Laserfiche WebLink
ABBREVIATIONS <br /># <br />NUMBER <br />GA <br />GAUGE, GYPSUM ASSOCIATION <br />PLAM <br />PLASTIC LAMINATE <br />& <br />AND <br />GAL <br />GALVANIZED <br />PL <br />PLATE, PROPERTY LINE <br />CENTERLINE <br />GB <br />GRAB BAR <br />PLYWD <br />PLYWOOD <br />GPM <br />GALLONS PER MINUTE <br />PNL <br />PANEL_ <br />AC <br />ACRE <br />GYP <br />GYPSUM <br />PNT <br />PAINT <br />ACC <br />ACCESSIBLE <br />PR <br />PAIR <br />AED <br />AUTOMATED <br />HB <br />HOSE BIB <br />PREFIN <br />PREFINISHED <br />EXTERNAL <br />HC-PHB <br />HOLLOW CORE PRIMED <br />PREPR <br />PRE -PRIMED <br />DEFIBRILLATOR <br />HARDBOARD <br />PT <br />PRESSURE TREATED, POST <br />AFF <br />ABOVE FINISH FLOOR <br />HDR <br />HEADER <br />TENSION <br />ADJ <br />ADJUSTABLE <br />HDW <br />HARDWARE <br />AHU <br />AIR HANDLING UNIT <br />HM <br />HOLLOW METAL <br />R <br />RISER, RADIUS <br />ALUM <br />ALUMINUM <br />HORIZ <br />HORIZONTAL <br />R & S <br />ROD AND SHELF <br />APPROX APPROXIMATE <br />HR <br />HOUR <br />RCP <br />REFLECTED CEILING PLAN(S) <br />APT <br />APARTMENT <br />HVAC <br />HEATING VENTILATION AND AIR <br />RD <br />ROOF DRAIN <br />CONDITIONING <br />REF <br />REFERENCE <br />BD <br />BOARD <br />REFL <br />REFLECTED <br />BDRM <br />BEDROOM <br />IBC <br />INTERNATIONAL BUILDING <br />REFR <br />REFRIGERATOR <br />BLDG <br />BUILDING <br />CODE <br />READ <br />REQUIRED <br />BLKG <br />BLOCKING <br />IN <br />INCH <br />R/R <br />RESTROOM <br />BM <br />BEAM <br />INFO <br />INFORMATION <br />RM <br />ROOM <br />BOT <br />BOTTOM <br />INSUL <br />INSULATE(D), (ION) <br />RO <br />ROUGH OPENING <br />BR <br />BEDROOM <br />INT <br />INTERIOR <br />SAMF <br />SELF -ADHERING MEMBRANE <br />CIP <br />CAST -IN -PLACE <br />JAN <br />JANITOR'S <br />FLASHING <br />CJ <br />CONTROL JOINT <br />JST <br />JOIST <br />SD <br />SMOKE DETECTOR <br />CL <br />CLOSET <br />SF <br />SQUARE FOOT <br />CLG <br />CEILING <br />KDHM <br />KNOCK -DOWN HOLLOW METAL <br />SHTHG <br />SHEATHING <br />CLR <br />CLEARANCE) <br />KIT <br />KITCHEN <br />SIM <br />SIMILAR <br />CMU <br />CONCRETE MASONRY UNIT <br />SPEC <br />SPECIFICATION <br />CPT <br />CARPET <br />LAM <br />LAMINATE <br />STD <br />STANDARD <br />COIL <br />COLUMNS <br />LAUN <br />LAUNDRY <br />STIL <br />STEEL <br />CONT <br />CONTINUOUS <br />LID <br />LOAD <br />STOR <br />STORAGE <br />CONC <br />CONCRETE <br />LGT <br />LIGHT <br />STC <br />SOUND TRANSMISSION CLASS <br />CGRR <br />CORRIDOR <br />LN <br />LINEN <br />STRUCT <br />STRUCTURAL <br />LVT <br />LUXURY VINYL TILE <br />SV <br />SHEET VINYL <br />D <br />DRYER <br />LW <br />LIVE/WORK <br />DBL <br />DOUBLE <br />T <br />TREAD, TEMPERED <br />DF <br />DRINKING FOUNTAIN <br />MAINT <br />MAINTENANCE <br />T & G <br />TONGUE & GROOVE <br />DIA <br />DIAMETER <br />MAIL <br />MATERIAL <br />TB <br />TOWEL BAR <br />DIM <br />DIMENSION <br />MAX <br />MAXIMUM <br />TG <br />TEMPERED GLASS <br />DN <br />DOWN <br />MDF <br />MEDIUM DENSITY FIBERBOARD <br />THK <br />THICK, THICKNESS <br />DR <br />DOOR <br />MECH <br />MECHANICAL <br />TO <br />TOP OF <br />DS <br />DOWN SPOUT <br />MEMB <br />MEMBRANE <br />TP <br />TOILET PAPER <br />DU <br />DWELLING UNIT <br />MFR <br />MANUFACTURER <br />T/S <br />TUB/SHOWER <br />DW <br />DISHY/DASHER <br />MIN <br />MINIMUM <br />TYP <br />TYPICAL <br />DWG <br />DRAWING <br />MIRR <br />MIRRORED) <br />MISC <br />MISCELLANEOUS <br />UNO <br />UNLESS NOTED OTHERWISE <br />EA <br />EACH <br />MTL <br />METAL <br />UNFIN <br />UNFINISHED <br />EJ <br />EXPANSION JOINT <br />EL <br />ELEVATION <br />N <br />NORTH <br />VCT <br />VINYL COMPOSITION TILE <br />_FL EC <br />ELECTRICAL <br />NA <br />NOT APPLICABLE <br />VERT <br />VERTICAL <br />ELEV <br />ELEVATOR <br />NIC <br />NOT IN CONTRACT <br />VRFY <br />VERIFY <br />EP <br />ELECTRICAL PANEL <br />NO <br />NUMBER <br />EQUIP <br />EQUIPMENT <br />NR <br />NON RATED <br />W <br />WASHER <br />EQ <br />EQUAL <br />NTS <br />NOT TO SCALE <br />W/ <br />WITH <br />(E) <br />EXISTING <br />WD <br />WOOD <br />EXT <br />EXTERIOR <br />0C <br />ON CENTER <br />WH <br />WATER HEATER <br />OCC <br />OCCUPANT(S), OCCUPANCY, <br />WIC <br />WALK IN CLOSET <br />FCP <br />FIBER CEMENT PANEL <br />(IES) <br />WIN <br />WINDOW <br />FD <br />FLOOR DRAIN <br />OL F <br />OCCUPANT LOAD FACTOR <br />WP <br />WATERPROOF <br />FEC <br />FIRE EXTINGUISHER CABINET <br />OPP <br />OPPOSITE <br />WR <br />WATER RESISTANT <br />FIN <br />FINISH <br />OPNG <br />OPENING <br />WRB <br />WATER RESISTANT BARRIER <br />FIR <br />FLOOR <br />ORD <br />OVERFLOW ROOF DRAIN <br />FND <br />FOUNDATION <br />OSB <br />ORIENTED STRAND BOARD <br />FO <br />FACE OF <br />OSSC <br />OREGON STRUCTURAL <br />FOC <br />FACE OF CONCRETE <br />SPECIALTY CODE <br />FOF <br />FACE OF FINISH <br />OVFL <br />OVERFLOW <br />FOS <br />FACE OF STUD <br />FOW <br />FACE OF WALL <br />FT <br />FEET <br />FTG <br />FOOTING WALL <br />ASSEMBLY TAG <br />WINDOW TAG <br />Al <br />DOOR TAG <br />NORTH ARROW <br />1 U8.O <br />DETAILTAGS <br />EXTERIOR ELEVATION TAG <br />INTERIOR ELEVATION TAG <br />1 /%, <br />A4.01 A4,01 BUILDING SECTION TAG <br />z1 _� WALL SECTION TAG <br />A4,11 <br />TOP OF SLAB <br />100'-0" ELEVATION DATUM <br />GRID LINE/ GRID BUBBLE <br />4 E <br />Sheet <br />Number <br />Sheet Name <br />GENERAL <br />G0.00 <br />COVER SHEET <br />G0.01 <br />SHEET INDEX, ABBREVIATIONS, AND SYMBOLS <br />G1.01 <br />CODE SUMMARY <br />G2,01 <br />FIRE LIFE SAFETY PLAN - LEVEL 01 <br />G2.02 <br />FIRE LIFE SAFETY PLAN - LEVEL 02 <br />G3.01 <br />ACCESSIBILITY DETAILS <br />G4.01 <br />SITE PLAN <br />DEMOLITION <br />D1.01 a <br />DEMO PLAN - LEVEL 01 - A <br />D1.01 b <br />DEMO PLAN - LEVEL 01 - B <br />D1.02a <br />DEMO PLAN - LEVEL 02 - A <br />D1.02b <br />DEMO PLAN - LEVEL 02 - B <br />D1.03 <br />DEMO PLAN - ROOF <br />D2.01 <br />DEMO ELEVATIONS <br />CIVIL <br />C0.01 <br />NOTES AND LEGEND <br />C0.02 <br />CITY OF EVERETT STANDARD NOTES <br />C0.03 <br />EXISTING CONDITIONS AND SURVEY CONTROL PLAN <br />C0.04 <br />EXISTING CONDITIONS AND SURVEY CONTROL PLAN <br />C1.01 <br />TESC PLAN <br />C1.02 <br />SITE DEMOLITION PLAN <br />C2.01 <br />CIVIULANDSCAPE OVERVIEW SITE PLAN <br />C3.01 <br />PAVING PLAN <br />C3,02 <br />PAVING PLAN <br />C3.03 <br />SITE GRADING PLAN <br />C3.04 <br />SITE GRADING PLAN <br />C3.05 <br />SITE LAYOUT POINT TABLE <br />C3.06 <br />PLAZA AND SIDEWALK GRADING PLAN <br />n� <br />C4,01 <br />DRAINAGE PLAN <br />M <br />C4.02 <br />DRAINAGE PLAN <br />0- <br />C4,03 <br />DRAINAGE PROFILES <br />� <br />C4,04 <br />DRAINAGE DETAILS <br />C4.05 <br />DRAINAGE DETAILS <br />C4.06 <br />STORMWATER DETENTION VAULT PLAN <br />M <br />C4.07 <br />STORMWATER DETENTION VAULT SECTION <br />C4.08 <br />STORMWATER DETENTION VAULT DETAILS <br />C4,09 <br />STORMWATER TREATMENT FACILITY PLAN <br />® <br />C410 <br />STORMWATER TREATMENT FACILITY <br />C5.01 <br />WATER AND SEWER PLAN <br />C5.02 <br />WATER AND SEWER PLAN <br />C6.01 <br />SIGNING AND STRIPING PLAN <br />C6.02 <br />SIGN SCHEDULE AND STRIPING DETAILS <br />C7.01 <br />PAVEMENT AND SIDEWALK DETAILS <br />C7.02 <br />CONCRETE WALL AND STAIR DETAILS I <br />C7,03 <br />CONCRETE WALL AND STAIR DETAILS 11 <br />C7.04 <br />WALL DETAILS <br />LANDSCAPE <br />L1.01 <br />PLAZA HARDSCAPE PLAN <br />L1,02 <br />LANDSCAPE SITE DETAILS <br />L2.01 <br />PLANTING PLAN <br />L2.02 <br />PLANTING PLAN <br />1_2.03 <br />LANDSCAPE SCHEDULE &DETAILS <br />L3,01 <br />IRRIGATION PLAN <br />L3.02 <br />IRRIGATION PLAN <br />L3.03 <br />IRRIGATION DETAILS I <br />1-104 <br />IRRIGATION DETAILS 11 <br />L3.05 <br />IRRIGATION DETAILS III <br />STRUCTURAL <br />S0,00 <br />STRUCTURAL COVER SHEET <br />S0.01 <br />GENERAL STRUCTURAL NOTES <br />S0.02 <br />GENERAL STRUCTURAL NOTES <br />S0.03 <br />SPECIAL INSPECTIONS <br />S2.01 <br />FOUNDATION PLAN - OVERALL <br />S2.01 a <br />FOUNDATION PLAN -A <br />S2.01 b <br />FOUNDATION PLAN - B <br />S2.02 <br />SECOND FLOOR PLAN - OVERALL <br />S2.02a <br />SECOND FLOOR FRAMING PLAN - A <br />S2,02b <br />SECOND FLOOR FRAMING PLAN - B <br />S2.03 <br />ROOF PLAN - OVERALL <br />S2.03a <br />ROOF FRAMING PLAN -A <br />S2.03b <br />ROOF FRAMING PLAN - B <br />S2.04 <br />ENLARGED PLANS <br />S2,05 <br />ENLARGED PLANS <br />S2.06 <br />ENLARGED PLANS <br />S3.01a <br />BUILDING ELEVATIONS -A <br />S3.01b <br />BUILDING ELEVATIONS - B <br />S3.02 <br />ENLARGED ELEVATIONS <br />S3,03 <br />ENTRY VESTIBULE SECTIONS <br />S4.00 <br />STAIR PLANS AND SECTIONS <br />S4.01 <br />STAIR PLANS AND SECTIONS <br />S4.10 <br />STAIR AND ELEVATOR DETAILS <br />S5.01 <br />FOUNDATION DETAILS <br />S5.02 <br />FOUNDATION DETAILS <br />D <br />AAS5, <br />FOUN ATION DETAILS <br />01 <br />M1 E - D <br />S6.02 <br />FRAMING DETAILS - WOOD <br />S6.03 <br />FRAMING DETAILS - WOOD <br />S6.04 <br />FRAMING DETAILS - WOOD <br />%05 <br />FRAMING DETAILS - WOOD <br />S6.06 <br />FRAMING DETAILS -WOOD <br />S6,11 <br />FRAMING DETAILS - CFS <br />FR IN1 CF <br />B <br />�%1�3FRAMIILS <br />- FS <br />M <br />Sheet <br />Number Sheet Name <br />ARCHITECTURE <br />A1.01 <br />CONSTRUCTION ASSEMBLIES <br />A1.11 <br />DOOR SCHEDULE & TYPES <br />A1.12 <br />WINDOW SCHEDULE & TYPES <br />A2.01 <br />PLAN - LEVEL 01 - OVERALL <br />A2.01 s <br />SLAB PLAN - LEVEL 01 <br />A2.01 a <br />PLAN - LEVEL 01 - A <br />A2.01 b <br />PLAN - LEVEL 01 - B <br />A2.02 <br />PLAN - LEVEL 02 - OVERALL <br />A2.02a <br />PLAN - LEVEL 02 - A <br />A2.02b <br />PLAN - LEVEL 02 - B <br />A2.03 <br />ROOF PLAN <br />A3.01 <br />EXTERIOR ELEVATIONS <br />A3,02 <br />EXTERIOR ELEVATIONS <br />A3.03 <br />EXTERIOR ELEVATIONS <br />A3.04 <br />EXTERIOR ELEVATIONS <br />A4.01 <br />BUILDING SECTIONS <br />A4.02 <br />BUILDING SECTIONS <br />A4.03 <br />WALL SECTIONS <br />A4,04 <br />WALL SECTIONS <br />A4.05 <br />WALL SECTIONS <br />A4.06 <br />WALL SECTIONS - INTERIOR <br />A4.07 <br />WALL SECTIONS - INTERIOR <br />A5.01 a <br />RCP - LEVEL 01 - A <br />A5.01 b <br />RCP - LEVEL 01 - B <br />A5.02a <br />RCP - LEVEL 02 - A <br />A5.02b <br />RCP - LEVEL 02 - B <br />A6.01 <br />ENLARGED PLANS - MAIN ENTRY AND EAST ADDITION <br />A6.02 <br />STAIR AND ELEVATOR PLANS AND SECTIONS <br />A6.03 <br />STAIR AND ELEVATOR PLANS AND SECTIONS <br />A6.04 <br />ENLARGED PLANS <br />A6.05 <br />ENLARGED PLANS <br />A6.06 <br />ENLARGED PLANS <br />A7.01 <br />INTERIOR ELEVATIONS <br />A8.01 <br />EXTERIOR DETAILS <br />A8.02 <br />EXTERIOR DETAILS <br />A8.03 <br />EXTERIOR DETAILS <br />A8.04 <br />EXTERIOR DETAILS <br />A8.05 <br />EXTERIOR DETAILS <br />A8.06 <br />EXTERIOR ROOF DETAILS <br />A8.11 <br />INTERIOR DETAILS <br />A8.12 <br />INTERIOR DETAILS <br />A8.13 <br />INTERIOR DETAILS <br />A8.14 <br />FIRE RATED WALL ASSEMBLIES <br />INTERIORS <br />ID1,01 <br />ENLARGED FLOOR PLANS <br />ID2.01 <br />INTERIOR ELEVATIONS <br />ID2.02 <br />INTERIOR ELEVATIONS <br />1D2.03 <br />INTERIOR ELEVATIONS <br />ID2.04 <br />INTERIOR ELEVATIONS <br />ID2.05 <br />INTERIOR ELEVATIONS <br />D2.�7 <br />INTE IOR ELEVATIONS <br />rID2.09 <br />D2.08 <br />INTERIOR DETAIL S <br />INTERIOR DETAILSD2. <br />0 <br />RIDETAILS s <br />"ER <br />C <br />3,0 <br />FI SC UL <br />ID3.04a <br />INTERIOR FINISH PLAN - LEVEL 01 - A <br />ID3.04b <br />INTERIOR FINISH PLAN - LEVEL 01 - B <br />ID3.05a <br />INTERIOR FINISH PLAN - LEVEL 02 - A <br />ID3.05b <br />INTERIOR FINISH PLAN - LEVEL_ 02 - B <br />ID3,06a <br />REFERENCE PLAN - LEVEL - 01- A <br />ID3.06b <br />REFERENCE PLAN - LEVEL - 01 - B <br />03,07a <br />REFERENCE PLAN - LEVEL - 02 - A <br />ID3.07b <br />REFERENCE PLAN - LEVEL - 02 - B <br />FIRE PROTECTION <br />FP0,01 <br />FIRE PROTECTION LEGEND AND SHEET INDEX <br />FD2.01 <br />FIRE PROTECTION ZONE PLANS - OVERALL DEMO <br />FP2,01 <br />FIRE PROTECTION ZONE PLANS - OVERALL <br />FP5.01 <br />FIRE PROTECTION DIAGRAMS <br />PLUMBING <br />W <br />P0.01 <br />PLUMBING LEGEND AND INDEX <br />PD2.00 <br />PLUMBING DEMOLITION PLAN - FOUNDATION - OVERALL <br />0- <br />PD2,01 <br />PLUMBING DEMOLITION PLAN - LEVEL 01 - OVERALL <br />LLJ <br />PD2.02 <br />PLUMBING DEMOLITION PLAN - LEVEL 02 - OVERALL <br />P2.00a <br />PLUMBING PLAN - FOUNDATION - A <br />P2.00b <br />PLUMBING PLAN - FOUNDATION - B <br />P2.01 a <br />PLUMBING PLAN - LEVEL 01 - A <br />Uj <br />(7) <br />P2.01b <br />PLUMBING PLAN - LEVEL 01 - B <br />Q� <br />P2.02a <br />PLUMBING PLAN - LEVEL 02 - A <br />P2.02b <br />PLUMBING PLAN - LEVEL 02 - B <br />P2.03 <br />PLUMBING PLAN - ROOF <br />P4,01 <br />ENLARGED PLANS <br />P4.02 <br />ENLARGED PLANS <br />P5:01 <br />PLUMBING DETAILS <br />P6.01 <br />PLUMBING SCHEDULES <br />P7,01 <br />PLUMBING DIAGRAMS <br />P7.02 <br />PLUMBING DIAGRAMS <br />P7,03 <br />PLUMBING DIAGRAMS - NORTH <br />PT04 <br />PLUMBING DIAGRAMS - SOUTH <br />b LO <br />�r L <br />6 <br />CDUj 0 <br />" <br />Sheet <br />® QjQ. <br />, <br />®® <br />Number Sheet Name <br />�, Q <br />MECHANICAL <br />M 1 FN AN D <br />0.0 <br />HVAC LEGS D DIN EX <br />x <br />M0.02 <br />2015WSEC COMPLIANCE <br />x " <br />MD2.01 a <br />HVAC DEMO PLAN - LEVEL 01 - A <br />x <br />MD2.01 b <br />HVAC DEMO PLAN - LEVEL 01 - B <br />x , <br />MD2.02a <br />HVAC DEMO PLAN - LEVEL 02 - A <br />x <br />MD2.02b <br />HVAC DEMO PLAN - LEVEL 02 - B <br />x <br />MD2.03 <br />HVAC DEMO PLAN - ROOF - OVERALL <br />x <br />M1.00 <br />HVAC ZONING PLANS - OVERALL <br />M2.01a <br />HVAC FLOOR PLAN - LEVEL 01 -A <br />x <br />x <br />M2.01 b <br />HVAC FLOOR PLAN - LEVEL 01 - B <br />x <br />x <br />M2.02a <br />HVAC FLOOR PLAN - LEVEL 02 - A <br />x <br />x <br />M2.02b <br />HVAC FLOOR PLAN - LEVEL 02 - B <br />x <br />M2.03a <br />HVAC ROOF PLAN - A <br />x <br />M2.03b <br />HVAC ROOF PLAN - B <br />x <br />x <br />M2.11 a <br />HVAC PIPING FLOOR PLAN - LEVEI 01 -A <br />x <br />x <br />M2.11 b <br />HVAC PIPING FLOOR PLAN - LEVEL 01 - B <br />x <br />x: <br />M2.12a <br />HVAC PIPING FLOOR PLAN - LEVEL 02 - A <br />x <br />x <br />M2.12b <br />HVAC PIPING FLOOR PLAN - LEVEL 02 - B <br />x <br />x <br />M4.01 <br />ENLARGED PLANS <br />x <br />x <br />M4.02 <br />ENLARGED PLANS <br />x <br />x <br />M4.03 <br />ENLARGED PLANS <br />x <br />x <br />M4.04 <br />HVAC SECTIONS <br />x <br />M4,05 <br />HVAC SECTIONS <br />x <br />M4.06 <br />HVAC SECTIONS <br />x <br />M4.07 <br />ENLARGED PLANS <br />x <br />x <br />M4.08 <br />HVAC SECTIONS <br />x <br />x <br />M5.01 <br />HVAC DETAILS <br />x <br />M5.02 <br />HVAC DETAILS <br />x <br />M5.03 <br />AIR HANDLER & CRAC DETAILS <br />x <br />x <br />%01 <br />HVAC SCHEDULES <br />x , <br />x <br />M6,02 <br />HVAC SCHEDULES <br />x ` <br />x <br />0� <br />M6.03 <br />HVAC SCHEDULES <br />x <br />x <br />M7.01 <br />HVAC DIAGRAMS <br />x <br />x <br />M8.01 <br />CONTROLS <br />x <br />M8,02 <br />CONTROLS <br />x <br />M8.03 <br />CONTROLS <br />x <br />M8.04 <br />CONTROLS <br />x <br />CL <br />W <br />M8.05 <br />CONTROLS <br />x ' <br />x <br />W <br />ELECTRICAL <br />0 <br />E0.01 <br />ELECTRICAL SYMBOLS AND ABBREVIATIONS <br />x <br />z <br />E1.00 <br />ELECTRICAL DEMOLITION PLAN - SITE <br />x <br />E1,01 <br />ELECTRICAL DEMOLITION PLAN - LEVEL 01 <br />x ` <br />E1.02 <br />ELECTRICAL DEMOLITION PLAN - LEVEL 02 <br />x <br />E1.03 <br />ELECTRICAL DEMOLITION PLAN - ROOF <br />x <br />E2.01 <br />ELECTRICAL SITE PLAN <br />x <br />x <br />E3.01 a <br />POWER PLAN - LEVEL 01 - A <br />x <br />x <br />E3.01 b <br />POWER PLAN - LEVEL 01 - B <br />x <br />x <br />E3.02a <br />POWER PLAN - LEVEL 02 - A <br />x <br />x <br />E3.02b <br />POWER PLAN - LEVEL 02 - 8 <br />x <br />x <br />E3.03 <br />POWER PLAN - ROOF <br />x <br />E3.11 a <br />LIGHTING PLAN - LEVEL 01 - A <br />x <br />E3A 1b <br />LIGHTING PLAN - LEVEL 01 - B <br />x <br />E3.12a <br />LIGHTING PLAN - LEVEL 02-A <br />x <br />E3.12b <br />LIGHTING PLAN - LEVEL 02 - B <br />x <br />E4.01 <br />ENLARGED PLAN - ELECTRICAL._. ROOM <br />x <br />E5.01 <br />ELECTRICAL DETAILS <br />x , <br />E6.01 <br />ONE -LINE DIAGRAM - DEMOLITION <br />x <br />E6.02 <br />ONE -LINE DIAGRAM - CONSTRUCTION <br />x <br />E6.04 <br />PANEL SCHEDULES <br />x ; <br />E6.05 <br />PANELSCHEDULES <br />x <br />E6.06 <br />PANEL SCHEDULES <br />x <br />x <br />E6.07 <br />PANEL SCHEDULES <br />x <br />x <br />E6,08 <br />PANEL SCHEDULES <br />x <br />E7.01 <br />LUMINAIRE SCHEDULE <br />x <br />E7.02 <br />LUMINAIRE SCHEDULE <br />x < <br />E7.03 <br />LUMINAIRE SCHEDULE <br />x , <br />E7.04 <br />LUMINAIRE SCHEDULE <br />x <br />E7.05 <br />LIGHT POLE AND EXISTING LUMINAIRE SCHEDULES <br />x . <br />E8.01 <br />LIGHTING CONTROL SCHEDULE & ABBREVIATIONS <br />x <br />E8A 1 a <br />LIGHTING CONTROL PLAN - LEVEL 01 - A <br />x <br />E8.11 b <br />LIGHTING CONTROL PLAN - LEVEL 01 - B <br />x <br />E8.12a <br />LIGHTING CONTROL PLAN - LEVEL 02 - A <br />x ` <br />E8.12b <br />LIGHTING CONTROL PLAN - LEVEL 02 - B <br />x <br />ELECTRICAL <br />- DATA CENTER <br />E9.01 <br />COVER SHEET AND DRAWING INDEX <br />x <br />E9.02 <br />SYMBOLS LEGEND, ABBREVIATIONS AND PROJECT GENERAL <br />NOTES <br />x <br />E9.03 <br />FEEDER AND BRANCH CIRCUIT SCHEDULES <br />x <br />E9,04 <br />EXISTING UPS LOAD HISTORY <br />x <br />E9.05 <br />EXISTING UPS LOAD HISTORY & BASIC SPECIFICATIONS <br />x <br />E9.10 <br />PARTIAL ONE -LINE DIAGRAM <br />x <br />E9.20 <br />POWER & GROUNDING PLAN <br />x <br />E9.30 <br />LIGHTING PLAN, PHOTOMETRIC PLAN AND FIXTURE <br />SCHEDULE <br />x <br />E9.40 <br />PANEL SCHEDULES <br />x <br />'t <br />LO <br />Sheet <br />Number <br />Sheet Name <br />o p <br />a <br />o <br />�' <br />COMMUNICATIONS SYSTEM <br />-LA-00 <br />DRAWING INDEX <br />x <br />x <br />T-A-01 <br />SYMBOLS, ABBREVIATIONS AND NOTES <br />x <br />T-D-11 <br />LEVEL 1 COMMUNICATIONS PATHWAY PLAN - OVERALL <br />x <br />T-D-11A <br />LEVEL 1 COMMUNICATIONS PATHWAY PLAN - A <br />x <br />T-D-11 B <br />LEVEL 1 COMMUNICATIONS PATHWAY PLAN - B <br />x <br />T-D-12 <br />LEVEL 1 WORKSTATION OUTLET PLAN - OVERALL <br />x <br />x <br />T-D-12A <br />LEVEL 1 WORKSTATION OUTLET PLAN - A <br />x <br />x <br />T-D-12B <br />LEVEL 1 WORKSTATION OUTLET PLAN - B <br />x <br />x <br />T-D-13 <br />LEVEL 1 COMMUNICATIONS WIRELESS LAYOUT - OVERALL <br />x <br />T-D-13A <br />LEVEL 1 COMMUNICATIONS WIRELESS LAYOUT -A <br />x <br />T-D-1313 <br />LEVEL 1 COMMUNICATIONS WIRELESS LAYOUT - B <br />x <br />T-D-21 <br />LEVEL 2 COMMUNICATIONS PATHWAY PLAN - OVERALL <br />x <br />T-D-21A <br />LEVEL 2 COMMUNICATIONS PATHWAY PLAN - A <br />x <br />T-D-21 B <br />LEVEL 2 COMMUNICATIONS PATHWAY PLAN - B <br />x <br />T-D-22 <br />LEVEL 2 WORKSTATION OUTLET PLAN - OVERALL <br />x <br />x <br />j <br />T-D-22A <br />LEVEL 2 WORKSTATION OUTLET PLAN - A <br />x <br />x <br />T-D-2213 <br />LEVEL 2 WORKSTATION OUTLET PLAN - B <br />x <br />x <br />T-D-23 <br />LEVEL 2 COMMUNICATIONS WIRELESS LAYOUT - OVERALL <br />x <br />T-D-23A <br />LEVEL 2 COMMUNICATIONS WIRELESS LAYOUT - A <br />x <br />T-D-23B <br />LEVER COMMUNICATIONS WIRELESS LAYOUT B <br />x <br />-F E-011 <br />LEVEL 1 DATA CENTER 116 LAYOUT <br />x <br />T-E-012 <br />LEVEL 1 DATA CENTER 116 LAYOUT <br />x <br />T-E-013 <br />LEVEL 1 DATA CENTER 116 FIBER ONE -LINE DIAGRAM <br />x <br />T-E-014 <br />LEVEL 1 OF ELEC ROOM 078 LAYOUT <br />x <br />T-E-015 <br />LEVEL 1 IDF CBLE ROOM 068 LAYOUT <br />x' <br />T-E-021 <br />LEVEL 2 OF CABLE ROOM 204 LAYOUT <br />x <br />T-E-022 <br />LEVEL 21DF 5 CABLE ROOM 296 LAYOUT <br />x <br />T-F-01 <br />FIBER ONE LINE DIAGRAM <br />x <br />T-F-02 <br />GROUNDING ONE LINE DIAGRAM <br />x , <br />T-F-03 <br />CONDUIT ONE LINE DIAGRAM <br />x <br />T-G-01 <br />COMf`u7UNICATIONS DETAILS <br />x . <br />W <br />T-G-02 <br />COMMUNICATIONS DETAILS <br />x <br />W <br />T-G-03 <br />COMMUNICATIONS DETAILS <br />x <br />W <br />T-G-04 <br />TYPICAL LABELING DETAILS <br />x <br />A/V SYSTEM <br />AV-A-00 <br />DRAWING INDEX <br />x <br />x <br />W <br />AV-A-001 <br />SYMBOLS, ABBREVIATIONS AND NOTES <br />x <br />AV -010 <br />LEVEL 1 AV PLAN -OVERALL <br />x <br />x <br />M <br />AV-D 01A <br />LEVEL 1 AV PLAN A <br />x <br />C <br />AV-D-01 B <br />LEVEL 1 AV PLAN - B <br />x <br />x <br />AV-D-01 <br />LEVEL 2 AV PLAN - OVERALL <br />x <br />AV-D-02A <br />LEVEL 2 AV PLAN - A <br />x <br />AV- -02B <br />LEVEL 2 AV PLAN - B <br />x <br />O <br />-G- 01 <br />AV DETAILS <br />x <br />AV-G-002 <br />AV DETAILS <br />x , <br />AV-G-003 <br />AV DETAILS <br />x . <br />AV-G-004 <br />AV DETAILS <br />x <br />AV-G-005 <br />AV DETAILS <br />x <br />AV-G-006 <br />AV DETAILS <br />x <br />AV-G-007 <br />AV DETAILS <br />x <br />SECURITY SYSTEM <br />S-A-000 <br />DRAWING INDEX <br />x <br />x <br />S-A-001 <br />SYMBOLS, ABBREVIATIONS AND NOTES <br />x <br />S-D-001 <br />SITE SECURITY EXTERIOR PLAN <br />x <br />x . <br />S-D-010 <br />LEVEL 1 INTERIOR SECURITY PLAN - OVERALL <br />x <br />x <br />S-D-01A <br />LEVEL 1 INTERIOR SECURITY PLAN - A <br />x <br />x <br />S D 01 B <br />LEVEL 1 INTERIOR SECURITY PLAN B <br />x <br />x <br />S-D-020 <br />LEVEL 2 INTERIOR SECURITY PLAN - OVERALL <br />x <br />x <br />S-D-02A <br />LEVEL 2 INTERIOR SECURITY PLAN - A <br />x <br />x <br />S-D-02B <br />LEVEL 2 INTERIOR SECURITY PLAN - B <br />x <br />x, <br />S-G-001 <br />SECURITY DETAILS <br />x <br />S-G-002 <br />SECURITY DETAILS <br />x <br />S-G-003 <br />SECURITY DETAILS <br />x <br />S-G-004 <br />SECURITY DETAILS <br />x ; <br />S-G-005 <br />SECURITY DETAILS <br />x <br />S-G-006 <br />SECURITY DETAILS <br />x <br />SOUND MASKING SYSTEM <br />SMq.00 <br />COVER SHEET, INDEX, ABBREVIATIONS & SCHEDULE OF <br />SCOPE <br />x <br />SM0.01 <br />SYMBOL LEGEND <br />x <br />SM0:02 <br />OVERVIEW LEVEL 01 <br />x <br />SM0.03 <br />OVERVIEW LEVEL 02 <br />x <br />} <br />SM1.00 <br />SOUND MASKING - LEVEL 01 - A RCP <br />x <br />SM1.01 <br />SOUND MASKING - LEVEL 01- B RCP <br />x <br />SM1.02 <br />SOUND MASKING - LEVEL 02 - A RCP <br />x <br />SM1.03 <br />SOUND MASKING - LEVEL 02 - B RCP <br />x <br />SM3.00 <br />SOUND MASKING - EXPLANDED FLOOR PLAN <br />x <br />SM9.00 <br />SOUND MASKING - SCHEMATICS <br />x <br />SM9.01 <br />SOUND MASKING - SCHEMATICS, CONT I) <br />x <br />fi'' 0 <br />" YJ <br />Otak Architects, Inc. <br />808 SW Third Avenue, Ste 800 <br />Portland, 9R 97204 <br />503.287.6825 <br />www.otak.com <br />STAMP - <br />CONSULTANT <br />0 <br />Oct <br />0 <br />0 <br />00 <br />0 <br />9 <br />TITLE <br /># DATE DESCRIF <br />A 04/17/2020 PLAN REV <br />B 05/20/2020 PERMIT R <br />C 05/20/2020 PLAN RED <br />'TION <br />ISIONS <br />EVIEW 1 <br />ISIONS <br />KE MS <br />DRAWN BY CHECK BY <br />100% ISSUE SETIBID SET <br />STATUS <br />04/17/2020 <br />DATE <br />328801 <br />PROJECT NUMBER <br />@ 2020 OTAK, INC. <br />If this drawing is not 24"x 36", if has been <br />reduced/enlarged. Scale accordingly. <br />