|
ABBREVIATIONS
<br />#
<br />NUMBER
<br />GA
<br />GAUGE, GYPSUM ASSOCIATION
<br />PLAM
<br />PLASTIC LAMINATE
<br />&
<br />AND
<br />GAL
<br />GALVANIZED
<br />PL
<br />PLATE, PROPERTY LINE
<br />CENTERLINE
<br />GB
<br />GRAB BAR
<br />PLYWD
<br />PLYWOOD
<br />GPM
<br />GALLONS PER MINUTE
<br />PNL
<br />PANEL_
<br />AC
<br />ACRE
<br />GYP
<br />GYPSUM
<br />PNT
<br />PAINT
<br />ACC
<br />ACCESSIBLE
<br />PR
<br />PAIR
<br />AED
<br />AUTOMATED
<br />HB
<br />HOSE BIB
<br />PREFIN
<br />PREFINISHED
<br />EXTERNAL
<br />HC-PHB
<br />HOLLOW CORE PRIMED
<br />PREPR
<br />PRE -PRIMED
<br />DEFIBRILLATOR
<br />HARDBOARD
<br />PT
<br />PRESSURE TREATED, POST
<br />AFF
<br />ABOVE FINISH FLOOR
<br />HDR
<br />HEADER
<br />TENSION
<br />ADJ
<br />ADJUSTABLE
<br />HDW
<br />HARDWARE
<br />AHU
<br />AIR HANDLING UNIT
<br />HM
<br />HOLLOW METAL
<br />R
<br />RISER, RADIUS
<br />ALUM
<br />ALUMINUM
<br />HORIZ
<br />HORIZONTAL
<br />R & S
<br />ROD AND SHELF
<br />APPROX APPROXIMATE
<br />HR
<br />HOUR
<br />RCP
<br />REFLECTED CEILING PLAN(S)
<br />APT
<br />APARTMENT
<br />HVAC
<br />HEATING VENTILATION AND AIR
<br />RD
<br />ROOF DRAIN
<br />CONDITIONING
<br />REF
<br />REFERENCE
<br />BD
<br />BOARD
<br />REFL
<br />REFLECTED
<br />BDRM
<br />BEDROOM
<br />IBC
<br />INTERNATIONAL BUILDING
<br />REFR
<br />REFRIGERATOR
<br />BLDG
<br />BUILDING
<br />CODE
<br />READ
<br />REQUIRED
<br />BLKG
<br />BLOCKING
<br />IN
<br />INCH
<br />R/R
<br />RESTROOM
<br />BM
<br />BEAM
<br />INFO
<br />INFORMATION
<br />RM
<br />ROOM
<br />BOT
<br />BOTTOM
<br />INSUL
<br />INSULATE(D), (ION)
<br />RO
<br />ROUGH OPENING
<br />BR
<br />BEDROOM
<br />INT
<br />INTERIOR
<br />SAMF
<br />SELF -ADHERING MEMBRANE
<br />CIP
<br />CAST -IN -PLACE
<br />JAN
<br />JANITOR'S
<br />FLASHING
<br />CJ
<br />CONTROL JOINT
<br />JST
<br />JOIST
<br />SD
<br />SMOKE DETECTOR
<br />CL
<br />CLOSET
<br />SF
<br />SQUARE FOOT
<br />CLG
<br />CEILING
<br />KDHM
<br />KNOCK -DOWN HOLLOW METAL
<br />SHTHG
<br />SHEATHING
<br />CLR
<br />CLEARANCE)
<br />KIT
<br />KITCHEN
<br />SIM
<br />SIMILAR
<br />CMU
<br />CONCRETE MASONRY UNIT
<br />SPEC
<br />SPECIFICATION
<br />CPT
<br />CARPET
<br />LAM
<br />LAMINATE
<br />STD
<br />STANDARD
<br />COIL
<br />COLUMNS
<br />LAUN
<br />LAUNDRY
<br />STIL
<br />STEEL
<br />CONT
<br />CONTINUOUS
<br />LID
<br />LOAD
<br />STOR
<br />STORAGE
<br />CONC
<br />CONCRETE
<br />LGT
<br />LIGHT
<br />STC
<br />SOUND TRANSMISSION CLASS
<br />CGRR
<br />CORRIDOR
<br />LN
<br />LINEN
<br />STRUCT
<br />STRUCTURAL
<br />LVT
<br />LUXURY VINYL TILE
<br />SV
<br />SHEET VINYL
<br />D
<br />DRYER
<br />LW
<br />LIVE/WORK
<br />DBL
<br />DOUBLE
<br />T
<br />TREAD, TEMPERED
<br />DF
<br />DRINKING FOUNTAIN
<br />MAINT
<br />MAINTENANCE
<br />T & G
<br />TONGUE & GROOVE
<br />DIA
<br />DIAMETER
<br />MAIL
<br />MATERIAL
<br />TB
<br />TOWEL BAR
<br />DIM
<br />DIMENSION
<br />MAX
<br />MAXIMUM
<br />TG
<br />TEMPERED GLASS
<br />DN
<br />DOWN
<br />MDF
<br />MEDIUM DENSITY FIBERBOARD
<br />THK
<br />THICK, THICKNESS
<br />DR
<br />DOOR
<br />MECH
<br />MECHANICAL
<br />TO
<br />TOP OF
<br />DS
<br />DOWN SPOUT
<br />MEMB
<br />MEMBRANE
<br />TP
<br />TOILET PAPER
<br />DU
<br />DWELLING UNIT
<br />MFR
<br />MANUFACTURER
<br />T/S
<br />TUB/SHOWER
<br />DW
<br />DISHY/DASHER
<br />MIN
<br />MINIMUM
<br />TYP
<br />TYPICAL
<br />DWG
<br />DRAWING
<br />MIRR
<br />MIRRORED)
<br />MISC
<br />MISCELLANEOUS
<br />UNO
<br />UNLESS NOTED OTHERWISE
<br />EA
<br />EACH
<br />MTL
<br />METAL
<br />UNFIN
<br />UNFINISHED
<br />EJ
<br />EXPANSION JOINT
<br />EL
<br />ELEVATION
<br />N
<br />NORTH
<br />VCT
<br />VINYL COMPOSITION TILE
<br />_FL EC
<br />ELECTRICAL
<br />NA
<br />NOT APPLICABLE
<br />VERT
<br />VERTICAL
<br />ELEV
<br />ELEVATOR
<br />NIC
<br />NOT IN CONTRACT
<br />VRFY
<br />VERIFY
<br />EP
<br />ELECTRICAL PANEL
<br />NO
<br />NUMBER
<br />EQUIP
<br />EQUIPMENT
<br />NR
<br />NON RATED
<br />W
<br />WASHER
<br />EQ
<br />EQUAL
<br />NTS
<br />NOT TO SCALE
<br />W/
<br />WITH
<br />(E)
<br />EXISTING
<br />WD
<br />WOOD
<br />EXT
<br />EXTERIOR
<br />0C
<br />ON CENTER
<br />WH
<br />WATER HEATER
<br />OCC
<br />OCCUPANT(S), OCCUPANCY,
<br />WIC
<br />WALK IN CLOSET
<br />FCP
<br />FIBER CEMENT PANEL
<br />(IES)
<br />WIN
<br />WINDOW
<br />FD
<br />FLOOR DRAIN
<br />OL F
<br />OCCUPANT LOAD FACTOR
<br />WP
<br />WATERPROOF
<br />FEC
<br />FIRE EXTINGUISHER CABINET
<br />OPP
<br />OPPOSITE
<br />WR
<br />WATER RESISTANT
<br />FIN
<br />FINISH
<br />OPNG
<br />OPENING
<br />WRB
<br />WATER RESISTANT BARRIER
<br />FIR
<br />FLOOR
<br />ORD
<br />OVERFLOW ROOF DRAIN
<br />FND
<br />FOUNDATION
<br />OSB
<br />ORIENTED STRAND BOARD
<br />FO
<br />FACE OF
<br />OSSC
<br />OREGON STRUCTURAL
<br />FOC
<br />FACE OF CONCRETE
<br />SPECIALTY CODE
<br />FOF
<br />FACE OF FINISH
<br />OVFL
<br />OVERFLOW
<br />FOS
<br />FACE OF STUD
<br />FOW
<br />FACE OF WALL
<br />FT
<br />FEET
<br />FTG
<br />FOOTING WALL
<br />ASSEMBLY TAG
<br />WINDOW TAG
<br />Al
<br />DOOR TAG
<br />NORTH ARROW
<br />1 U8.O
<br />DETAILTAGS
<br />EXTERIOR ELEVATION TAG
<br />INTERIOR ELEVATION TAG
<br />1 /%,
<br />A4.01 A4,01 BUILDING SECTION TAG
<br />z1 _� WALL SECTION TAG
<br />A4,11
<br />TOP OF SLAB
<br />100'-0" ELEVATION DATUM
<br />GRID LINE/ GRID BUBBLE
<br />4 E
<br />Sheet
<br />Number
<br />Sheet Name
<br />GENERAL
<br />G0.00
<br />COVER SHEET
<br />G0.01
<br />SHEET INDEX, ABBREVIATIONS, AND SYMBOLS
<br />G1.01
<br />CODE SUMMARY
<br />G2,01
<br />FIRE LIFE SAFETY PLAN - LEVEL 01
<br />G2.02
<br />FIRE LIFE SAFETY PLAN - LEVEL 02
<br />G3.01
<br />ACCESSIBILITY DETAILS
<br />G4.01
<br />SITE PLAN
<br />DEMOLITION
<br />D1.01 a
<br />DEMO PLAN - LEVEL 01 - A
<br />D1.01 b
<br />DEMO PLAN - LEVEL 01 - B
<br />D1.02a
<br />DEMO PLAN - LEVEL 02 - A
<br />D1.02b
<br />DEMO PLAN - LEVEL 02 - B
<br />D1.03
<br />DEMO PLAN - ROOF
<br />D2.01
<br />DEMO ELEVATIONS
<br />CIVIL
<br />C0.01
<br />NOTES AND LEGEND
<br />C0.02
<br />CITY OF EVERETT STANDARD NOTES
<br />C0.03
<br />EXISTING CONDITIONS AND SURVEY CONTROL PLAN
<br />C0.04
<br />EXISTING CONDITIONS AND SURVEY CONTROL PLAN
<br />C1.01
<br />TESC PLAN
<br />C1.02
<br />SITE DEMOLITION PLAN
<br />C2.01
<br />CIVIULANDSCAPE OVERVIEW SITE PLAN
<br />C3.01
<br />PAVING PLAN
<br />C3,02
<br />PAVING PLAN
<br />C3.03
<br />SITE GRADING PLAN
<br />C3.04
<br />SITE GRADING PLAN
<br />C3.05
<br />SITE LAYOUT POINT TABLE
<br />C3.06
<br />PLAZA AND SIDEWALK GRADING PLAN
<br />n�
<br />C4,01
<br />DRAINAGE PLAN
<br />M
<br />C4.02
<br />DRAINAGE PLAN
<br />0-
<br />C4,03
<br />DRAINAGE PROFILES
<br />�
<br />C4,04
<br />DRAINAGE DETAILS
<br />C4.05
<br />DRAINAGE DETAILS
<br />C4.06
<br />STORMWATER DETENTION VAULT PLAN
<br />M
<br />C4.07
<br />STORMWATER DETENTION VAULT SECTION
<br />C4.08
<br />STORMWATER DETENTION VAULT DETAILS
<br />C4,09
<br />STORMWATER TREATMENT FACILITY PLAN
<br />®
<br />C410
<br />STORMWATER TREATMENT FACILITY
<br />C5.01
<br />WATER AND SEWER PLAN
<br />C5.02
<br />WATER AND SEWER PLAN
<br />C6.01
<br />SIGNING AND STRIPING PLAN
<br />C6.02
<br />SIGN SCHEDULE AND STRIPING DETAILS
<br />C7.01
<br />PAVEMENT AND SIDEWALK DETAILS
<br />C7.02
<br />CONCRETE WALL AND STAIR DETAILS I
<br />C7,03
<br />CONCRETE WALL AND STAIR DETAILS 11
<br />C7.04
<br />WALL DETAILS
<br />LANDSCAPE
<br />L1.01
<br />PLAZA HARDSCAPE PLAN
<br />L1,02
<br />LANDSCAPE SITE DETAILS
<br />L2.01
<br />PLANTING PLAN
<br />L2.02
<br />PLANTING PLAN
<br />1_2.03
<br />LANDSCAPE SCHEDULE &DETAILS
<br />L3,01
<br />IRRIGATION PLAN
<br />L3.02
<br />IRRIGATION PLAN
<br />L3.03
<br />IRRIGATION DETAILS I
<br />1-104
<br />IRRIGATION DETAILS 11
<br />L3.05
<br />IRRIGATION DETAILS III
<br />STRUCTURAL
<br />S0,00
<br />STRUCTURAL COVER SHEET
<br />S0.01
<br />GENERAL STRUCTURAL NOTES
<br />S0.02
<br />GENERAL STRUCTURAL NOTES
<br />S0.03
<br />SPECIAL INSPECTIONS
<br />S2.01
<br />FOUNDATION PLAN - OVERALL
<br />S2.01 a
<br />FOUNDATION PLAN -A
<br />S2.01 b
<br />FOUNDATION PLAN - B
<br />S2.02
<br />SECOND FLOOR PLAN - OVERALL
<br />S2.02a
<br />SECOND FLOOR FRAMING PLAN - A
<br />S2,02b
<br />SECOND FLOOR FRAMING PLAN - B
<br />S2.03
<br />ROOF PLAN - OVERALL
<br />S2.03a
<br />ROOF FRAMING PLAN -A
<br />S2.03b
<br />ROOF FRAMING PLAN - B
<br />S2.04
<br />ENLARGED PLANS
<br />S2,05
<br />ENLARGED PLANS
<br />S2.06
<br />ENLARGED PLANS
<br />S3.01a
<br />BUILDING ELEVATIONS -A
<br />S3.01b
<br />BUILDING ELEVATIONS - B
<br />S3.02
<br />ENLARGED ELEVATIONS
<br />S3,03
<br />ENTRY VESTIBULE SECTIONS
<br />S4.00
<br />STAIR PLANS AND SECTIONS
<br />S4.01
<br />STAIR PLANS AND SECTIONS
<br />S4.10
<br />STAIR AND ELEVATOR DETAILS
<br />S5.01
<br />FOUNDATION DETAILS
<br />S5.02
<br />FOUNDATION DETAILS
<br />D
<br />AAS5,
<br />FOUN ATION DETAILS
<br />01
<br />M1 E - D
<br />S6.02
<br />FRAMING DETAILS - WOOD
<br />S6.03
<br />FRAMING DETAILS - WOOD
<br />S6.04
<br />FRAMING DETAILS - WOOD
<br />%05
<br />FRAMING DETAILS - WOOD
<br />S6.06
<br />FRAMING DETAILS -WOOD
<br />S6,11
<br />FRAMING DETAILS - CFS
<br />FR IN1 CF
<br />B
<br />�%1�3FRAMIILS
<br />- FS
<br />M
<br />Sheet
<br />Number Sheet Name
<br />ARCHITECTURE
<br />A1.01
<br />CONSTRUCTION ASSEMBLIES
<br />A1.11
<br />DOOR SCHEDULE & TYPES
<br />A1.12
<br />WINDOW SCHEDULE & TYPES
<br />A2.01
<br />PLAN - LEVEL 01 - OVERALL
<br />A2.01 s
<br />SLAB PLAN - LEVEL 01
<br />A2.01 a
<br />PLAN - LEVEL 01 - A
<br />A2.01 b
<br />PLAN - LEVEL 01 - B
<br />A2.02
<br />PLAN - LEVEL 02 - OVERALL
<br />A2.02a
<br />PLAN - LEVEL 02 - A
<br />A2.02b
<br />PLAN - LEVEL 02 - B
<br />A2.03
<br />ROOF PLAN
<br />A3.01
<br />EXTERIOR ELEVATIONS
<br />A3,02
<br />EXTERIOR ELEVATIONS
<br />A3.03
<br />EXTERIOR ELEVATIONS
<br />A3.04
<br />EXTERIOR ELEVATIONS
<br />A4.01
<br />BUILDING SECTIONS
<br />A4.02
<br />BUILDING SECTIONS
<br />A4.03
<br />WALL SECTIONS
<br />A4,04
<br />WALL SECTIONS
<br />A4.05
<br />WALL SECTIONS
<br />A4.06
<br />WALL SECTIONS - INTERIOR
<br />A4.07
<br />WALL SECTIONS - INTERIOR
<br />A5.01 a
<br />RCP - LEVEL 01 - A
<br />A5.01 b
<br />RCP - LEVEL 01 - B
<br />A5.02a
<br />RCP - LEVEL 02 - A
<br />A5.02b
<br />RCP - LEVEL 02 - B
<br />A6.01
<br />ENLARGED PLANS - MAIN ENTRY AND EAST ADDITION
<br />A6.02
<br />STAIR AND ELEVATOR PLANS AND SECTIONS
<br />A6.03
<br />STAIR AND ELEVATOR PLANS AND SECTIONS
<br />A6.04
<br />ENLARGED PLANS
<br />A6.05
<br />ENLARGED PLANS
<br />A6.06
<br />ENLARGED PLANS
<br />A7.01
<br />INTERIOR ELEVATIONS
<br />A8.01
<br />EXTERIOR DETAILS
<br />A8.02
<br />EXTERIOR DETAILS
<br />A8.03
<br />EXTERIOR DETAILS
<br />A8.04
<br />EXTERIOR DETAILS
<br />A8.05
<br />EXTERIOR DETAILS
<br />A8.06
<br />EXTERIOR ROOF DETAILS
<br />A8.11
<br />INTERIOR DETAILS
<br />A8.12
<br />INTERIOR DETAILS
<br />A8.13
<br />INTERIOR DETAILS
<br />A8.14
<br />FIRE RATED WALL ASSEMBLIES
<br />INTERIORS
<br />ID1,01
<br />ENLARGED FLOOR PLANS
<br />ID2.01
<br />INTERIOR ELEVATIONS
<br />ID2.02
<br />INTERIOR ELEVATIONS
<br />1D2.03
<br />INTERIOR ELEVATIONS
<br />ID2.04
<br />INTERIOR ELEVATIONS
<br />ID2.05
<br />INTERIOR ELEVATIONS
<br />D2.�7
<br />INTE IOR ELEVATIONS
<br />rID2.09
<br />D2.08
<br />INTERIOR DETAIL S
<br />INTERIOR DETAILSD2.
<br />0
<br />RIDETAILS s
<br />"ER
<br />C
<br />3,0
<br />FI SC UL
<br />ID3.04a
<br />INTERIOR FINISH PLAN - LEVEL 01 - A
<br />ID3.04b
<br />INTERIOR FINISH PLAN - LEVEL 01 - B
<br />ID3.05a
<br />INTERIOR FINISH PLAN - LEVEL 02 - A
<br />ID3.05b
<br />INTERIOR FINISH PLAN - LEVEL_ 02 - B
<br />ID3,06a
<br />REFERENCE PLAN - LEVEL - 01- A
<br />ID3.06b
<br />REFERENCE PLAN - LEVEL - 01 - B
<br />03,07a
<br />REFERENCE PLAN - LEVEL - 02 - A
<br />ID3.07b
<br />REFERENCE PLAN - LEVEL - 02 - B
<br />FIRE PROTECTION
<br />FP0,01
<br />FIRE PROTECTION LEGEND AND SHEET INDEX
<br />FD2.01
<br />FIRE PROTECTION ZONE PLANS - OVERALL DEMO
<br />FP2,01
<br />FIRE PROTECTION ZONE PLANS - OVERALL
<br />FP5.01
<br />FIRE PROTECTION DIAGRAMS
<br />PLUMBING
<br />W
<br />P0.01
<br />PLUMBING LEGEND AND INDEX
<br />PD2.00
<br />PLUMBING DEMOLITION PLAN - FOUNDATION - OVERALL
<br />0-
<br />PD2,01
<br />PLUMBING DEMOLITION PLAN - LEVEL 01 - OVERALL
<br />LLJ
<br />PD2.02
<br />PLUMBING DEMOLITION PLAN - LEVEL 02 - OVERALL
<br />P2.00a
<br />PLUMBING PLAN - FOUNDATION - A
<br />P2.00b
<br />PLUMBING PLAN - FOUNDATION - B
<br />P2.01 a
<br />PLUMBING PLAN - LEVEL 01 - A
<br />Uj
<br />(7)
<br />P2.01b
<br />PLUMBING PLAN - LEVEL 01 - B
<br />Q�
<br />P2.02a
<br />PLUMBING PLAN - LEVEL 02 - A
<br />P2.02b
<br />PLUMBING PLAN - LEVEL 02 - B
<br />P2.03
<br />PLUMBING PLAN - ROOF
<br />P4,01
<br />ENLARGED PLANS
<br />P4.02
<br />ENLARGED PLANS
<br />P5:01
<br />PLUMBING DETAILS
<br />P6.01
<br />PLUMBING SCHEDULES
<br />P7,01
<br />PLUMBING DIAGRAMS
<br />P7.02
<br />PLUMBING DIAGRAMS
<br />P7,03
<br />PLUMBING DIAGRAMS - NORTH
<br />PT04
<br />PLUMBING DIAGRAMS - SOUTH
<br />b LO
<br />�r L
<br />6
<br />CDUj 0
<br />"
<br />Sheet
<br />® QjQ.
<br />,
<br />®®
<br />Number Sheet Name
<br />�, Q
<br />MECHANICAL
<br />M 1 FN AN D
<br />0.0
<br />HVAC LEGS D DIN EX
<br />x
<br />M0.02
<br />2015WSEC COMPLIANCE
<br />x "
<br />MD2.01 a
<br />HVAC DEMO PLAN - LEVEL 01 - A
<br />x
<br />MD2.01 b
<br />HVAC DEMO PLAN - LEVEL 01 - B
<br />x ,
<br />MD2.02a
<br />HVAC DEMO PLAN - LEVEL 02 - A
<br />x
<br />MD2.02b
<br />HVAC DEMO PLAN - LEVEL 02 - B
<br />x
<br />MD2.03
<br />HVAC DEMO PLAN - ROOF - OVERALL
<br />x
<br />M1.00
<br />HVAC ZONING PLANS - OVERALL
<br />M2.01a
<br />HVAC FLOOR PLAN - LEVEL 01 -A
<br />x
<br />x
<br />M2.01 b
<br />HVAC FLOOR PLAN - LEVEL 01 - B
<br />x
<br />x
<br />M2.02a
<br />HVAC FLOOR PLAN - LEVEL 02 - A
<br />x
<br />x
<br />M2.02b
<br />HVAC FLOOR PLAN - LEVEL 02 - B
<br />x
<br />M2.03a
<br />HVAC ROOF PLAN - A
<br />x
<br />M2.03b
<br />HVAC ROOF PLAN - B
<br />x
<br />x
<br />M2.11 a
<br />HVAC PIPING FLOOR PLAN - LEVEI 01 -A
<br />x
<br />x
<br />M2.11 b
<br />HVAC PIPING FLOOR PLAN - LEVEL 01 - B
<br />x
<br />x:
<br />M2.12a
<br />HVAC PIPING FLOOR PLAN - LEVEL 02 - A
<br />x
<br />x
<br />M2.12b
<br />HVAC PIPING FLOOR PLAN - LEVEL 02 - B
<br />x
<br />x
<br />M4.01
<br />ENLARGED PLANS
<br />x
<br />x
<br />M4.02
<br />ENLARGED PLANS
<br />x
<br />x
<br />M4.03
<br />ENLARGED PLANS
<br />x
<br />x
<br />M4.04
<br />HVAC SECTIONS
<br />x
<br />M4,05
<br />HVAC SECTIONS
<br />x
<br />M4.06
<br />HVAC SECTIONS
<br />x
<br />M4.07
<br />ENLARGED PLANS
<br />x
<br />x
<br />M4.08
<br />HVAC SECTIONS
<br />x
<br />x
<br />M5.01
<br />HVAC DETAILS
<br />x
<br />M5.02
<br />HVAC DETAILS
<br />x
<br />M5.03
<br />AIR HANDLER & CRAC DETAILS
<br />x
<br />x
<br />%01
<br />HVAC SCHEDULES
<br />x ,
<br />x
<br />M6,02
<br />HVAC SCHEDULES
<br />x `
<br />x
<br />0�
<br />M6.03
<br />HVAC SCHEDULES
<br />x
<br />x
<br />M7.01
<br />HVAC DIAGRAMS
<br />x
<br />x
<br />M8.01
<br />CONTROLS
<br />x
<br />M8,02
<br />CONTROLS
<br />x
<br />M8.03
<br />CONTROLS
<br />x
<br />M8.04
<br />CONTROLS
<br />x
<br />CL
<br />W
<br />M8.05
<br />CONTROLS
<br />x '
<br />x
<br />W
<br />ELECTRICAL
<br />0
<br />E0.01
<br />ELECTRICAL SYMBOLS AND ABBREVIATIONS
<br />x
<br />z
<br />E1.00
<br />ELECTRICAL DEMOLITION PLAN - SITE
<br />x
<br />E1,01
<br />ELECTRICAL DEMOLITION PLAN - LEVEL 01
<br />x `
<br />E1.02
<br />ELECTRICAL DEMOLITION PLAN - LEVEL 02
<br />x
<br />E1.03
<br />ELECTRICAL DEMOLITION PLAN - ROOF
<br />x
<br />E2.01
<br />ELECTRICAL SITE PLAN
<br />x
<br />x
<br />E3.01 a
<br />POWER PLAN - LEVEL 01 - A
<br />x
<br />x
<br />E3.01 b
<br />POWER PLAN - LEVEL 01 - B
<br />x
<br />x
<br />E3.02a
<br />POWER PLAN - LEVEL 02 - A
<br />x
<br />x
<br />E3.02b
<br />POWER PLAN - LEVEL 02 - 8
<br />x
<br />x
<br />E3.03
<br />POWER PLAN - ROOF
<br />x
<br />E3.11 a
<br />LIGHTING PLAN - LEVEL 01 - A
<br />x
<br />E3A 1b
<br />LIGHTING PLAN - LEVEL 01 - B
<br />x
<br />E3.12a
<br />LIGHTING PLAN - LEVEL 02-A
<br />x
<br />E3.12b
<br />LIGHTING PLAN - LEVEL 02 - B
<br />x
<br />E4.01
<br />ENLARGED PLAN - ELECTRICAL._. ROOM
<br />x
<br />E5.01
<br />ELECTRICAL DETAILS
<br />x ,
<br />E6.01
<br />ONE -LINE DIAGRAM - DEMOLITION
<br />x
<br />E6.02
<br />ONE -LINE DIAGRAM - CONSTRUCTION
<br />x
<br />E6.04
<br />PANEL SCHEDULES
<br />x ;
<br />E6.05
<br />PANELSCHEDULES
<br />x
<br />E6.06
<br />PANEL SCHEDULES
<br />x
<br />x
<br />E6.07
<br />PANEL SCHEDULES
<br />x
<br />x
<br />E6,08
<br />PANEL SCHEDULES
<br />x
<br />E7.01
<br />LUMINAIRE SCHEDULE
<br />x
<br />E7.02
<br />LUMINAIRE SCHEDULE
<br />x <
<br />E7.03
<br />LUMINAIRE SCHEDULE
<br />x ,
<br />E7.04
<br />LUMINAIRE SCHEDULE
<br />x
<br />E7.05
<br />LIGHT POLE AND EXISTING LUMINAIRE SCHEDULES
<br />x .
<br />E8.01
<br />LIGHTING CONTROL SCHEDULE & ABBREVIATIONS
<br />x
<br />E8A 1 a
<br />LIGHTING CONTROL PLAN - LEVEL 01 - A
<br />x
<br />E8.11 b
<br />LIGHTING CONTROL PLAN - LEVEL 01 - B
<br />x
<br />E8.12a
<br />LIGHTING CONTROL PLAN - LEVEL 02 - A
<br />x `
<br />E8.12b
<br />LIGHTING CONTROL PLAN - LEVEL 02 - B
<br />x
<br />ELECTRICAL
<br />- DATA CENTER
<br />E9.01
<br />COVER SHEET AND DRAWING INDEX
<br />x
<br />E9.02
<br />SYMBOLS LEGEND, ABBREVIATIONS AND PROJECT GENERAL
<br />NOTES
<br />x
<br />E9.03
<br />FEEDER AND BRANCH CIRCUIT SCHEDULES
<br />x
<br />E9,04
<br />EXISTING UPS LOAD HISTORY
<br />x
<br />E9.05
<br />EXISTING UPS LOAD HISTORY & BASIC SPECIFICATIONS
<br />x
<br />E9.10
<br />PARTIAL ONE -LINE DIAGRAM
<br />x
<br />E9.20
<br />POWER & GROUNDING PLAN
<br />x
<br />E9.30
<br />LIGHTING PLAN, PHOTOMETRIC PLAN AND FIXTURE
<br />SCHEDULE
<br />x
<br />E9.40
<br />PANEL SCHEDULES
<br />x
<br />'t
<br />LO
<br />Sheet
<br />Number
<br />Sheet Name
<br />o p
<br />a
<br />o
<br />�'
<br />COMMUNICATIONS SYSTEM
<br />-LA-00
<br />DRAWING INDEX
<br />x
<br />x
<br />T-A-01
<br />SYMBOLS, ABBREVIATIONS AND NOTES
<br />x
<br />T-D-11
<br />LEVEL 1 COMMUNICATIONS PATHWAY PLAN - OVERALL
<br />x
<br />T-D-11A
<br />LEVEL 1 COMMUNICATIONS PATHWAY PLAN - A
<br />x
<br />T-D-11 B
<br />LEVEL 1 COMMUNICATIONS PATHWAY PLAN - B
<br />x
<br />T-D-12
<br />LEVEL 1 WORKSTATION OUTLET PLAN - OVERALL
<br />x
<br />x
<br />T-D-12A
<br />LEVEL 1 WORKSTATION OUTLET PLAN - A
<br />x
<br />x
<br />T-D-12B
<br />LEVEL 1 WORKSTATION OUTLET PLAN - B
<br />x
<br />x
<br />T-D-13
<br />LEVEL 1 COMMUNICATIONS WIRELESS LAYOUT - OVERALL
<br />x
<br />T-D-13A
<br />LEVEL 1 COMMUNICATIONS WIRELESS LAYOUT -A
<br />x
<br />T-D-1313
<br />LEVEL 1 COMMUNICATIONS WIRELESS LAYOUT - B
<br />x
<br />T-D-21
<br />LEVEL 2 COMMUNICATIONS PATHWAY PLAN - OVERALL
<br />x
<br />T-D-21A
<br />LEVEL 2 COMMUNICATIONS PATHWAY PLAN - A
<br />x
<br />T-D-21 B
<br />LEVEL 2 COMMUNICATIONS PATHWAY PLAN - B
<br />x
<br />T-D-22
<br />LEVEL 2 WORKSTATION OUTLET PLAN - OVERALL
<br />x
<br />x
<br />j
<br />T-D-22A
<br />LEVEL 2 WORKSTATION OUTLET PLAN - A
<br />x
<br />x
<br />T-D-2213
<br />LEVEL 2 WORKSTATION OUTLET PLAN - B
<br />x
<br />x
<br />T-D-23
<br />LEVEL 2 COMMUNICATIONS WIRELESS LAYOUT - OVERALL
<br />x
<br />T-D-23A
<br />LEVEL 2 COMMUNICATIONS WIRELESS LAYOUT - A
<br />x
<br />T-D-23B
<br />LEVER COMMUNICATIONS WIRELESS LAYOUT B
<br />x
<br />-F E-011
<br />LEVEL 1 DATA CENTER 116 LAYOUT
<br />x
<br />T-E-012
<br />LEVEL 1 DATA CENTER 116 LAYOUT
<br />x
<br />T-E-013
<br />LEVEL 1 DATA CENTER 116 FIBER ONE -LINE DIAGRAM
<br />x
<br />T-E-014
<br />LEVEL 1 OF ELEC ROOM 078 LAYOUT
<br />x
<br />T-E-015
<br />LEVEL 1 IDF CBLE ROOM 068 LAYOUT
<br />x'
<br />T-E-021
<br />LEVEL 2 OF CABLE ROOM 204 LAYOUT
<br />x
<br />T-E-022
<br />LEVEL 21DF 5 CABLE ROOM 296 LAYOUT
<br />x
<br />T-F-01
<br />FIBER ONE LINE DIAGRAM
<br />x
<br />T-F-02
<br />GROUNDING ONE LINE DIAGRAM
<br />x ,
<br />T-F-03
<br />CONDUIT ONE LINE DIAGRAM
<br />x
<br />T-G-01
<br />COMf`u7UNICATIONS DETAILS
<br />x .
<br />W
<br />T-G-02
<br />COMMUNICATIONS DETAILS
<br />x
<br />W
<br />T-G-03
<br />COMMUNICATIONS DETAILS
<br />x
<br />W
<br />T-G-04
<br />TYPICAL LABELING DETAILS
<br />x
<br />A/V SYSTEM
<br />AV-A-00
<br />DRAWING INDEX
<br />x
<br />x
<br />W
<br />AV-A-001
<br />SYMBOLS, ABBREVIATIONS AND NOTES
<br />x
<br />AV -010
<br />LEVEL 1 AV PLAN -OVERALL
<br />x
<br />x
<br />M
<br />AV-D 01A
<br />LEVEL 1 AV PLAN A
<br />x
<br />C
<br />AV-D-01 B
<br />LEVEL 1 AV PLAN - B
<br />x
<br />x
<br />AV-D-01
<br />LEVEL 2 AV PLAN - OVERALL
<br />x
<br />AV-D-02A
<br />LEVEL 2 AV PLAN - A
<br />x
<br />AV- -02B
<br />LEVEL 2 AV PLAN - B
<br />x
<br />O
<br />-G- 01
<br />AV DETAILS
<br />x
<br />AV-G-002
<br />AV DETAILS
<br />x ,
<br />AV-G-003
<br />AV DETAILS
<br />x .
<br />AV-G-004
<br />AV DETAILS
<br />x
<br />AV-G-005
<br />AV DETAILS
<br />x
<br />AV-G-006
<br />AV DETAILS
<br />x
<br />AV-G-007
<br />AV DETAILS
<br />x
<br />SECURITY SYSTEM
<br />S-A-000
<br />DRAWING INDEX
<br />x
<br />x
<br />S-A-001
<br />SYMBOLS, ABBREVIATIONS AND NOTES
<br />x
<br />S-D-001
<br />SITE SECURITY EXTERIOR PLAN
<br />x
<br />x .
<br />S-D-010
<br />LEVEL 1 INTERIOR SECURITY PLAN - OVERALL
<br />x
<br />x
<br />S-D-01A
<br />LEVEL 1 INTERIOR SECURITY PLAN - A
<br />x
<br />x
<br />S D 01 B
<br />LEVEL 1 INTERIOR SECURITY PLAN B
<br />x
<br />x
<br />S-D-020
<br />LEVEL 2 INTERIOR SECURITY PLAN - OVERALL
<br />x
<br />x
<br />S-D-02A
<br />LEVEL 2 INTERIOR SECURITY PLAN - A
<br />x
<br />x
<br />S-D-02B
<br />LEVEL 2 INTERIOR SECURITY PLAN - B
<br />x
<br />x,
<br />S-G-001
<br />SECURITY DETAILS
<br />x
<br />S-G-002
<br />SECURITY DETAILS
<br />x
<br />S-G-003
<br />SECURITY DETAILS
<br />x
<br />S-G-004
<br />SECURITY DETAILS
<br />x ;
<br />S-G-005
<br />SECURITY DETAILS
<br />x
<br />S-G-006
<br />SECURITY DETAILS
<br />x
<br />SOUND MASKING SYSTEM
<br />SMq.00
<br />COVER SHEET, INDEX, ABBREVIATIONS & SCHEDULE OF
<br />SCOPE
<br />x
<br />SM0.01
<br />SYMBOL LEGEND
<br />x
<br />SM0:02
<br />OVERVIEW LEVEL 01
<br />x
<br />SM0.03
<br />OVERVIEW LEVEL 02
<br />x
<br />}
<br />SM1.00
<br />SOUND MASKING - LEVEL 01 - A RCP
<br />x
<br />SM1.01
<br />SOUND MASKING - LEVEL 01- B RCP
<br />x
<br />SM1.02
<br />SOUND MASKING - LEVEL 02 - A RCP
<br />x
<br />SM1.03
<br />SOUND MASKING - LEVEL 02 - B RCP
<br />x
<br />SM3.00
<br />SOUND MASKING - EXPLANDED FLOOR PLAN
<br />x
<br />SM9.00
<br />SOUND MASKING - SCHEMATICS
<br />x
<br />SM9.01
<br />SOUND MASKING - SCHEMATICS, CONT I)
<br />x
<br />fi'' 0
<br />" YJ
<br />Otak Architects, Inc.
<br />808 SW Third Avenue, Ste 800
<br />Portland, 9R 97204
<br />503.287.6825
<br />www.otak.com
<br />STAMP -
<br />CONSULTANT
<br />0
<br />Oct
<br />0
<br />0
<br />00
<br />0
<br />9
<br />TITLE
<br /># DATE DESCRIF
<br />A 04/17/2020 PLAN REV
<br />B 05/20/2020 PERMIT R
<br />C 05/20/2020 PLAN RED
<br />'TION
<br />ISIONS
<br />EVIEW 1
<br />ISIONS
<br />KE MS
<br />DRAWN BY CHECK BY
<br />100% ISSUE SETIBID SET
<br />STATUS
<br />04/17/2020
<br />DATE
<br />328801
<br />PROJECT NUMBER
<br />@ 2020 OTAK, INC.
<br />If this drawing is not 24"x 36", if has been
<br />reduced/enlarged. Scale accordingly.
<br />
|