SEOTI®N 221300 o SANITARY WASTE AND VENT PIPING SYSTEMS CONTINUED
<br />PART 1 PRODUCTS CONTINUED
<br />D. WALL CLEANOUTS: COATED CAST IRON CLEANOUT TEE; GASKET SEALED IRON PLUG;
<br />SHALLOW TYPE; ROUND, STAINLESS STEEL WALL COVER WITH CENTER VANDAL -PROOF
<br />SCREW.
<br />1.1 FLOOR DRAINS
<br />A. MANUFACTURERS: J.R. SMITH, JOSAM, WADE, ZURN.
<br />B. ASMEA112.6.3; CAST IRON BODY; DOUBLE DRAINAGE FLANGE; WEEP HOLES;
<br />REVERSIBLE CLAMPING COLLAR.
<br />1.2 MISCELLANEOUS DRAINAGE PIPING SPECIALTIES
<br />A. DEEP -SEAL TRAPS: CAST-IRON OR BRONZE CASTING, WITH INLET AND OUTLET
<br />MATCHING CONNECTED PIPING AND CLEANOUT TRAP -SEAL PRIMER VALVE CONNECTION,
<br />SAME SIZE AS CONNECTED WASTE PIPING.
<br />B. FLOOR -DRAIN, TRAP -SEAL PRIMER FITTINGS: CAST IRON, WITH THREADED INLET AND
<br />THREADED OR SPIGOT OUTLET, AND TRAP -SEAL PRIMER VALVE CONNECTION. SAME
<br />SIZE AS FLOOR DRAIN OUTLET WITH NPS 1/2 (DN 15) SIDE INLET.
<br />C. AIR -CAP FITTINGS: ASMEA112.1.2, FOR FITTING DESIGNED TO ENSURE FIXED, POSITIVE
<br />AIR GAP BETWEEN INSTALLED INLET AND OUTLET PIPING; BRONZE OR CAST IRON BODY;
<br />INLET IN TOP OF BODY; OUTLET LARGER THAN INLET. SAME SIZE AS CONNECTED
<br />WASTE PIPING AND WITH INLET LARGE ENOUGH FOR ASSOCIATED INDIRECT WASTE
<br />PIPING.
<br />PART 2 EXECUTION
<br />2.1 PIPING
<br />A. MAKE CHANGES IN DIRECTION FOR SOIL AND WASTE DRAINAGE AND VENT PIPING USING
<br />APPROPRIATE BRANCHES, BENDS, AND LONG -SWEEP BENDS. SANITARY TEES AND
<br />SHORT -SWEEP 1/4 BENDS MAY BE USED ON VERTICAL STACKS IF CHANGE IN
<br />DIRECTION OF FLOW IS FROM HORIZONTAL TO VERTICAL, USE LONG -TURN, DOUBLE
<br />Y-BRANCH AND 1/8-BEND FITTINGS IF 2 FIXTURES ARE INSTALLED BACK TO BACK OR
<br />SIDE BY SIDE WITH COMMON DRAIN PIPE. STRAIGHT TEES, ELBOWS, AND CROSSES
<br />MAY BE USED ON VENT LINES. DO NOT CHANGE DIRECTION OF FLOW MORE THAN 90
<br />DEGREES. USE PROPER SIZE OF STANDARD INCREASERS AND REDUCERS IF PIPES OF
<br />DIFFERENT SIZES ARE CONNECTED. REDUCING SIZE OF DRAINAGE PIPING IN DIRECTION
<br />OF FLOW IS PROHIBITED.
<br />B. INSTALL SOIL AND WASTE DRAINAGE AND VENT PIPING AT THE FOLLOWING MINIMUM
<br />SLOPES, UNLESS OTHERWISE INDICATED:
<br />1. HORIZONTAL SANITARY DRAINAGE PIPING: 2 PERCENT DOWNWARD IN DIRECTION OF
<br />FLOW.
<br />a. FOR PIPING NPS 4 AND LARGER, 1 PERCENT SLOPE CAN BE UTILIZED WHEN
<br />APPROVED BY THE AUTHORITIES HAVING JURISDICTION AND THE ENGINEER.
<br />2. VENT PIPING: 1 PERCENT DOWN TOWARD VERTICAL FIXTURE VENT OR TOWARD VENT
<br />STACK.
<br />C. INSTALL ESCUTCHEONS AT WALL, FLOOR, AND CEILING PENETRATIONS IN EXPOSED
<br />FINISHED LOCATIONS AND WITHIN CABINETS AND MILLWORK. USE DEEP -PATTERN
<br />ESCUTCHEONS IF REQUIRED TO CONCEAL PROTRUDING PIPE AND FITTINGS.
<br />D. CAST IRON PIPING
<br />1. INSTALL CAST-IRON SOIL PIPING ACCORDING TO CISPI`S "CAST IRON SOIL PIPE AND
<br />FITTINGS HANDBOOK," CHAPTER IV, "INSTALLATION OF CAST IRON SOIL PIPE AND
<br />FITTINGS."
<br />2. SLEEVES ARE NOT REQUIRED FOR CAST-IRON SOIL PIPING PASSING THROUGH
<br />CONCRETE SLABS -ON -GRADE IF SLAB IS WITHOUT MEMBRANE WATERPROOFING.
<br />2.2 CLEANOUTS
<br />A. INSTALL CLEANOUTS AT GRADE AND EXTEND TO WHERE BUILDING SANITARY DRAINS
<br />CONNECT TO BUILDING SANITARY SEWERS.
<br />B. INSTALL CLEANOUTS IN ABOVE GROUND PIPING AND BUILDING DRAIN PIPING ACCORDING
<br />TO THE FOLLOWING, UNLESS OTHERWISE INDICATED:
<br />1. SIZE SAME AS DRAINAGE PIPING UP TO NPS 4. USE NPS 4 FOR LARGER DRAINAGE
<br />PIPING UNLESS LARGER CLEANOUT IS INDICATED.
<br />2. LOCATE AT EACH CHANGE IN DIRECTION OF PIPING GREATER, THAN 45 DEGREES.
<br />3. LOCATE AT MINIMUM INTERVALS OF 50 FEET FOR PIPING NPS 4 AND SMALLER AND
<br />100 FEET FOR LARGER PIPING.
<br />4. LOCATE AT BASE OF EACH VERTICAL SOIL AND WASTE STACK.
<br />2.3 FLOOR DRAINS
<br />A. INSTALL FLOOR DRAINS AT LOW POINTS OF SURFACE AREAS TO BE DRAINED. SET
<br />GRATES OF DRAINS FLUSH WITH FINISHED FLOOR, UNLESS OTHERWISE INDICATED.
<br />ROOF FLASHING ASSEMBLIES
<br />B. INSTALL. ROOF FLASHING ASSEMBLIES ON SANITARY STACK VENTS AND VENT STACKS
<br />THAT EXTEND THROUGH ROOF.
<br />2.4 MISCELLANEOUS DRAINAGE PIPING SPECIALTIES
<br />A. FLOOR -DRAIN, TRAP -SEAL PRIMER FITTINGS: INSTALL FLOOR -DRAIN, TRAP -SEAL
<br />PRIMER FITTINGS ON INLET TO FLOOR DRAINS THAT REQUIRE TRAP -SEAL PRIMER
<br />CONNECTION.
<br />B. AIR -GAP FITTINGS: INSTALL AIR -GAP FITTINGS ON DRAINING -TYPE BACKFLOW
<br />PREVENTERS AND ON INDIRECT -WASTE PIPING DISCHARGE INTO SANITARY DRAINAGE
<br />SYSTEM.
<br />C. SLEEVE FLASHING DEVICE: INSTALL SLEEVE FLASHING DEVICE WITH EACH RISER AND
<br />STACK PASSING THROUGH FLOORS WITH WATERPROOF MEMBRANE.
<br />2.5 TESTING
<br />A. TEST SANITARY DRAINAGE AND VENT PIPING ACCORDING TO PROCEDURES OF
<br />AUTHORITIES HAVING JURISDICTION.
<br />SECTION 224000 - PLUMBING FIXTURES
<br />PART 1 GENERAL
<br />1.1 SUBMITTALS
<br />A. GENERAL
<br />1. PRODUCT DATA: FOR EACH TYPE OF PLUMBING FIXTURE INDICATED. INCLUDE
<br />SELECTED FIXTURE AND TRIM, FITTINGS, ACCESSORIES, APPLIANCES,
<br />APPURTENANCES, EQUIPMENT AND SUPPORTS. INDICATE MATERIALS AND FINISHES,
<br />DIMENSIONS, CONSTRUCTION DETAILS AND FLOW -CONTROL RATES.
<br />B. OPERATION AND MAINTENANCE DATA: FOR PLUMBING FIXTURES TO INCLUDE IN
<br />EMERGENCY, OPERATION, AND MAINTENANCE MANUALS.
<br />1.2 QUALITY ASSURANCE
<br />A. COMPLY WITH THE FOLLOWING APPLICABLE STANDARDS AND OTHER REQUIREMENTS
<br />SPECIFIED FOR PLUMBING FIXTURES:
<br />1. ENAMELED, CAST-IRON FIXTURES: ASME A112.19.1 M.
<br />2. PORCELAIN -ENAMELED, FORMED -STEEL FIXTURES: ASMEA112.19.4M.
<br />3. SOLID -SURFACE -MATERIAL LAVATORIES AND SINKS: ANSI/ICPA SS-1.
<br />4. STAINLESS -STEEL COMMERCIAL, HANDWASH SINKS: NSF 2 CONSTRUCTION.
<br />5. VITREOUS -CHINA FIXTURES: ASME Al 12.19.2M.
<br />6. WATER -CLOSET, FLUSH VALVE, TANK TRIM: ASME A112.19.5.
<br />B. COMPLY WITH THE FOLLOWING APPLICABLE STANDARDS AND OTHER
<br />REQUIREMENTS SPECIFIED FOR LAVATORY AND SINK FAUCETS:
<br />1. FAUCETS: ASME A112.18.1.
<br />2. HOSE -CONNECTION VACUUM BREAKERS: ASSE 1011.
<br />3. HOSE -COUPLING THREADS: ASME B1.20.7.
<br />4. INTEGRAL, ATMOSPHERIC VACUUM BREAKERS: ASSE 1001.
<br />5. NSF POTABLE -WATER MATERIALS: NSF 61.
<br />6. PIPE THREADS: ASME B1.20.1.
<br />7. SUPPLY FITTINGS: ASME A112.18.1.
<br />8. BRASS WASTE FITTINGS: ASME Al 12.18.2.
<br />PART 2 PRODUCTS
<br />2.1 GENERAL FIXTURES
<br />A. MANUFACTURERS
<br />1. VITREOUS CHINA FIXTURES: AMERICAN STANDARD, ELJIER, KOHLER -
<br />COMMERCIAL.
<br />2. STAINLESS STEEL SINKS: ELKAY, JUST, FRANKE.
<br />3. FAUCETS: CHICAGO, SYMMONS, T & S.
<br />4. FLUSH VALVES: SLOAN.
<br />5. SUPPLIES: BRASS CRAFT, CHICAGO, DEARBORN BRASS.
<br />6. SEATS: BEMMS, BENEKE, CHURCH, OLSONITE.
<br />7. CARRIERS: J.R. SMITH, JOSAM, ZURN.
<br />B. COUNTER -MOUNTED LAVATORIES (VITREOUS CHINA)
<br />1. LAVATORY: ANSI Al12.19.2; VITREOUS CHINA SELF -RIMMING COUNTER TOP
<br />LAVATORY; DRILLINGS ON 4 INCH OR 8 INCH CENTERS AS SCHEDULED ON
<br />DRAWINGS; FRONT OVERFLOW; SOAP DEPRESSION; SEAL OF PUTTY, CAULKING OR
<br />CONCEALED VINYL GASKET.
<br />PART 3 EXECUTION
<br />3.1 I N STALLATIO N
<br />C. ASSEMBLE PLUMBING FIXTURES, TRIM, FITTINGS AND OTHER COMPONENTS ACCORDING
<br />TO MANUFACTURERS' WRITTEN INSTRUCTIONS.
<br />3.2 CONNECTIONS
<br />A. CONNECT FIXTURES WITH WATER SUPPLIES, STOPS, AND RISERS, AND WITH TRAPS,
<br />SOIL, WASTE, AND VENT PIPING. USE SIZE FITTINGS REQUIRED TO MATCH FIXTURES.
<br />3.3 CLEANING
<br />A. CLEAN FIXTURES, FAUCETS, AND OTHER FITTINGS WITH MANUFACTURERS'
<br />RECOMMENDED CLEANING METHODS AND MATERIALS.
<br />SECTION 226313 - GAS PIPING FOR HEALTHCARE FACILITIES
<br />PART 1 GENERAL
<br />1.1 SUMMARY
<br />A. THIS SECTION INCLUDES THE FOLLOWING:
<br />1. OXYGEN PIPING AND SPECIALTIES DESIGNED "MEDDICAL OXYGEN" OPERATING AT
<br />50 TO 55 PSIG.
<br />2. HEALTHCARE VACUUM PIPING AND SPECIALTIES, DESIGNATED MEDICAL VACUUM.
<br />3. MEDICAL AIR PIPING AND SPECIALTIES, DESIGNATED MEDICAL AIR.
<br />PART 2 PRODUCTS
<br />2.1 PIPES, TUBES AND FITTINGS
<br />A. COPPER MEDICAL GAS TUBE: ASTM B 819, TYPES K AND L, SEAMLESS, DRAWN
<br />TEMPER THAT HAS BEEN MANUFACTURED CLEANED, PURGED AND SEALED FOR
<br />MEDICAL GAS SERVICE OR ACCORDING TO CGA G-4.1 FOR OXYGEN SERVICE.
<br />INCLUDE STANDARD COLOR MARKING "OXY', "MET, "OXY/MED" "OXY/ACR" OR
<br />"ACR/MED" IN GREEN FOR TYPE K TUBE AND BLUE FOR TYPE L TUBE.
<br />SECTION 230000 m GENERAL HVAC REQUIREMENTS
<br />PART 1 GENERAL
<br />1.1 SCOPE OF WORK
<br />A. INCLUDE COMPLETE AND FUNCTIONAL MECHANICAL SYSTEMS - INCLUDING ALL
<br />REQUIRED MATERIALS, LABOR, EQUIPMENT AND SERVICES NECESSARY TO ACHIEVE
<br />THE DESIRED FINAL PRODUCT.
<br />1.2 APPLICABLE CODES
<br />A. WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES AND
<br />STANDARDS AS ADOPTED BY THE AUTHORITIES HAVING JURISDICTION INCLUDING
<br />AMENDMENTS. FOLLOWING IS A LISTING OF MAJOR CODES AND STANDARDS, THE
<br />REQUIREMENTS OF WHICH SHALL BE CONSIDERED PART OF THE SCOPE OF THIS
<br />PROJECT. THIS LIST SHOULD NOT BE CONSIDERED COMPREHENSIVE AND CODES OR
<br />STANDARDS NOT INCLUDED IN THIS LIST SHOULD NOT BE CONSIDERED TO BE
<br />EXCLUDED FROM THE SCOPE OF THE PROJECT.
<br />1. AMERICANS WITH DISABILITIES ACT ADA).
<br />2. APPLICABLE STATE AND LOCAL CODES AND ORDINANCES.
<br />3. NATIONAL ELECTRICAL CODE.
<br />4. INTERNATIONAL BUILDING CODE.
<br />5. INTERNATIONAL FIRE CODE.
<br />6. INTERNATIONAL MECHANICAL CODE.
<br />7. UNIFORM PLUMBING CODE.
<br />8. WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE.
<br />9. WASHINGTON STATE INDOOR AIR QUALITY CODE.
<br />10. WASHINGTON STATE BOILER AND UNFIRED PRESSURE VESSEL CODE.
<br />1.3 PERMITS AND FEES
<br />A. ALL PERMITS AND INSPECTIONS REQUIRED TO COMPLETE SCOPE OF WORK SHALL BE
<br />INCLUDED IN THE BID PRICE.
<br />B. ALL FEES REQUIRED BY UTILITY PROVIDERS SHALL BE INCLUDED IN THE DIVISION 23
<br />BID PRICE.
<br />1.4 SCOPE AND APPROPRIATE USE OF BID DOCUMENTS
<br />A. THESE SPECIFICATIONS AND ACCOMPANYING DRAWINGS ARE INTENDED TO
<br />COMMUNICATE THE DESIGN CONCEPT FOR THIS PROJECT AND OUTLINE THE SCOPE
<br />OF WORK. WORK NOT SPECIFICALLY NOTED IN THESE SPECIFICATIONS OR THE
<br />ACCOMPANYING DRAWINGS, BUT WHICH IS REQUIRED TO COMPLETE THE PROJECT,
<br />SHALL BE INCLUDED AS PART OF CONTRACTOR'S SCOPE.
<br />B. THESE SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS ARE INTENDED TO
<br />SUPPLEMENT EACH OTHER. INFORMATION INCLUDED IN EITHER ONE SHALL BE
<br />INCORPORATED INTO THE PROJECT AS IF INCLUDED IN BOTH. IN THE EVENT OF
<br />ANY CONFLICTS, THE MOST STRINGENT REQUIREMENTS SHALL BE CONSIDERED THE
<br />GOVERNING SCOPE OF WORK UNTIL AND UNLESS CLARIFICATION CAN BE OBTAINED
<br />BY THE CONTRACTOR.
<br />C. DRAWINGS ARE INTENDED TO INDICATE THE GENERAL ARRANGEMENT OF PIPING,
<br />DUCTWORK, EQUIPMENT AND OTHER COMPONENTS OF SYSTEMS. THEY SHALL BE
<br />FOLLOWED AS CLOSELY AS POSSIBLE, BUT SHALL BE CONSIDERED DIAGRAMMATIC IN
<br />NATURE. THEY ARE NOT INTENDED TO SHOW EVERY COMPONENT, FITTING, OFFSET,
<br />ETC. COMPONENTS, FITTINGS, OFFSETS, ETC. AS REQUIRED TO MEET THE INTENT OF
<br />THE DOCUMENTS AND TO ACHIEVE COORDINATION WITH OTHER TRADES SHALL BE
<br />INCLUDED IN THE DIVISION 23 SCOPE OF WORK.
<br />1.5 ROUTING AND LOCATIONS
<br />A. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE EQUIPMENT LOCATIONS
<br />AND SYSTEM ROUTING WITH AVAILABLE SPACE AND WITH ALL OTHER TRADES,
<br />1.6 SCHEDULING
<br />A. IT IS UNDERSTOOD THAT WHILE DRAWINGS ARE TO BE FOLLOWED AS CLOSELY AS
<br />CIRCUMSTANCES PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />INSTALLATION OF SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF
<br />CONTRACT DOCUMENTS. ANYTHING NOT CLEAR OR IN CONFLICT WILL BE
<br />EXPLAINED BY MAKING APPLICATION TO OWNER'S REPRESENTATIVE. THE
<br />CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH HIS SCOPE OF WORK AS WELL AS
<br />THE REQUIRED COORDINATION WITH OTHER TRADES AND THE SCHEDULING OF
<br />OTHER TRADES SUFFICIENTLY TO ADDRESS COORDINATION ISSUES IN A TIMELY
<br />MANNER SUCH THAT THEY DO NOT RESULT IN REMEDIAL WORK FOR OTHER
<br />TRADES.
<br />B. THE CONTRACTOR SHALL COORDINATE WITH THE WORK OF VARIOUS TRADES WHEN
<br />INSTALLING INTERRELATED WORK. BEFORE INSTALLATION OF MECHANICAL ITEMS,
<br />PROPER PROVISIONS SHALL BE MADE TO AVOID INTERFERENCES. CHANGES
<br />REQUIRED IN WORK SPECIFIED IN DIVISION 23 CAUSED BY NEGLECT TO DO SO
<br />SHALL BE MADE AT NO COST TO OWNER.
<br />1.7 CUTTING AND PATCHING
<br />A. THE DIVISION 23 CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
<br />PATCHING REQUIRED TO COMPLETE THE DIVISION 23 SCOPE OF WORK.
<br />1.8 GUARANTEE
<br />A. ALL DIVISION 23 SYSTEMS AND EQUIPMENT SHALL BE GUARANTEED FOR A
<br />MINIMUM PERIOD OF ONE YEAR.
<br />B. THE GUARANTEE SHALL BEGIN AT THE DATE OF ACCEPTANCE, UNLESS WRITTEN
<br />DOCUMENTATION IS PROVIDED NOTING OTHERWISE.
<br />1.9 QUALITY ASSURANCE
<br />A. MATERIAL AND EQUIPMENT QUALIFICATIONS
<br />1. PROVIDE MATERIALS AND EQUIPMENT THAT ARE STANDARD PRODUCTS OF
<br />MANUFACTURERS REGULARLY ENGAGED IN THE MANUFACTURE OF SUCH
<br />PRODUCTS, WHICH ARE OF A SIMILAR MATERIAL, DESIGN AND WORKMANSHIP.
<br />STANDARD PRODUCTS SHALL HAVE BEEN IN SATISFACTORY COMMERCIAL OR
<br />INDUSTRIAL USE FOR 2 YEARS PRIOR TO BID OPENING. THE 2-YEAR USE
<br />SHALL INCLUDE APPLICATIONS OF EQUIPMENT AND MATERIALS UNDER SIMILAR
<br />CIRCUMSTANCES AND OF SIMILAR SIZE. THE PRODUCT SHALL HAVE BEEN
<br />FOR SALE ON THE COMMERCIAL MARKET THROUGH. ADVERTISEMENTS,
<br />MANUFACTURERS' CATALOGS OR BROCHURES DURING THE 2 YEAR PERIOD.
<br />B. SERVICE SUPPORT: THE EQUIPMENT ITEMS SHALL BE SUPPORTED BY SERVICE
<br />ORGANIZATIONS. WHEN REQUESTED TO GAIN APPROVAL, SUBMIT A CERTIFIED LIST
<br />OF QUALIFIED PERMANENT SERVICE ORGANIZATIONS FOR SUPPORT OF THE
<br />EQUIPMENT WHICH INCLUDES THEIR ADDRESSES AND QUALIFICATIONS.
<br />C. UL LISTINGS: ALL EQUIPMENT SHALL BE PROVIDED WITH A UL OR APPROVED
<br />EQUIVALENT LABEL WHEN LABELING IS AVAILABLE FOR THAT TYPE OF EQUIPMENT.
<br />D. ALL CONTROL PANELS SHALL BE UL LISTED (OR EQUIVALENT APPROVED LABEL).
<br />E. PRESSURE VESSELS SHALL BE PROVIDED IN ACCORDANCE WITH APPLICABLE
<br />PRESSURE VESSEL ORDINANCES.
<br />F. ALL MECHANICAL EQUIPMENT SHALL HAVE AN AIC RATING OF 100,000 OR
<br />OTHERWISE SPECIFIED ON ELECTRICAL ONE -LINE DIAGRAMS FAULT CURRENT FOR
<br />EACH PIECE OF EQUIPMENT.
<br />1.10 SUBSTITUTIONS
<br />A. WHEN MULTIPLE MANUFACTURERS ARE LISTED IN THESE SPECIFICATIONS,
<br />EQUIPMENT CAN BE USED FROM THOSE MANUFACTURERS PROVIDING THEY CAN
<br />MEET THE REQUIREMENTS OF THE SPECIFICATIONS AND DRAWINGS. THIS SHALL
<br />INCLUDE MEETING CAPACITY REQUIREMENTS, EFFICIENCIES, SPACE AND WEIGHT
<br />LIMITATIONS, ELECTRICAL PROVISIONS, ETC. THE DETAILED INFORMATION IN THE
<br />SPECIFICATIONS, SCHEDULED EQUIPMENT INFORMATION, ADDITIONAL DRAWING
<br />INFORMATION AND ANY SPECIFIC REFERENCES TO A PARTICULAR MANUFACTURER
<br />AND/OR MODEL OF EQUIPMENT SHALL BE CONSIDERED THE BASIS OF DESIGN.
<br />OTHER LISTED MANUFACTURERS, EVEN WHEN LISTED IN THESE SPECIFICATIONS,
<br />WILL ONLY BE ALLOWED IF THEY MEET OR EXCEED THAT BASIS OF DESIGN.
<br />B. IT IS THE CONTRACTOR'S RESPONSIBILITY WHEN UTILIZING APPROVED SUBSTITUTED
<br />EQUIPMENT TO ENSURE THE EQUIPMENT WILL FIT WITHIN THE CONSTRAINTS OF
<br />THE PROJECT AS DETAILED USING THE BASIS OF DESIGN EQUIPMENT (SPACE,
<br />WEIGHT, POWER, ETC.). ANY REQUIRED ALTERATIONS BY DIVISION 23 OR ANY
<br />OTHER DIVISION OF WORK TO ACCOMMODATE DIFFERENCES BETWEEN THE
<br />SUBSTITUTED EQUIPMENT AND THE BASIS OF DESIGN EQUIPMENT SHALL BE THE
<br />RESPONSIBILITY OF THE DIVISION 23 CONTRACTOR, INCLUDING THE COST OF
<br />DESIGN FOR THE REQUIRED CHANGES.
<br />1.11 SUBMITTALS
<br />A. SUBMITTAL INFORMATION SHALL BE PROVIDED AND APPROVED ON ALL MATERIALS
<br />AND EQUIPMENT PRIOR TO ORDERING.
<br />B. PROVIDE INDICATION OF WHICH OPTIONS AND ACCESSORIES ARE TO BE INCLUDED.
<br />C. INCLUDE ALL SCHEDULED INFORMATION FOR EQUIPMENT
<br />Q ENT LISTED IN SCHEDULES ON
<br />THE DRAWINGS.
<br />D. REVIEW WILL BE FOR GENERAL CONFORMANCE ONLY, AND SHALL NOT RELIEVE
<br />THE CONTRACTOR FOR ANY DEVIATIONS FROM THE REQUIREMENTS OF THE
<br />DOCUMENTS UNLESS CLEAR WRITTEN REFERENCE IS MADE BY THE CONTRACTOR
<br />IN THE SUBMITTAL TO PROPOSED DEVIATIONS.
<br />1.12 DELIVERY, STORAGE AND HANDLING
<br />A. FOLLOW MANUFACTURER'S DIRECTIONS IN DELIVERY, STORAGE, PROTECTION AND
<br />INSTALLATION OF EQUIPMENT AND MATERIALS.
<br />B. HANDLE, STORE AND PROTECT EQUIPMENT AND MATERIALS TO PREVENT DAMAGE
<br />BEFORE AND DURING INSTALLATION IN ACCORDANCE WITH THE MANUFACTURER'S
<br />RECOMMENDATIONS AND AS APPROVED BY THE CONTRACTING OFFICER. REPLACE
<br />DAMAGED OR DEFECTIVE ITEMS.
<br />C. STORE DUCTWORK IN A CLEAN, DRY LOCATION. IF THE LOCATION OF STORAGE
<br />CANNOT BE PROTECTED FROM MOISTURE, KEEP DUCTWORK ABOVE GRADE LEVEL
<br />TO PROTECT FROM STANDING WATER.
<br />1.13 OPERATION AND MAINTENANCE MANUALS
<br />A. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED IN THREE POST
<br />BINDERS CAPABLE OF HAVING MATERIALS ADDED OR REMOVED, STANDARD
<br />CLASP -TYPE BINDERS ARE NOT ACCEPTABLE. BINDERS WITH OVERLAPPING,
<br />TELESCOPING POSTS SHALL BE USED.
<br />SECTION 230500 - BASIC &fi/AC MATERIALS AND METHODS
<br />PART 1 GENERAL
<br />1.1 SUBMITTALS
<br />A. GENERAL
<br />1. PRODUCT DATA FOR SPECIFIED MATERIALS.
<br />2. WELDING CERTIFICATES
<br />1.2 DELIVERY, STORAGE AND HANDLING
<br />A. DELIVER PIPES AND TUBES WITH FACTORY -APPLIED END CAPS. MAINTAIN END
<br />CAPS THROUGH SHIPPING, STORAGE AND HANDLING TO PREVENT PIPE END
<br />DAMAGE AND TO PREVENT ENTRANCE OF DIRT, DEBRIS AND MOISTURE.
<br />PART 2 PRODUCTS
<br />2.1 ACCESS DOORS
<br />A. ACCESS DOORS SHALL BE PROVIDED BY DIVISION 23 WHEN SERVING DIVISION 23
<br />SYSTEMS AND EQUIPMENT IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION
<br />08.
<br />2.2 DIELECTRIC FITTINGS
<br />DESCRIPTION: COMBINATION FITTING OF COPPER ALLOY AND FERROUS MATERIALS
<br />WITH THREADED, SOLDER -JOINT, PLAIN OR WELD -NECK END CONNECTIONS THAT
<br />MATCH PIPING SYSTEM MATERIALS.
<br />2.3 ESCUTCHEONS
<br />A. DESCRIPTION: CHROME PLATED STEEL MANUFACTURED WALL AND CEILING
<br />ESCUTCHEONS AND FLOOR PLATES, WITH AN INSIDE DIAMETER TO CLOSELY FIT
<br />AROUND PIPE, TUBE AND INSULATION OF INSULATED PIPING AND AN OUTSIDE
<br />DIAMETER THAT COMPLETELY COVERS OPENING.
<br />2.4 JOINING MATERIALS
<br />A. SOLDER FILLER METALS: ASTM B 32, LEAD-FREE ALLOYS. INCLUDE
<br />WATER-FLUSHABLE FLUX ACCORDING TO ASTM B 813.
<br />B. BRAZING FILLER METALS: AWS A5.8, BCUP SERIES, COPPER -PHOSPHORUS
<br />ALLOYS FOR GENERAL -DUTY BRAZING, UNLESS OTHERWISE INDICATED; AWS A5.8,
<br />BA01, SILVER ALLOY FOR REFRIGERANT PIPING, UNLESS OTHERWISE INDICATED.
<br />C. WELDING FILLER METALS: COMPLY WITH AWS D10.12 FOR WELDING MATERIALS
<br />APPROPRIATE FOR WALL THICKNESS AND CHEMICAL ANALYSIS OF STEEL PIPE
<br />BEING WELDED.
<br />2.5 PAINT
<br />A. WHEN PAINTING IS NOTED AS REQUIRED, PAINT SHALL BE PROVIDED BY DIVISION
<br />22 IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION 09.
<br />2.6 SLEEVES
<br />A. SLEEVES FOR PIPES THROUGH NON -FIRE RATED FLOORS: 18 GAUGE (1.2 MM)
<br />THICK GALVANIZED STEEL.
<br />B. SLEEVES FOR PIPES THROUGH NON -FIRE RATED BEAMS, WALLS, FOOTINGS, AND
<br />POTENTIALLY WET FLOORS: STEEL PIPE OR 18 GAUGE (1.2 MM) THICK
<br />GALVANIZED STEEL.
<br />C. SLEEVES FOR PIPES THROUGH FIRE RATED AND FIRE RESISTIVE FLOORS AND
<br />WALLS AND FIRE PROOFING: PREFABRICATED FIRE RATED SLEEVES INCLUDING
<br />SEALS, UL LISTED.
<br />D. SLEEVES FOR DUCTWORK: GALVANIZED STEEL.
<br />2.7 SUPPORTS AND ANCHORAGES
<br />A. METAL SUPPORTS FOR DIVISION 23 SYSTEMS AND EQUIPMENT SHALL BE
<br />PROVIDED IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION 05.
<br />PART 3 EXECUTION
<br />3.1 GENERAL
<br />A. MECHANICAL DEMOLITION
<br />1. REFER TO DIVISION 1 AND MECHANICAL SECTIONS FOR GENERAL DEMOLITION
<br />REQUIREMENTS AND PROCEDURES.
<br />2. DISCONNECT, DEMOLISH AND REMOVE MECHANICAL SYSTEMS, EQUIPMENT AND
<br />COMPONENTS INDICATED TO BE REMOVED.
<br />3. IF PIPE, DUCT, INSULATION, OR EQUIPMENT TO REMAIN IS DAMAGED IN
<br />APPEARANCE OR IS UNSERVICEABLE, REMOVE DAMAGED OR UNSERVICEABLE
<br />PORTIONS AND REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND
<br />QUALITY.
<br />B. PIPING SYSTEMS - COMMON REQUIREMENTS
<br />1. INSTALL PIPING ACCORDING TO THE FOLLOWING REQUIREMENTS AND DIVISION
<br />23 SECTIONS SPECIFYING PIPING SYSTEMS.
<br />2. INSTALL PIPING IN CONCEALED LOCATIONS, UNLESS OTHERWISE INDICATED
<br />AND EXCEPT IN EQUIPMENT ROOMS AND SERVICE AREAS.
<br />3. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT
<br />ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING
<br />WALLS. DIAGONAL RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED
<br />OTHERWISE.
<br />4. INSTALL PIPING TO PERMIT VALVE SERVICING.
<br />5. SELECT SYSTEM COMPONENTS WITH PRESSURE RATING EQUAL TO OR
<br />GREATER THAN SYSTEM OPERATING PRESSURE.
<br />6. FIRE -BARRIER PENETRATIONS: MAINTAIN INDICATED FIRE RATING OF WALLS,
<br />PARTITIONS, CEILINGS, AND FLOORS AT PIPE PENETRATIONS. SEAL PIPE
<br />PENETRATIONS WITH FIRESTOP MATERIALS. REFER TO DIVISION 7 SECTION
<br />"THROUGH -PENETRATION FIRESTOP SYSTEMS" FOR MATERIALS.
<br />3.2 ACCESS DOORS
<br />A. PROVIDE ACCESS DOORS WHERE SPECIALTIES ARE NOT EXPOSED UNLESS
<br />INDICATED TO BE PROVIDED UNDER OTHER DIVISIONS.
<br />3.3 DIELECTRIC FITTINGS
<br />A. PROVIDE DIELECTRIC FITTINGS WHENEVER CONNECTING PIPING OF DISSIMILAR
<br />M ETALS.
<br />3.4 ESCUTCHEONS
<br />A. INSTALL ESCUTCHEONS FOR PENETRATIONS OF WALLS, CEILINGS AND FLOORS IN
<br />FINISHED SPACES.
<br />3.5 PAINTING
<br />A. DAMAGE AND TOUCH-UP: REPAIR MARRED AND DAMAGED FACTORY -PAINTED
<br />FINISHES WITH MATERIALS AND PROCEDURES TO MATCH ORIGINAL FACTORY
<br />FINISH.
<br />3.6 SLEEVES
<br />A. PROVIDE SLEEVES FOR ABOVE GRADE DUCT AND PIPING PENETRATIONS OF
<br />WALLS, ROOFS AND FLOORS.
<br />'SECTION 230529 - HVAC HANGERS AND SUPPORTS
<br />PART 1 GENERAL
<br />1.1 SUBMITTALS
<br />A. PRODUCT DATA FOR SPECIFIED MATERIALS.
<br />1.2 QUALITY ASSURANCE.
<br />1.3 PERFORMANCE REQUIREMENTS.
<br />A. DESIGN SUPPORTS FOR MULTIPLE PIPES, INCLUDING PIPE STANDS, CAPABLE OF
<br />SUPPORTING COMBINED WEIGHT OF SUPPORTED SYSTEMS, SYSTEM CONTENTS,
<br />AND TEST WATER.
<br />B. DESIGN EQUIPMENT SUPPORTS CAPABLE OF SUPPORTING COMBINED OPERATING
<br />WEIGHT OF SUPPORTED EQUIPMENT AND CONNECTED SYSTEMS AND
<br />COMPONENTS.
<br />C. DESIGN SEISMIC -RESTRAINT HANGERS AND SUPPORTS FOR PIPING AND
<br />EQUIPMENT. OBTAIN APPROVAL FROM AUTHORITIES HAVING JURISDICTION.
<br />PART 2 PRODUCTS
<br />2.1 STEEL PIPE HANGERS AND SUPPORTS
<br />A. MANUFACTURERS
<br />1. CRANE, 2. ERICO/MICHIGAN HANGER CO., 3. FEE AND MASON, 4. GRINNELL
<br />CORP., 5. TOLCO INC.
<br />B. DESCRIPTION: MSS SP-58, TYPES 1 THROUGH 58, FACTORY -FABRICATED
<br />COMPONENTS.
<br />C. GALVANIZED, METALLIC COATINGS: PRE -GALVANIZED OR HOT DIPPED.
<br />2.2 THERMAL -HANGER SHIELD INSERTS
<br />A. MANUFACTURERS
<br />1. CARPENTER & PATERSON, INC.
<br />2. ERICO/MICHIGAN HANGER CO.
<br />3. PIPE SHIELDS, INC.
<br />B. DESCRIPTION: 100-PSIG- (690-KPA-) MINIMUM COMPRESSIVE -STRENGTH
<br />INSULATION INSERT ENCASED IN SHEET METAL SHIELD
<br />PART 3 EXECUTION
<br />3.1 HANGER AND SUPPORT APPLICATIONS
<br />A. GENERAL
<br />1. COMPLY WITH MSS SP-69 FOR PIPE HANGER SELECTIONS AND APPLICATIONS.
<br />2. USE HANGERS AND SUPPORTS WITH GALVANIZED, METALLIC COATINGS FOR
<br />PIPING AND EQUIPMENT THAT WILL NOT HAVE FIELD -APPLIED FINISH.
<br />3. USE NONMETALLIC COATINGS ON ATTACHMENTS FOR ELECTROLYTIC PROTECTION
<br />WHERE ATTACHMENTS ARE IN DIRECT CONTACT WITH COPPER TUBING.
<br />4. USE POWDER -ACTUATED FASTENERS OR MECHANICAL -EXPANSION ANCHORS
<br />INSTEAD OF BUILDING ATTACHMENTS WHERE REQUIRED IN CONCRETE
<br />CONSTRUCTION.
<br />3.2 HANGER AND SUPPORT INSTALLATION
<br />A. STEEL PIPE HANGER INSTALLATION: COMPLY WITH MSS SP-69 AND MSS SP-89.
<br />INSTALL HANGERS, SUPPORTS, CLAMPS AND ATTACHMENTS AS REQUIRED TO
<br />PROPERLY SUPPORT PIPING FROM BUILDING STRUCTURE.
<br />B. THERMAL -HANGER SHIELD INSTALLATION: INSTALL IN PIPE HANGER OR SHIELD FOR
<br />INSULATED PIPING.
<br />C. EQUIPMENT SUPPORT INSTALLATION: FABRICATE FROM WELDED -STRUCTURAL -STEEL
<br />SHAPES.
<br />D. INSTALL HANGERS AND SUPPORTS TO ALLOW CONTROLLED THERMAL AND SEISMIC
<br />MOVEMENT OF PIPING SYSTEMS, TO PERMIT FREEDOM OF MOVEMENT BETWEEN
<br />PIPE ANCHORS AND TO FACILITATE ACTION OF EXPANSION JOINTS, EXPANSION
<br />LOOPS, EXPANSION BENDS AND SIMILAR UNITS.
<br />E. INSTALL BUILDING ATTACHMENTS WITHIN CONCRETE SLABS OR ATTACH TO
<br />STRUCTURAL STEEL.
<br />F. INSULATED PIPING: COMPLY WITH THE FOLLOWING:
<br />1. ATTACH CLAMPS AND SPACERS TO PIPING.
<br />o. PIPING OPERATING ABOVE AMBIENT AIR TEMPERATURE: CLAMP MAY
<br />PROJECT THROUGH INSULATION.
<br />b. PIPING OPERATING BELOW AMBIENT AIR TEMPERATURE: USE
<br />THERMAL -HANGER SHIELD INSERT WITH CLAMP SIZED TO MATCH OD OF
<br />INSERT.
<br />c. DO NOT EXCEED PIPE STRESS LIMITS ACCORDING TO ASME B31.1 FOR
<br />POWER PIPING AND ASME B31.9 FOR BUILDING SERVICES PIPING.
<br />3.3 ADJUSTING
<br />A. HANGER ADJUSTMENTS: ADJUST HANGERS TO DISTRIBUTE LOADS EQUALLY ON
<br />ATTACHMENTS AND TO ACHIEVE INDICATED SLOPE OF PIPE.
<br />SECTION 230593 - HVAC TESTING, ADJUSTING AND EALANICING
<br />PART 1 GENERAL
<br />1.1 SUBMITTALS
<br />A. CERTIFIED TAB REPORTS: SUBMIT TWO COPIES OF REPORTS PREPARED, AS
<br />SPECIFIED IN THIS SECTION, ON APPROVED FORMS CERTIFIED BY TAB FIRM.
<br />B. WARRANTIES SPECIFIED IN THIS SECTION.
<br />1.2 QUALITY ASSURANCE
<br />A. TAB FIRM QUALIFICATIONS: ENGAGE A TAB FIRM CERTIFIED BY AABC OR NEBB.
<br />B. CERTIFICATION OF TAB REPORTS: CERTIFY TAB FIELD DATA REPORTS. THIS
<br />CERTIFICATION INCLUDES THE FOLLOWING:
<br />1. REVIEW FIELD DATA REPORTS TO VALIDATE ACCURACY OF DATA AND TO
<br />PREPARE CERTIFIED TAB REPORTS.
<br />2. CERTIFY THAT TAB TEAM COMPLIED WITH APPROVED TAB PLAN AND THE
<br />PROCEDURES SPECIFIED AND REFERENCED IN THIS SPECIFICATION.
<br />C. TAB REPORT FORMS: USE STANDARD FORMS NEBB'S "PROCEDURAL STANDARDS
<br />FOR TESTING, ADJUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS."
<br />1.3 COORDINATION
<br />A. COORDINATE THE EFFORTS OF FACTORY -AUTHORIZED SERVICE REPRESENTATIVES
<br />FOR SYSTEMS AND EQUIPMENT, HVAC CONTROLS INSTALLERS AND OTHER
<br />MECHANICS TO OPERATE HVAC SYSTEMS AND EQUIPMENT TO SUPPORT AND ASSIST
<br />TAB ACTIVITIES.
<br />PART 2 EXECUTION
<br />2.1 TAB SPECIALISTS
<br />A. APPROVED TAB SPECIALISTS
<br />1. NEODORFER ENGINEERS.
<br />2. HARDIN & SONS.
<br />3. TEST COMM.
<br />2.2 EXAMINATION
<br />A. GENERAL
<br />1. VERIFY THAT SYSTEMS ARE COMPLETE AND OPERABLE BEFORE COMMENCING
<br />WORK. ENSURE THAT THE ITEMS ON THE PRE -BALANCE CHECKLIST ARE
<br />COMPLETED.
<br />2. EXAMINE SYSTEM AND EQUIPMENT INSTALLATIONS AND VERIFY THAT FIELD
<br />QUALITY -CONTROL TESTING, CLEANING AND ADJUSTING SPECIFIED IN INDIVIDUAL
<br />SECTIONS HAVE BEEN PERFORMED.
<br />3. EXAMINE TEST REPORTS SPECIFIED IN INDIVIDUAL SYSTEM AND EQUIPMENT
<br />SECTIONS.
<br />2% Ocl!<es �,ve.
<br />Suite "100
<br />Everett, W"\ 98991
<br />"li E �tgr 13s 10 MI
<br />(3 S, t a n t.'', e, c
<br />4100 194th Street Sid Suite 400
<br />Lynnwood Washington 98036-4613
<br />(206) 667-0555
<br />Copyright Reserved
<br />The Contractor shall verify and be responsible for all dimensions. DO
<br />NOT scale the drawing - any errors or omissions shall be reported to
<br />Stantec without delay.
<br />The Copyrights to all designs and drawings are the property of
<br />Stantec. Reproduction or use for any purpose other than that
<br />authorized by Stantec is forbidden.
<br />r
<br />JOB NO
<br />DRAWN BY
<br />CHECKED SY
<br />� d
<br />��
<br />rm
<br />111--08- i1
<br />S P EC !11 1 CA ,I,II � 0 N S
<br />III,.
<br />r I`li I r, FIT%
<br />
|