SEOTI®N 221300 o SANITARY WASTE AND VENT PIPING SYSTEMS CONTINUED <br />PART 1 PRODUCTS CONTINUED <br />D. WALL CLEANOUTS: COATED CAST IRON CLEANOUT TEE; GASKET SEALED IRON PLUG; <br />SHALLOW TYPE; ROUND, STAINLESS STEEL WALL COVER WITH CENTER VANDAL -PROOF <br />SCREW. <br />1.1 FLOOR DRAINS <br />A. MANUFACTURERS: J.R. SMITH, JOSAM, WADE, ZURN. <br />B. ASMEA112.6.3; CAST IRON BODY; DOUBLE DRAINAGE FLANGE; WEEP HOLES; <br />REVERSIBLE CLAMPING COLLAR. <br />1.2 MISCELLANEOUS DRAINAGE PIPING SPECIALTIES <br />A. DEEP -SEAL TRAPS: CAST-IRON OR BRONZE CASTING, WITH INLET AND OUTLET <br />MATCHING CONNECTED PIPING AND CLEANOUT TRAP -SEAL PRIMER VALVE CONNECTION, <br />SAME SIZE AS CONNECTED WASTE PIPING. <br />B. FLOOR -DRAIN, TRAP -SEAL PRIMER FITTINGS: CAST IRON, WITH THREADED INLET AND <br />THREADED OR SPIGOT OUTLET, AND TRAP -SEAL PRIMER VALVE CONNECTION. SAME <br />SIZE AS FLOOR DRAIN OUTLET WITH NPS 1/2 (DN 15) SIDE INLET. <br />C. AIR -CAP FITTINGS: ASMEA112.1.2, FOR FITTING DESIGNED TO ENSURE FIXED, POSITIVE <br />AIR GAP BETWEEN INSTALLED INLET AND OUTLET PIPING; BRONZE OR CAST IRON BODY; <br />INLET IN TOP OF BODY; OUTLET LARGER THAN INLET. SAME SIZE AS CONNECTED <br />WASTE PIPING AND WITH INLET LARGE ENOUGH FOR ASSOCIATED INDIRECT WASTE <br />PIPING. <br />PART 2 EXECUTION <br />2.1 PIPING <br />A. MAKE CHANGES IN DIRECTION FOR SOIL AND WASTE DRAINAGE AND VENT PIPING USING <br />APPROPRIATE BRANCHES, BENDS, AND LONG -SWEEP BENDS. SANITARY TEES AND <br />SHORT -SWEEP 1/4 BENDS MAY BE USED ON VERTICAL STACKS IF CHANGE IN <br />DIRECTION OF FLOW IS FROM HORIZONTAL TO VERTICAL, USE LONG -TURN, DOUBLE <br />Y-BRANCH AND 1/8-BEND FITTINGS IF 2 FIXTURES ARE INSTALLED BACK TO BACK OR <br />SIDE BY SIDE WITH COMMON DRAIN PIPE. STRAIGHT TEES, ELBOWS, AND CROSSES <br />MAY BE USED ON VENT LINES. DO NOT CHANGE DIRECTION OF FLOW MORE THAN 90 <br />DEGREES. USE PROPER SIZE OF STANDARD INCREASERS AND REDUCERS IF PIPES OF <br />DIFFERENT SIZES ARE CONNECTED. REDUCING SIZE OF DRAINAGE PIPING IN DIRECTION <br />OF FLOW IS PROHIBITED. <br />B. INSTALL SOIL AND WASTE DRAINAGE AND VENT PIPING AT THE FOLLOWING MINIMUM <br />SLOPES, UNLESS OTHERWISE INDICATED: <br />1. HORIZONTAL SANITARY DRAINAGE PIPING: 2 PERCENT DOWNWARD IN DIRECTION OF <br />FLOW. <br />a. FOR PIPING NPS 4 AND LARGER, 1 PERCENT SLOPE CAN BE UTILIZED WHEN <br />APPROVED BY THE AUTHORITIES HAVING JURISDICTION AND THE ENGINEER. <br />2. VENT PIPING: 1 PERCENT DOWN TOWARD VERTICAL FIXTURE VENT OR TOWARD VENT <br />STACK. <br />C. INSTALL ESCUTCHEONS AT WALL, FLOOR, AND CEILING PENETRATIONS IN EXPOSED <br />FINISHED LOCATIONS AND WITHIN CABINETS AND MILLWORK. USE DEEP -PATTERN <br />ESCUTCHEONS IF REQUIRED TO CONCEAL PROTRUDING PIPE AND FITTINGS. <br />D. CAST IRON PIPING <br />1. INSTALL CAST-IRON SOIL PIPING ACCORDING TO CISPI`S "CAST IRON SOIL PIPE AND <br />FITTINGS HANDBOOK," CHAPTER IV, "INSTALLATION OF CAST IRON SOIL PIPE AND <br />FITTINGS." <br />2. SLEEVES ARE NOT REQUIRED FOR CAST-IRON SOIL PIPING PASSING THROUGH <br />CONCRETE SLABS -ON -GRADE IF SLAB IS WITHOUT MEMBRANE WATERPROOFING. <br />2.2 CLEANOUTS <br />A. INSTALL CLEANOUTS AT GRADE AND EXTEND TO WHERE BUILDING SANITARY DRAINS <br />CONNECT TO BUILDING SANITARY SEWERS. <br />B. INSTALL CLEANOUTS IN ABOVE GROUND PIPING AND BUILDING DRAIN PIPING ACCORDING <br />TO THE FOLLOWING, UNLESS OTHERWISE INDICATED: <br />1. SIZE SAME AS DRAINAGE PIPING UP TO NPS 4. USE NPS 4 FOR LARGER DRAINAGE <br />PIPING UNLESS LARGER CLEANOUT IS INDICATED. <br />2. LOCATE AT EACH CHANGE IN DIRECTION OF PIPING GREATER, THAN 45 DEGREES. <br />3. LOCATE AT MINIMUM INTERVALS OF 50 FEET FOR PIPING NPS 4 AND SMALLER AND <br />100 FEET FOR LARGER PIPING. <br />4. LOCATE AT BASE OF EACH VERTICAL SOIL AND WASTE STACK. <br />2.3 FLOOR DRAINS <br />A. INSTALL FLOOR DRAINS AT LOW POINTS OF SURFACE AREAS TO BE DRAINED. SET <br />GRATES OF DRAINS FLUSH WITH FINISHED FLOOR, UNLESS OTHERWISE INDICATED. <br />ROOF FLASHING ASSEMBLIES <br />B. INSTALL. ROOF FLASHING ASSEMBLIES ON SANITARY STACK VENTS AND VENT STACKS <br />THAT EXTEND THROUGH ROOF. <br />2.4 MISCELLANEOUS DRAINAGE PIPING SPECIALTIES <br />A. FLOOR -DRAIN, TRAP -SEAL PRIMER FITTINGS: INSTALL FLOOR -DRAIN, TRAP -SEAL <br />PRIMER FITTINGS ON INLET TO FLOOR DRAINS THAT REQUIRE TRAP -SEAL PRIMER <br />CONNECTION. <br />B. AIR -GAP FITTINGS: INSTALL AIR -GAP FITTINGS ON DRAINING -TYPE BACKFLOW <br />PREVENTERS AND ON INDIRECT -WASTE PIPING DISCHARGE INTO SANITARY DRAINAGE <br />SYSTEM. <br />C. SLEEVE FLASHING DEVICE: INSTALL SLEEVE FLASHING DEVICE WITH EACH RISER AND <br />STACK PASSING THROUGH FLOORS WITH WATERPROOF MEMBRANE. <br />2.5 TESTING <br />A. TEST SANITARY DRAINAGE AND VENT PIPING ACCORDING TO PROCEDURES OF <br />AUTHORITIES HAVING JURISDICTION. <br />SECTION 224000 - PLUMBING FIXTURES <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. GENERAL <br />1. PRODUCT DATA: FOR EACH TYPE OF PLUMBING FIXTURE INDICATED. INCLUDE <br />SELECTED FIXTURE AND TRIM, FITTINGS, ACCESSORIES, APPLIANCES, <br />APPURTENANCES, EQUIPMENT AND SUPPORTS. INDICATE MATERIALS AND FINISHES, <br />DIMENSIONS, CONSTRUCTION DETAILS AND FLOW -CONTROL RATES. <br />B. OPERATION AND MAINTENANCE DATA: FOR PLUMBING FIXTURES TO INCLUDE IN <br />EMERGENCY, OPERATION, AND MAINTENANCE MANUALS. <br />1.2 QUALITY ASSURANCE <br />A. COMPLY WITH THE FOLLOWING APPLICABLE STANDARDS AND OTHER REQUIREMENTS <br />SPECIFIED FOR PLUMBING FIXTURES: <br />1. ENAMELED, CAST-IRON FIXTURES: ASME A112.19.1 M. <br />2. PORCELAIN -ENAMELED, FORMED -STEEL FIXTURES: ASMEA112.19.4M. <br />3. SOLID -SURFACE -MATERIAL LAVATORIES AND SINKS: ANSI/ICPA SS-1. <br />4. STAINLESS -STEEL COMMERCIAL, HANDWASH SINKS: NSF 2 CONSTRUCTION. <br />5. VITREOUS -CHINA FIXTURES: ASME Al 12.19.2M. <br />6. WATER -CLOSET, FLUSH VALVE, TANK TRIM: ASME A112.19.5. <br />B. COMPLY WITH THE FOLLOWING APPLICABLE STANDARDS AND OTHER <br />REQUIREMENTS SPECIFIED FOR LAVATORY AND SINK FAUCETS: <br />1. FAUCETS: ASME A112.18.1. <br />2. HOSE -CONNECTION VACUUM BREAKERS: ASSE 1011. <br />3. HOSE -COUPLING THREADS: ASME B1.20.7. <br />4. INTEGRAL, ATMOSPHERIC VACUUM BREAKERS: ASSE 1001. <br />5. NSF POTABLE -WATER MATERIALS: NSF 61. <br />6. PIPE THREADS: ASME B1.20.1. <br />7. SUPPLY FITTINGS: ASME A112.18.1. <br />8. BRASS WASTE FITTINGS: ASME Al 12.18.2. <br />PART 2 PRODUCTS <br />2.1 GENERAL FIXTURES <br />A. MANUFACTURERS <br />1. VITREOUS CHINA FIXTURES: AMERICAN STANDARD, ELJIER, KOHLER - <br />COMMERCIAL. <br />2. STAINLESS STEEL SINKS: ELKAY, JUST, FRANKE. <br />3. FAUCETS: CHICAGO, SYMMONS, T & S. <br />4. FLUSH VALVES: SLOAN. <br />5. SUPPLIES: BRASS CRAFT, CHICAGO, DEARBORN BRASS. <br />6. SEATS: BEMMS, BENEKE, CHURCH, OLSONITE. <br />7. CARRIERS: J.R. SMITH, JOSAM, ZURN. <br />B. COUNTER -MOUNTED LAVATORIES (VITREOUS CHINA) <br />1. LAVATORY: ANSI Al12.19.2; VITREOUS CHINA SELF -RIMMING COUNTER TOP <br />LAVATORY; DRILLINGS ON 4 INCH OR 8 INCH CENTERS AS SCHEDULED ON <br />DRAWINGS; FRONT OVERFLOW; SOAP DEPRESSION; SEAL OF PUTTY, CAULKING OR <br />CONCEALED VINYL GASKET. <br />PART 3 EXECUTION <br />3.1 I N STALLATIO N <br />C. ASSEMBLE PLUMBING FIXTURES, TRIM, FITTINGS AND OTHER COMPONENTS ACCORDING <br />TO MANUFACTURERS' WRITTEN INSTRUCTIONS. <br />3.2 CONNECTIONS <br />A. CONNECT FIXTURES WITH WATER SUPPLIES, STOPS, AND RISERS, AND WITH TRAPS, <br />SOIL, WASTE, AND VENT PIPING. USE SIZE FITTINGS REQUIRED TO MATCH FIXTURES. <br />3.3 CLEANING <br />A. CLEAN FIXTURES, FAUCETS, AND OTHER FITTINGS WITH MANUFACTURERS' <br />RECOMMENDED CLEANING METHODS AND MATERIALS. <br />SECTION 226313 - GAS PIPING FOR HEALTHCARE FACILITIES <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A. THIS SECTION INCLUDES THE FOLLOWING: <br />1. OXYGEN PIPING AND SPECIALTIES DESIGNED "MEDDICAL OXYGEN" OPERATING AT <br />50 TO 55 PSIG. <br />2. HEALTHCARE VACUUM PIPING AND SPECIALTIES, DESIGNATED MEDICAL VACUUM. <br />3. MEDICAL AIR PIPING AND SPECIALTIES, DESIGNATED MEDICAL AIR. <br />PART 2 PRODUCTS <br />2.1 PIPES, TUBES AND FITTINGS <br />A. COPPER MEDICAL GAS TUBE: ASTM B 819, TYPES K AND L, SEAMLESS, DRAWN <br />TEMPER THAT HAS BEEN MANUFACTURED CLEANED, PURGED AND SEALED FOR <br />MEDICAL GAS SERVICE OR ACCORDING TO CGA G-4.1 FOR OXYGEN SERVICE. <br />INCLUDE STANDARD COLOR MARKING "OXY', "MET, "OXY/MED" "OXY/ACR" OR <br />"ACR/MED" IN GREEN FOR TYPE K TUBE AND BLUE FOR TYPE L TUBE. <br />SECTION 230000 m GENERAL HVAC REQUIREMENTS <br />PART 1 GENERAL <br />1.1 SCOPE OF WORK <br />A. INCLUDE COMPLETE AND FUNCTIONAL MECHANICAL SYSTEMS - INCLUDING ALL <br />REQUIRED MATERIALS, LABOR, EQUIPMENT AND SERVICES NECESSARY TO ACHIEVE <br />THE DESIRED FINAL PRODUCT. <br />1.2 APPLICABLE CODES <br />A. WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES AND <br />STANDARDS AS ADOPTED BY THE AUTHORITIES HAVING JURISDICTION INCLUDING <br />AMENDMENTS. FOLLOWING IS A LISTING OF MAJOR CODES AND STANDARDS, THE <br />REQUIREMENTS OF WHICH SHALL BE CONSIDERED PART OF THE SCOPE OF THIS <br />PROJECT. THIS LIST SHOULD NOT BE CONSIDERED COMPREHENSIVE AND CODES OR <br />STANDARDS NOT INCLUDED IN THIS LIST SHOULD NOT BE CONSIDERED TO BE <br />EXCLUDED FROM THE SCOPE OF THE PROJECT. <br />1. AMERICANS WITH DISABILITIES ACT ADA). <br />2. APPLICABLE STATE AND LOCAL CODES AND ORDINANCES. <br />3. NATIONAL ELECTRICAL CODE. <br />4. INTERNATIONAL BUILDING CODE. <br />5. INTERNATIONAL FIRE CODE. <br />6. INTERNATIONAL MECHANICAL CODE. <br />7. UNIFORM PLUMBING CODE. <br />8. WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE. <br />9. WASHINGTON STATE INDOOR AIR QUALITY CODE. <br />10. WASHINGTON STATE BOILER AND UNFIRED PRESSURE VESSEL CODE. <br />1.3 PERMITS AND FEES <br />A. ALL PERMITS AND INSPECTIONS REQUIRED TO COMPLETE SCOPE OF WORK SHALL BE <br />INCLUDED IN THE BID PRICE. <br />B. ALL FEES REQUIRED BY UTILITY PROVIDERS SHALL BE INCLUDED IN THE DIVISION 23 <br />BID PRICE. <br />1.4 SCOPE AND APPROPRIATE USE OF BID DOCUMENTS <br />A. THESE SPECIFICATIONS AND ACCOMPANYING DRAWINGS ARE INTENDED TO <br />COMMUNICATE THE DESIGN CONCEPT FOR THIS PROJECT AND OUTLINE THE SCOPE <br />OF WORK. WORK NOT SPECIFICALLY NOTED IN THESE SPECIFICATIONS OR THE <br />ACCOMPANYING DRAWINGS, BUT WHICH IS REQUIRED TO COMPLETE THE PROJECT, <br />SHALL BE INCLUDED AS PART OF CONTRACTOR'S SCOPE. <br />B. THESE SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS ARE INTENDED TO <br />SUPPLEMENT EACH OTHER. INFORMATION INCLUDED IN EITHER ONE SHALL BE <br />INCORPORATED INTO THE PROJECT AS IF INCLUDED IN BOTH. IN THE EVENT OF <br />ANY CONFLICTS, THE MOST STRINGENT REQUIREMENTS SHALL BE CONSIDERED THE <br />GOVERNING SCOPE OF WORK UNTIL AND UNLESS CLARIFICATION CAN BE OBTAINED <br />BY THE CONTRACTOR. <br />C. DRAWINGS ARE INTENDED TO INDICATE THE GENERAL ARRANGEMENT OF PIPING, <br />DUCTWORK, EQUIPMENT AND OTHER COMPONENTS OF SYSTEMS. THEY SHALL BE <br />FOLLOWED AS CLOSELY AS POSSIBLE, BUT SHALL BE CONSIDERED DIAGRAMMATIC IN <br />NATURE. THEY ARE NOT INTENDED TO SHOW EVERY COMPONENT, FITTING, OFFSET, <br />ETC. COMPONENTS, FITTINGS, OFFSETS, ETC. AS REQUIRED TO MEET THE INTENT OF <br />THE DOCUMENTS AND TO ACHIEVE COORDINATION WITH OTHER TRADES SHALL BE <br />INCLUDED IN THE DIVISION 23 SCOPE OF WORK. <br />1.5 ROUTING AND LOCATIONS <br />A. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE EQUIPMENT LOCATIONS <br />AND SYSTEM ROUTING WITH AVAILABLE SPACE AND WITH ALL OTHER TRADES, <br />1.6 SCHEDULING <br />A. IT IS UNDERSTOOD THAT WHILE DRAWINGS ARE TO BE FOLLOWED AS CLOSELY AS <br />CIRCUMSTANCES PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />INSTALLATION OF SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF <br />CONTRACT DOCUMENTS. ANYTHING NOT CLEAR OR IN CONFLICT WILL BE <br />EXPLAINED BY MAKING APPLICATION TO OWNER'S REPRESENTATIVE. THE <br />CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH HIS SCOPE OF WORK AS WELL AS <br />THE REQUIRED COORDINATION WITH OTHER TRADES AND THE SCHEDULING OF <br />OTHER TRADES SUFFICIENTLY TO ADDRESS COORDINATION ISSUES IN A TIMELY <br />MANNER SUCH THAT THEY DO NOT RESULT IN REMEDIAL WORK FOR OTHER <br />TRADES. <br />B. THE CONTRACTOR SHALL COORDINATE WITH THE WORK OF VARIOUS TRADES WHEN <br />INSTALLING INTERRELATED WORK. BEFORE INSTALLATION OF MECHANICAL ITEMS, <br />PROPER PROVISIONS SHALL BE MADE TO AVOID INTERFERENCES. CHANGES <br />REQUIRED IN WORK SPECIFIED IN DIVISION 23 CAUSED BY NEGLECT TO DO SO <br />SHALL BE MADE AT NO COST TO OWNER. <br />1.7 CUTTING AND PATCHING <br />A. THE DIVISION 23 CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND <br />PATCHING REQUIRED TO COMPLETE THE DIVISION 23 SCOPE OF WORK. <br />1.8 GUARANTEE <br />A. ALL DIVISION 23 SYSTEMS AND EQUIPMENT SHALL BE GUARANTEED FOR A <br />MINIMUM PERIOD OF ONE YEAR. <br />B. THE GUARANTEE SHALL BEGIN AT THE DATE OF ACCEPTANCE, UNLESS WRITTEN <br />DOCUMENTATION IS PROVIDED NOTING OTHERWISE. <br />1.9 QUALITY ASSURANCE <br />A. MATERIAL AND EQUIPMENT QUALIFICATIONS <br />1. PROVIDE MATERIALS AND EQUIPMENT THAT ARE STANDARD PRODUCTS OF <br />MANUFACTURERS REGULARLY ENGAGED IN THE MANUFACTURE OF SUCH <br />PRODUCTS, WHICH ARE OF A SIMILAR MATERIAL, DESIGN AND WORKMANSHIP. <br />STANDARD PRODUCTS SHALL HAVE BEEN IN SATISFACTORY COMMERCIAL OR <br />INDUSTRIAL USE FOR 2 YEARS PRIOR TO BID OPENING. THE 2-YEAR USE <br />SHALL INCLUDE APPLICATIONS OF EQUIPMENT AND MATERIALS UNDER SIMILAR <br />CIRCUMSTANCES AND OF SIMILAR SIZE. THE PRODUCT SHALL HAVE BEEN <br />FOR SALE ON THE COMMERCIAL MARKET THROUGH. ADVERTISEMENTS, <br />MANUFACTURERS' CATALOGS OR BROCHURES DURING THE 2 YEAR PERIOD. <br />B. SERVICE SUPPORT: THE EQUIPMENT ITEMS SHALL BE SUPPORTED BY SERVICE <br />ORGANIZATIONS. WHEN REQUESTED TO GAIN APPROVAL, SUBMIT A CERTIFIED LIST <br />OF QUALIFIED PERMANENT SERVICE ORGANIZATIONS FOR SUPPORT OF THE <br />EQUIPMENT WHICH INCLUDES THEIR ADDRESSES AND QUALIFICATIONS. <br />C. UL LISTINGS: ALL EQUIPMENT SHALL BE PROVIDED WITH A UL OR APPROVED <br />EQUIVALENT LABEL WHEN LABELING IS AVAILABLE FOR THAT TYPE OF EQUIPMENT. <br />D. ALL CONTROL PANELS SHALL BE UL LISTED (OR EQUIVALENT APPROVED LABEL). <br />E. PRESSURE VESSELS SHALL BE PROVIDED IN ACCORDANCE WITH APPLICABLE <br />PRESSURE VESSEL ORDINANCES. <br />F. ALL MECHANICAL EQUIPMENT SHALL HAVE AN AIC RATING OF 100,000 OR <br />OTHERWISE SPECIFIED ON ELECTRICAL ONE -LINE DIAGRAMS FAULT CURRENT FOR <br />EACH PIECE OF EQUIPMENT. <br />1.10 SUBSTITUTIONS <br />A. WHEN MULTIPLE MANUFACTURERS ARE LISTED IN THESE SPECIFICATIONS, <br />EQUIPMENT CAN BE USED FROM THOSE MANUFACTURERS PROVIDING THEY CAN <br />MEET THE REQUIREMENTS OF THE SPECIFICATIONS AND DRAWINGS. THIS SHALL <br />INCLUDE MEETING CAPACITY REQUIREMENTS, EFFICIENCIES, SPACE AND WEIGHT <br />LIMITATIONS, ELECTRICAL PROVISIONS, ETC. THE DETAILED INFORMATION IN THE <br />SPECIFICATIONS, SCHEDULED EQUIPMENT INFORMATION, ADDITIONAL DRAWING <br />INFORMATION AND ANY SPECIFIC REFERENCES TO A PARTICULAR MANUFACTURER <br />AND/OR MODEL OF EQUIPMENT SHALL BE CONSIDERED THE BASIS OF DESIGN. <br />OTHER LISTED MANUFACTURERS, EVEN WHEN LISTED IN THESE SPECIFICATIONS, <br />WILL ONLY BE ALLOWED IF THEY MEET OR EXCEED THAT BASIS OF DESIGN. <br />B. IT IS THE CONTRACTOR'S RESPONSIBILITY WHEN UTILIZING APPROVED SUBSTITUTED <br />EQUIPMENT TO ENSURE THE EQUIPMENT WILL FIT WITHIN THE CONSTRAINTS OF <br />THE PROJECT AS DETAILED USING THE BASIS OF DESIGN EQUIPMENT (SPACE, <br />WEIGHT, POWER, ETC.). ANY REQUIRED ALTERATIONS BY DIVISION 23 OR ANY <br />OTHER DIVISION OF WORK TO ACCOMMODATE DIFFERENCES BETWEEN THE <br />SUBSTITUTED EQUIPMENT AND THE BASIS OF DESIGN EQUIPMENT SHALL BE THE <br />RESPONSIBILITY OF THE DIVISION 23 CONTRACTOR, INCLUDING THE COST OF <br />DESIGN FOR THE REQUIRED CHANGES. <br />1.11 SUBMITTALS <br />A. SUBMITTAL INFORMATION SHALL BE PROVIDED AND APPROVED ON ALL MATERIALS <br />AND EQUIPMENT PRIOR TO ORDERING. <br />B. PROVIDE INDICATION OF WHICH OPTIONS AND ACCESSORIES ARE TO BE INCLUDED. <br />C. INCLUDE ALL SCHEDULED INFORMATION FOR EQUIPMENT <br />Q ENT LISTED IN SCHEDULES ON <br />THE DRAWINGS. <br />D. REVIEW WILL BE FOR GENERAL CONFORMANCE ONLY, AND SHALL NOT RELIEVE <br />THE CONTRACTOR FOR ANY DEVIATIONS FROM THE REQUIREMENTS OF THE <br />DOCUMENTS UNLESS CLEAR WRITTEN REFERENCE IS MADE BY THE CONTRACTOR <br />IN THE SUBMITTAL TO PROPOSED DEVIATIONS. <br />1.12 DELIVERY, STORAGE AND HANDLING <br />A. FOLLOW MANUFACTURER'S DIRECTIONS IN DELIVERY, STORAGE, PROTECTION AND <br />INSTALLATION OF EQUIPMENT AND MATERIALS. <br />B. HANDLE, STORE AND PROTECT EQUIPMENT AND MATERIALS TO PREVENT DAMAGE <br />BEFORE AND DURING INSTALLATION IN ACCORDANCE WITH THE MANUFACTURER'S <br />RECOMMENDATIONS AND AS APPROVED BY THE CONTRACTING OFFICER. REPLACE <br />DAMAGED OR DEFECTIVE ITEMS. <br />C. STORE DUCTWORK IN A CLEAN, DRY LOCATION. IF THE LOCATION OF STORAGE <br />CANNOT BE PROTECTED FROM MOISTURE, KEEP DUCTWORK ABOVE GRADE LEVEL <br />TO PROTECT FROM STANDING WATER. <br />1.13 OPERATION AND MAINTENANCE MANUALS <br />A. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED IN THREE POST <br />BINDERS CAPABLE OF HAVING MATERIALS ADDED OR REMOVED, STANDARD <br />CLASP -TYPE BINDERS ARE NOT ACCEPTABLE. BINDERS WITH OVERLAPPING, <br />TELESCOPING POSTS SHALL BE USED. <br />SECTION 230500 - BASIC &fi/AC MATERIALS AND METHODS <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. GENERAL <br />1. PRODUCT DATA FOR SPECIFIED MATERIALS. <br />2. WELDING CERTIFICATES <br />1.2 DELIVERY, STORAGE AND HANDLING <br />A. DELIVER PIPES AND TUBES WITH FACTORY -APPLIED END CAPS. MAINTAIN END <br />CAPS THROUGH SHIPPING, STORAGE AND HANDLING TO PREVENT PIPE END <br />DAMAGE AND TO PREVENT ENTRANCE OF DIRT, DEBRIS AND MOISTURE. <br />PART 2 PRODUCTS <br />2.1 ACCESS DOORS <br />A. ACCESS DOORS SHALL BE PROVIDED BY DIVISION 23 WHEN SERVING DIVISION 23 <br />SYSTEMS AND EQUIPMENT IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION <br />08. <br />2.2 DIELECTRIC FITTINGS <br />DESCRIPTION: COMBINATION FITTING OF COPPER ALLOY AND FERROUS MATERIALS <br />WITH THREADED, SOLDER -JOINT, PLAIN OR WELD -NECK END CONNECTIONS THAT <br />MATCH PIPING SYSTEM MATERIALS. <br />2.3 ESCUTCHEONS <br />A. DESCRIPTION: CHROME PLATED STEEL MANUFACTURED WALL AND CEILING <br />ESCUTCHEONS AND FLOOR PLATES, WITH AN INSIDE DIAMETER TO CLOSELY FIT <br />AROUND PIPE, TUBE AND INSULATION OF INSULATED PIPING AND AN OUTSIDE <br />DIAMETER THAT COMPLETELY COVERS OPENING. <br />2.4 JOINING MATERIALS <br />A. SOLDER FILLER METALS: ASTM B 32, LEAD-FREE ALLOYS. INCLUDE <br />WATER-FLUSHABLE FLUX ACCORDING TO ASTM B 813. <br />B. BRAZING FILLER METALS: AWS A5.8, BCUP SERIES, COPPER -PHOSPHORUS <br />ALLOYS FOR GENERAL -DUTY BRAZING, UNLESS OTHERWISE INDICATED; AWS A5.8, <br />BA01, SILVER ALLOY FOR REFRIGERANT PIPING, UNLESS OTHERWISE INDICATED. <br />C. WELDING FILLER METALS: COMPLY WITH AWS D10.12 FOR WELDING MATERIALS <br />APPROPRIATE FOR WALL THICKNESS AND CHEMICAL ANALYSIS OF STEEL PIPE <br />BEING WELDED. <br />2.5 PAINT <br />A. WHEN PAINTING IS NOTED AS REQUIRED, PAINT SHALL BE PROVIDED BY DIVISION <br />22 IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION 09. <br />2.6 SLEEVES <br />A. SLEEVES FOR PIPES THROUGH NON -FIRE RATED FLOORS: 18 GAUGE (1.2 MM) <br />THICK GALVANIZED STEEL. <br />B. SLEEVES FOR PIPES THROUGH NON -FIRE RATED BEAMS, WALLS, FOOTINGS, AND <br />POTENTIALLY WET FLOORS: STEEL PIPE OR 18 GAUGE (1.2 MM) THICK <br />GALVANIZED STEEL. <br />C. SLEEVES FOR PIPES THROUGH FIRE RATED AND FIRE RESISTIVE FLOORS AND <br />WALLS AND FIRE PROOFING: PREFABRICATED FIRE RATED SLEEVES INCLUDING <br />SEALS, UL LISTED. <br />D. SLEEVES FOR DUCTWORK: GALVANIZED STEEL. <br />2.7 SUPPORTS AND ANCHORAGES <br />A. METAL SUPPORTS FOR DIVISION 23 SYSTEMS AND EQUIPMENT SHALL BE <br />PROVIDED IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION 05. <br />PART 3 EXECUTION <br />3.1 GENERAL <br />A. MECHANICAL DEMOLITION <br />1. REFER TO DIVISION 1 AND MECHANICAL SECTIONS FOR GENERAL DEMOLITION <br />REQUIREMENTS AND PROCEDURES. <br />2. DISCONNECT, DEMOLISH AND REMOVE MECHANICAL SYSTEMS, EQUIPMENT AND <br />COMPONENTS INDICATED TO BE REMOVED. <br />3. IF PIPE, DUCT, INSULATION, OR EQUIPMENT TO REMAIN IS DAMAGED IN <br />APPEARANCE OR IS UNSERVICEABLE, REMOVE DAMAGED OR UNSERVICEABLE <br />PORTIONS AND REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND <br />QUALITY. <br />B. PIPING SYSTEMS - COMMON REQUIREMENTS <br />1. INSTALL PIPING ACCORDING TO THE FOLLOWING REQUIREMENTS AND DIVISION <br />23 SECTIONS SPECIFYING PIPING SYSTEMS. <br />2. INSTALL PIPING IN CONCEALED LOCATIONS, UNLESS OTHERWISE INDICATED <br />AND EXCEPT IN EQUIPMENT ROOMS AND SERVICE AREAS. <br />3. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT <br />ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING <br />WALLS. DIAGONAL RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED <br />OTHERWISE. <br />4. INSTALL PIPING TO PERMIT VALVE SERVICING. <br />5. SELECT SYSTEM COMPONENTS WITH PRESSURE RATING EQUAL TO OR <br />GREATER THAN SYSTEM OPERATING PRESSURE. <br />6. FIRE -BARRIER PENETRATIONS: MAINTAIN INDICATED FIRE RATING OF WALLS, <br />PARTITIONS, CEILINGS, AND FLOORS AT PIPE PENETRATIONS. SEAL PIPE <br />PENETRATIONS WITH FIRESTOP MATERIALS. REFER TO DIVISION 7 SECTION <br />"THROUGH -PENETRATION FIRESTOP SYSTEMS" FOR MATERIALS. <br />3.2 ACCESS DOORS <br />A. PROVIDE ACCESS DOORS WHERE SPECIALTIES ARE NOT EXPOSED UNLESS <br />INDICATED TO BE PROVIDED UNDER OTHER DIVISIONS. <br />3.3 DIELECTRIC FITTINGS <br />A. PROVIDE DIELECTRIC FITTINGS WHENEVER CONNECTING PIPING OF DISSIMILAR <br />M ETALS. <br />3.4 ESCUTCHEONS <br />A. INSTALL ESCUTCHEONS FOR PENETRATIONS OF WALLS, CEILINGS AND FLOORS IN <br />FINISHED SPACES. <br />3.5 PAINTING <br />A. DAMAGE AND TOUCH-UP: REPAIR MARRED AND DAMAGED FACTORY -PAINTED <br />FINISHES WITH MATERIALS AND PROCEDURES TO MATCH ORIGINAL FACTORY <br />FINISH. <br />3.6 SLEEVES <br />A. PROVIDE SLEEVES FOR ABOVE GRADE DUCT AND PIPING PENETRATIONS OF <br />WALLS, ROOFS AND FLOORS. <br />'SECTION 230529 - HVAC HANGERS AND SUPPORTS <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. PRODUCT DATA FOR SPECIFIED MATERIALS. <br />1.2 QUALITY ASSURANCE. <br />1.3 PERFORMANCE REQUIREMENTS. <br />A. DESIGN SUPPORTS FOR MULTIPLE PIPES, INCLUDING PIPE STANDS, CAPABLE OF <br />SUPPORTING COMBINED WEIGHT OF SUPPORTED SYSTEMS, SYSTEM CONTENTS, <br />AND TEST WATER. <br />B. DESIGN EQUIPMENT SUPPORTS CAPABLE OF SUPPORTING COMBINED OPERATING <br />WEIGHT OF SUPPORTED EQUIPMENT AND CONNECTED SYSTEMS AND <br />COMPONENTS. <br />C. DESIGN SEISMIC -RESTRAINT HANGERS AND SUPPORTS FOR PIPING AND <br />EQUIPMENT. OBTAIN APPROVAL FROM AUTHORITIES HAVING JURISDICTION. <br />PART 2 PRODUCTS <br />2.1 STEEL PIPE HANGERS AND SUPPORTS <br />A. MANUFACTURERS <br />1. CRANE, 2. ERICO/MICHIGAN HANGER CO., 3. FEE AND MASON, 4. GRINNELL <br />CORP., 5. TOLCO INC. <br />B. DESCRIPTION: MSS SP-58, TYPES 1 THROUGH 58, FACTORY -FABRICATED <br />COMPONENTS. <br />C. GALVANIZED, METALLIC COATINGS: PRE -GALVANIZED OR HOT DIPPED. <br />2.2 THERMAL -HANGER SHIELD INSERTS <br />A. MANUFACTURERS <br />1. CARPENTER & PATERSON, INC. <br />2. ERICO/MICHIGAN HANGER CO. <br />3. PIPE SHIELDS, INC. <br />B. DESCRIPTION: 100-PSIG- (690-KPA-) MINIMUM COMPRESSIVE -STRENGTH <br />INSULATION INSERT ENCASED IN SHEET METAL SHIELD <br />PART 3 EXECUTION <br />3.1 HANGER AND SUPPORT APPLICATIONS <br />A. GENERAL <br />1. COMPLY WITH MSS SP-69 FOR PIPE HANGER SELECTIONS AND APPLICATIONS. <br />2. USE HANGERS AND SUPPORTS WITH GALVANIZED, METALLIC COATINGS FOR <br />PIPING AND EQUIPMENT THAT WILL NOT HAVE FIELD -APPLIED FINISH. <br />3. USE NONMETALLIC COATINGS ON ATTACHMENTS FOR ELECTROLYTIC PROTECTION <br />WHERE ATTACHMENTS ARE IN DIRECT CONTACT WITH COPPER TUBING. <br />4. USE POWDER -ACTUATED FASTENERS OR MECHANICAL -EXPANSION ANCHORS <br />INSTEAD OF BUILDING ATTACHMENTS WHERE REQUIRED IN CONCRETE <br />CONSTRUCTION. <br />3.2 HANGER AND SUPPORT INSTALLATION <br />A. STEEL PIPE HANGER INSTALLATION: COMPLY WITH MSS SP-69 AND MSS SP-89. <br />INSTALL HANGERS, SUPPORTS, CLAMPS AND ATTACHMENTS AS REQUIRED TO <br />PROPERLY SUPPORT PIPING FROM BUILDING STRUCTURE. <br />B. THERMAL -HANGER SHIELD INSTALLATION: INSTALL IN PIPE HANGER OR SHIELD FOR <br />INSULATED PIPING. <br />C. EQUIPMENT SUPPORT INSTALLATION: FABRICATE FROM WELDED -STRUCTURAL -STEEL <br />SHAPES. <br />D. INSTALL HANGERS AND SUPPORTS TO ALLOW CONTROLLED THERMAL AND SEISMIC <br />MOVEMENT OF PIPING SYSTEMS, TO PERMIT FREEDOM OF MOVEMENT BETWEEN <br />PIPE ANCHORS AND TO FACILITATE ACTION OF EXPANSION JOINTS, EXPANSION <br />LOOPS, EXPANSION BENDS AND SIMILAR UNITS. <br />E. INSTALL BUILDING ATTACHMENTS WITHIN CONCRETE SLABS OR ATTACH TO <br />STRUCTURAL STEEL. <br />F. INSULATED PIPING: COMPLY WITH THE FOLLOWING: <br />1. ATTACH CLAMPS AND SPACERS TO PIPING. <br />o. PIPING OPERATING ABOVE AMBIENT AIR TEMPERATURE: CLAMP MAY <br />PROJECT THROUGH INSULATION. <br />b. PIPING OPERATING BELOW AMBIENT AIR TEMPERATURE: USE <br />THERMAL -HANGER SHIELD INSERT WITH CLAMP SIZED TO MATCH OD OF <br />INSERT. <br />c. DO NOT EXCEED PIPE STRESS LIMITS ACCORDING TO ASME B31.1 FOR <br />POWER PIPING AND ASME B31.9 FOR BUILDING SERVICES PIPING. <br />3.3 ADJUSTING <br />A. HANGER ADJUSTMENTS: ADJUST HANGERS TO DISTRIBUTE LOADS EQUALLY ON <br />ATTACHMENTS AND TO ACHIEVE INDICATED SLOPE OF PIPE. <br />SECTION 230593 - HVAC TESTING, ADJUSTING AND EALANICING <br />PART 1 GENERAL <br />1.1 SUBMITTALS <br />A. CERTIFIED TAB REPORTS: SUBMIT TWO COPIES OF REPORTS PREPARED, AS <br />SPECIFIED IN THIS SECTION, ON APPROVED FORMS CERTIFIED BY TAB FIRM. <br />B. WARRANTIES SPECIFIED IN THIS SECTION. <br />1.2 QUALITY ASSURANCE <br />A. TAB FIRM QUALIFICATIONS: ENGAGE A TAB FIRM CERTIFIED BY AABC OR NEBB. <br />B. CERTIFICATION OF TAB REPORTS: CERTIFY TAB FIELD DATA REPORTS. THIS <br />CERTIFICATION INCLUDES THE FOLLOWING: <br />1. REVIEW FIELD DATA REPORTS TO VALIDATE ACCURACY OF DATA AND TO <br />PREPARE CERTIFIED TAB REPORTS. <br />2. CERTIFY THAT TAB TEAM COMPLIED WITH APPROVED TAB PLAN AND THE <br />PROCEDURES SPECIFIED AND REFERENCED IN THIS SPECIFICATION. <br />C. TAB REPORT FORMS: USE STANDARD FORMS NEBB'S "PROCEDURAL STANDARDS <br />FOR TESTING, ADJUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS." <br />1.3 COORDINATION <br />A. COORDINATE THE EFFORTS OF FACTORY -AUTHORIZED SERVICE REPRESENTATIVES <br />FOR SYSTEMS AND EQUIPMENT, HVAC CONTROLS INSTALLERS AND OTHER <br />MECHANICS TO OPERATE HVAC SYSTEMS AND EQUIPMENT TO SUPPORT AND ASSIST <br />TAB ACTIVITIES. <br />PART 2 EXECUTION <br />2.1 TAB SPECIALISTS <br />A. APPROVED TAB SPECIALISTS <br />1. NEODORFER ENGINEERS. <br />2. HARDIN & SONS. <br />3. TEST COMM. <br />2.2 EXAMINATION <br />A. GENERAL <br />1. VERIFY THAT SYSTEMS ARE COMPLETE AND OPERABLE BEFORE COMMENCING <br />WORK. ENSURE THAT THE ITEMS ON THE PRE -BALANCE CHECKLIST ARE <br />COMPLETED. <br />2. EXAMINE SYSTEM AND EQUIPMENT INSTALLATIONS AND VERIFY THAT FIELD <br />QUALITY -CONTROL TESTING, CLEANING AND ADJUSTING SPECIFIED IN INDIVIDUAL <br />SECTIONS HAVE BEEN PERFORMED. <br />3. EXAMINE TEST REPORTS SPECIFIED IN INDIVIDUAL SYSTEM AND EQUIPMENT <br />SECTIONS. <br />2% Ocl!<es �,ve. <br />Suite "100 <br />Everett, W"\ 98991 <br />"li E �tgr 13s 10 MI <br />(3 S, t a n t.'', e, c <br />4100 194th Street Sid Suite 400 <br />Lynnwood Washington 98036-4613 <br />(206) 667-0555 <br />Copyright Reserved <br />The Contractor shall verify and be responsible for all dimensions. DO <br />NOT scale the drawing - any errors or omissions shall be reported to <br />Stantec without delay. <br />The Copyrights to all designs and drawings are the property of <br />Stantec. Reproduction or use for any purpose other than that <br />authorized by Stantec is forbidden. <br />r <br />JOB NO <br />DRAWN BY <br />CHECKED SY <br />� d <br />�� <br />rm <br />111--08- i1 <br />S P EC !11 1 CA ,I,II � 0 N S <br />III,. <br />r I`li I r, FIT% <br />