIMILAR PIPING MATERIALS. <br />GENERAL PIPING VALVE APPLICATIONS <br />1. PROVIDE SHUTOFF VALVE CLOSE TO WATER MAIN ON EACH BRANCH AND <br />RISER SERVING PLUMBING FIXTURES OR EQUIPMENT, ON EACH WATER <br />SUPPLY TO EQUIPMENT AND ON EACH WATER SUPPLY TO PLUMBING <br />FIXTURES THAT DO NOT HAVE SUPPLY STOPS. <br />3.3 TRAP PRIMERS <br />A. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS, AND WHERE INDICATED ON <br />DRAWINGS. <br />3.4 WATER HAMMER ARRESTERS <br />A. INSTALL IN WATER PIPING ACCORDING TO PDI-WH 2O1. <br />B. AT A MINIMUM, PROVIDE IN ALL BRANCH LINES SERVING FLUSH VALVE <br />WATER CLOSETS, PRESSURE -ASSISTED FLUSH TANK WATER CLOSETS, FLUSH <br />VALVE URINALS, LAVATORIES AND SHOWERS. REFER TO PDI-WH 201 FOR <br />ADDITIONAL LOCATION REQUIREMENTS. <br />3.5 HANGER AND SUPPORT INSTALLATION <br />A. SUPPLEMENTAL APPLICATION INFORMATION <br />1, VERTICAL PIPING: <br />a. MSS TYPE 8 OR TYPE 42 CLAMPS. <br />b. MSS TYPE 52, SPRING HANGERS, AT BASE. <br />2. HORIZONTAL PIPING: <br />a. 100 FEET AND SHORTER: HANGERS FOR STATIONARY PIPING MAY BE USED. <br />b. LONGER THAN 100 FEET: HANGERS FOR SUPPORT OF PIPING SUBJECT TO <br />LONGITUDINAL MOVEMENT DUE TO EXPANSION AND CONTRACTION SHALL BE <br />USED. <br />3.6 CLEANING <br />A. PURGE NEW PIPING AND PARTS OF EXISTING DOMESTIC WATER PIPING THAT <br />HAVE BEEN ALTERED, EXTENDED OR REPAIRED BEFORE USING. <br />B. USE PURGING AND DISINFECTING PROCEDURES PRESCRIBED BY AUTHORITIES <br />HAVING JURISDICTION OR IF METHODS ARE NOT PRESCRIBED, PROCEDURES <br />DESCRIBED IN EITHER AWWAC651 OR AWWA C652. <br />SECTION 221300 - SANITARY WASTE AND VENT PIPING SYSTEMS <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. GENERAL <br />1. EQUIPMENT PRODUCT DATA: PROVIDE COMPONENT SIZES, <br />ROUGH -IN -REQUIREMENTS, SERVICE SIZES AND FINISHES. <br />1.2 OPERATION AND MAINTENANCE MATERIALS <br />A. GENERAL <br />1. INCLUDE CERTIFICATES FOR ALL REQUIRED PIPING SYSTEM TESTS AND <br />INSPECTIONS. <br />1.3 DELIVERY, STORAGE AND HANDLING <br />A. PROVIDE TEMPORARY END CAPS AND CLOSURES ON PIPING AND FITTINGS. <br />MAINTAIN IN PLACE UNTIL INSTALLATION. <br />PART 2 PRODUCTS <br />2.1 PIPING <br />A. WASTE AND VENT PIPING (UNPRESSURLZED), ABOVE GRADE <br />1. CAST IRON (HUBLESS): ASTM A 888/CLSPI 301 SERVICE WEIGHT. <br />a. FITTINGS: CAST IRON TO MATCH PIPING. <br />b. JOINTS: ASTM C 1277 HEAVY DUTY SHIELDED COUPLINGS WITH STAINLESS <br />STEEL SHIELD, BANDS AND TIGHTENING DEVICES; ASTM C 564 RUBBER <br />SLEEVE. <br />2.2 CLEANOUTS <br />A. MANUFACTURERS: J.R. SMITH, JOSAM, WADE, ZURN. <br />B. GENERAL: BODY MATERIAL AS REQUIRED TO MATCH CONNECTED PIPING; <br />FULL SIZE TO 4 INCHES; NOT LESS THAN 4 INCHES <br />,.... LARGER <br />BRONZEEXTENSIONS WITH FLUSH FRAMES AND BRASS REMOVABLE COVER PLATE <br />C. FLOOR CLEANOUTS: COATED CAST IRON BODY; SCORIATED HEAVY DUTY <br />NICKEL re FULLY ADJUSTABLE j SECURED TO BODY; <br />SEALED IRON CLOSURE PLUG. <br />v <br />2727 sakes we. <br />sull:e 10i2 <br />Ever +i .)(9_'J1 <br />RE V �Sa JC)ME-', <br />(I s-tanteec <br />4100 194th Street SW Suite 400 <br />Lynnwood Washington 98036-4613 <br />(206( 667-0555 <br />Copyright Reserved <br />The Contractor shall verify and be responsible for all dimensions. DO <br />NOT scale the drawing -any errors or omissions shall be reported to <br />Stantec without delay. <br />The Copyrights to all designs and drawings are the property of <br />Stantec. Reproduction or use for any purpose other than that <br />authorized by Stantec is forbidden. <br />®y WASkly <br />C <br />LU-, <br />C <br />0 <br />4- <br />4- <br />-, <br />w <br />4M <br />�v <br />JOB. 1\10. 19-1, 1 7 <br />DR�,V,N BY � YB M <br />C FCKED BY FJ <br />fly' E Ire lI R C,;III, T I 0 �rkl S <br />